Secondary Oil Containment at US Army Corps of Engineers - Big Bend Dam - Case Study
Big Bend Dam takes its name from the unique bend in the Missouri River seven miles upstream from the dam. Construction of the dam began in 1959 and the embankment was completed in July 1963. Big Bend dam is 95 feet (29 m) high and 10,570 feet (3,220 m) in length. Power generation began at the facility in 1964 and the entire complex was completed by 1966. The hydroelectric plant generates 493,300 ...
-
Water Quality Monitoring Solutions for Industrial Wastewater
Coftec are leaders in the supply water quality monitoring solutions for industrial wastewater. Process water quality is often extreme in its composition, for example high in acids, solids and other parameters or radically changing temperature. Coftec designs, builds and if required, operate solutions for the managing industrial wastewater streams. We can offer the spectro::lyser titanium pro and ...
By Coftec
Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you