incinerator construction Articles

  • Incinerator Residue for Roads

    A study was conducted by the authors to assess the feasibility of using incinerator residue in road construction. Residues from Singapore incinerators were characterized. Various combinations of mixes comprising local clayey-silty-sandy soil and incinerator residue with or without lime were tested for their suitability for use as road subbase/subgrade. Also, bituminous mixes comprising varying ...


    By ASTM International

  • Increase in capacity of an incinerator

    In addition to its own and external products, system providers involved in the project business also provide process knowledge and complete projects refined to the last detail. The standard is high. Their own knowledge combined with the supplier’s knowledge leads to a complete solution. From the delivery of the components to their installation, trial operation and commissioning, all the ...


    By sera GmbH

  • QinetiQ – Modular EU Compliant incineration package - Case Study

    TodaySure™ were commissioned to construct an Integrated Battlefield Support System Incinerator as part of a Ministry of Defence funded research programme, to demonstrate that waste management can be achieved in a responsible way, compliant with challenging environmental standards. Designed to meet the stringent requirements of the EU Waste Incineration Directive, the combustion chambers, ...


    By Todaysure Limited

  • Are incineration and landfills the answer to save us from the recycling crisis?

    For plastic recycling, this year hasn’t exactly been one of the best – what is to blame? Oil. Shockingly, it actually costs more to recycle old plastic than it does to make new in many ways. Petroleum prices have fallen so low, as low as 70% below the level in June 2014. This may be great for some – however with it has fallen the cost of Virgin Plastic which is made from ...


    By GPT Waste Management Ltd

  • Incinerator location conflict: How opponents try not to be the losers of the public decision making?

    The lack of monetary compensation and the difficulty for residents to exit close to an incinerator lead them to protest the construction of waste facilities. Opponents try to change undesirable locations to maintain their welfare. With a cost-benefit analysis, our incinerator location model attempts to measure both transportation and externality costs in comparable units. Two extreme behaviours ...


    By Inderscience Publishers

  • Vanuatu government – Containerised general waste incinerator - Case Study

    TodaySure™ has recently constructed the installation of a containerised incinerator for the island of Vanuatu in the South Pacific Ocean. Permanently mounted into a modified 20′ ISO shipping container, which incorporated internal lighting, electrical sockets etc. The incinerator was fully tested and fired in our works and with the exception of the chimney, which is stowed in the ...


    By Todaysure Limited

  • Simulation of the plume emitted by a municipal waste incinerator in Madeira Island

    TAPM (The Air Pollution Model) was applied to Madeira Island to simulate the behaviour of the plume of a municipal waste incinerator that was constructed in the southern slope of the island at an altitude of 1380 m. TAPM simulates very well the atmospheric flow that occurs around the island and inside the inner valleys under strong synoptic forcing. Validation tools reveal the good agreement ...


    By Inderscience Publishers

  • A STIEFEL project Waste Incineration Plant (KVA) Trimmis case study

    The waste incineration plant (KVA) Trimmis is situated in the eastern part of Switzerland and is connected to the railway network. As it is the only incineration plant in this province, it serves a large area with approximately 131’000 inhabitants. The local authorities waste disposal association named GEVAG is a public body serving 43 convention communities and 97 associated municipalities ...


    By Jakob Stiefel GmbH

  • Emission Performance Results for a Liquid Waste Incinerator upgraded to meet the HWC MACT Standards

    Abstract Eastman Chemical Company operates three hazardous waste incinerators at its facility in Kingsport, Tennessee, one liquid waste incinerator and two rotary kilns. The air pollution control systems for these incinerators are being upgraded to meet the MACT standard for existing hazardous waste incinerators. The upgraded air pollution control systems include a vertical, rapid-quench ...


  • Emissions Performance Results for a Liquid Waste Incinerator Upgraded to Meet the HWC MACT Standards

    ABSTRACT Eastman Chemical Company operates three hazardous waste incinerators at its facility in Kingsport, Tennessee, oneliquid waste incinerator and two rotary kilns. The air pollution control systems for these incinerators are beingupgraded to meet the MACT standard for existing hazardous waste incinerators. The upgraded air pollution controlsystems include a vertical, ...


  • Heavy metals in wet scrubber residue from a medium–sized (32 MW) municipal district heating plant incinerating wood and peat in a fluidised bed boiler

    Due to the low total concentrations of heavy metals and extractable compounds, it is recommended that the wet scrubber residue be used as a construction agent instead of being disposed of in landfills. According to five–stage sequential extraction, the highest concentrations of most of the heavy metals occurred in the residual fraction (i.e., HF + HNO3 + HCl), which means that ...


    By Inderscience Publishers

  • Landfilling of Pre-treated Waste - Consequences for the Construction, Operation and After-care of Landfills

    INTRODUCTION From the realisation of the German Waste Storage Ordinance (Ordinance on Environmentally Compatible Storage of Waste from Human Settlements AbfAblV, ANONYM, 2001) follows that in Germany from June 2005 on only pre-treated wastes are allowed to be furnished to landfills. In some parts pre-treatment will fundamentally change the physical, biological and chemical properties of the ...


    By ORBIT e.V.

  • Study Charts a Future for Waste-Derived Fuels

    Pointers to possible future EU policy initiatives to give co-incineration facilities burning waste-derived fuels a strategic role in waste management have emerged in a study for the European Commission.1 The report suggests a policy focus on promoting source separation of municipal wastes, active discouragement of mass burn incinerators, and a levelling of the regulatory playing-field for ...

  • AVA Technology for Hazardous Waste Treatment - Case Study

    AVA has developed systems for pre-treating hazardous waste prior to incineration, which leads to higher throughput performance in combination with lower construction and maintenance costs and additional low pollution emissions, in comparison to conventional techniques. The system is based on the principal that constant gross calorific values and regular piece sizes together with consistency of ...


    By AVA - Huep GmbH u. Co. KG

  • Zero landfill, zero waste: the greening of industry in Singapore

    This paper reviews how a land-scarce city-state is trying to achieve its goals of zero landfill and zero waste through the greening of industry. The main challenges Singapore confronts in its solid waste management are an increasing volume of industrial waste generated, a shortage of land for landfills, and escalating costs of incineration plants. To green its industries, there has been a ...


    By Inderscience Publishers

  • Study on cement mortar and concrete made with sewage sludge ash

    This study investigated the feasibility of reusing wastewater sludge ash in construction materials to replace partial materials. Wastewater sludge sampled from thermal power plant was burned into sludge ash at 800°C in the laboratory. The sludge incineration ash has low heavy metal including Pb, Cd, Cr and Cu, so it belongs to general enterprise waste. The chemical composition of sludge ...


    By IWA Publishing

  • A STIEFEL project UTO Uvrier case study

    The waste incineration plant UTO Uvrier is situated in the south western part of Switzerland. The Association which controls the plant was established in 1969 and treats waste from 44 municipalities with a combined population of 170,000 inhabitants. The principal task of UTO Uvrier is the thermal heat recovery from urban and industrial waste. Apart from this, UTO also treats other types of waste ...


    By Jakob Stiefel GmbH

  • Techniques for processing industrial waste using arcplasma generated by the twelve-phase alternating current

    We have already presented an arc-discharging plasma generator, generally called a thermal plasma generator which is constructed by the six-phase alternating current power supply(Matsuura et al, 1994a, 1997). A more effective thermal plasma generator can construct by expanding this concept. As an example, this small power supply system has been presented in reference (Matsuura et al., 1994b). In ...


    By ORBIT e.V.

  • Shell Green Mersey valley processing centre extension

    An extension to an existing sludge incineration and treatment plant The Client United Utilities (UU) are the 2nd largest water company in England /Wales. They are responsible for an area in the north west of the UK, which includes major cities such as Manchester and Liverpool. The Solution Background The Mersey Valley ...


  • Refuse Derived Fuel, Current Practice and Perspectives

    Untitled Document Summary I OBJECTIVES The objectives of the project were to undertake a survey on the current ...

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you