ground reinforcement Articles

  • Achnagairn House

    In the spring of 2009, the owners of Achnagairn House, a stunning mansion in the Scottish Highlands, were faced with a major landscaping problem The 24 bedroomed listed property had been meticulously refurbished to the most luxurious of standards to provide an unrivalled setting for highprofile corporate functions and exclusive weddings. However restrictive access to the hotel meant the owners ...

  • Excavator vibratory compactor case

    Excavator vibratory compactor is an excavator attached to an excavator and used to reinforce the ground. Because of its exciting force, the amplitude is greater than the vibration plate compacted more than ten times to dozens of times, can replace the ramming machine use, and its cost-effective, has always been tamped ...


    By lydite trading company

  • Excavator vibratory compactor case

    Excavator vibratory compactor is an excavator attached to an excavator and used to reinforce the ground. Because of its exciting force, the amplitude is greater than the vibration plate compacted more than ten times to dozens of times, can replace the ramming machine use, and its cost-effective, has always been tamped ...

  • BeiYi participates the construction of the main venue of the Shanghai Cooperation Organization Qingdao Summit

    From June 9 to June 10, 2018, the 18th meeting of the Council of Heads of State of the Shanghai Cooperation Organization member states (short as Qingdao Summit) was held in Qingdao, Shandong Province. The event was eye-catching, and many people also noticed the Qingdao International Convention Center, the main venue for the conference like Seagull's wings. The building symbolizes “ Catch ...


    By lydite trading company

  • BeiYi take part in construction of Qingdao Summit

    From June 9 to June 10, 2018, the 18th meeting of the Council of Heads of State of the Shanghai Cooperation Organization member states (short as Qingdao Summit) was held in Qingdao, Shandong Province. The event was eye-catching, and many people also noticed the Qingdao ...

  • Commerce Park Giesen-Harsum-Hildesheim case study

    Building on an old dump The communities Giesen and Harsum along with the City of Hildesheim, Germany jointly planned the construction of a commerce park covering an area of 240ha. The section of the premises on which buildings were to be erected encompassed an area of 50ha. The only access road passed over a former garbage and building-trash landfill. Dumping in this area was ...


    By NAUE GmbH & Co.KG

  • Leachate treatment solution for council – Landfill Site, Camarthenshire

    Plant Equipment: Ocean Professional Nitrification Plant Design Data: Effluent target (NH4-N): <4 Daily flow (m3/day): 120 Ammonia load (kg/day): 6 BOD load (kg/day): n/a Situation and Problem This site comprises of six landfill cells and phase ...


    By EnSo International Ltd

  • High groundwater site conditions

    Specific site conditions: BIOROCK non-electrical sewage treatment plants are unlike other wastewater treatment systems and are perfectly suitable for high groundwater conditions. BIOROCK plants can be installed in high water table or high groundwater sites by one of our trained installers. Our Research and Development team worked hard to find the best design to fit to difficult UK installation ...


    By BIOROCK S.à.r.l

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you