hydrometric monitoring network Articles

  • Hydrometric Network Data Management

    A key part of HL's contract with Dwr Cymru Welsh Water to install, operate and maintain a large network of telemetred reservoir level and compensation flow gauges, a suite of HL's software packages was also supplied to each of the three operational areas for managing time-series data and processing stage-discharge data into a long-term flow record archive. HL's HydroLog4 and Gauger 2 packages ...

  • Hydrometric Network, DCWW case study

    Dwr Cymru Welsh Water, Wales, 2000 - 2008 (ongoing) Rehabilitation and ongoing maintenance of Hydrometric network for monitoring water abstraction and compensation flow gauges across the whole of Wales. Hydro-Logic has been commissioned by Dwr Cymru Welsh Water to install, operate and maintain a large network of telemetry enabled reservoir level and compensation ...


    By Hydro-Logic Services

  • Climate change initiatives and the hydrometric network - coordinating our efforts

    This workshop is designed to bring together those parties in Ontario that are using Ontario hydrometric network information in their Climate Change related projects or programs. The objective is to ensure a coordinated approach in dealing with the issues of monitoring and adaptation planning to minimize duplication of effort and maximize return on network investments and general effort. With the ...

  • The Ontario hydrometric network assessment and design project - user workshop

    In 2001, through a multi-ministry cabinet submission, the Ministry of Natural Resources (MNR) assumed the leadership role for management of the provincial Hydrometric Network. As part of that agreement, MNR assumed the costs for the entire network including Ministry of the Environment (MOE) gauges and conservation authority gauges. Since then, MNR has seen costs increase from $4,800 to $10,400 ...

  • Evaluating hydrometric networks for prediction in ungauged basins: a new methodology and its application to England and Wales

    Flow estimates for ungauged catchments are often derived through regionalisation methods, which enable data transfer from a pool of hydrologically similar catchments with existing gauging stations (i.e., pooling-groups). This paper presents a methodology for indexing the utility of gauged catchments within widely used pooling-group methodologies for high and low flow estimation; this methodology ...


    By IWA Publishing

  • SEPA Logger Supply

    The Isodaq Division have completed delivery of 250 Hawk XT telemetry data logging outstations to the UK's environmental regulator for Scotland, SEPA (Scottish Environmental Protection Agency) as part of a asset replacement project to upgrade 400 obsolete battery-powered outstations deployed at permament flow gauging, flood warning and automatic rain-gauge sites across the whole of Scotland. After ...

  • Dwr Cymru Welsh Water case study

    Dwr Cymru Welsh Water, Wales, 2000 - 2008 (ongoing) Rehabilitation and ongoing maintenance of Hydrometric network for monitoring water abstraction and compensation flow gauges across the whole of Wales. Hydro-Logic has been commissioned by Dwr Cymru Welsh Water to install, operate and maintain a large network of telemetry enabled reservoir level and compensation ...


    By Hydro-Logic Services

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you