landfill equipment Articles

  • Reduced Emissions for Landfill Gas Installations

    The use of landfill gas as a source of renewable energy is increasing. For environmental and safety reasons, the owners of the waste storage sites have to strictly monitor and control the construction, operations, and emissions generated. Sulzer offers solutions to control these emissions within the limits given by the government. Landfill gas is similar to natural gas, but it is created by ...


    By Sulzer

  • Case study - Procurement and installation of a Biogas desulphurization unit at the Chania WWTP

    A proposal based on Bioconservacion’s technology was selected as the winning bid in the public tender released in 2015, covering the design, procurement and construction of a biogas desulfurizing unit to be installed in the waste water treatment plant in Chania, Greece. With a population over 100,000, Chania is the second largest municipality in the Greek island of Crete. Its waste water ...


    By Bioconservacion SA

  • 10 things you need to know about the circular economy

    10 things you need to know about the circular economy A working circular economy could be a practical solution to the planet’s emerging resource problems. Here’s 10 facts you should know. 1. Why do we need one? The circular economy is touted as a practical solution to the planet’s emerging resource crunch. Reserves of key resources such ...


    By GPT Waste Management Ltd

  • Sludge Landfill - Odor Control

    Products & Equipment Used: Pneumatic Foam Unit 1600/40 AC-920 Long Duration Foam Application Summary: The Lynn (MA) Water and Sewer Commission's incinerator, dedicated for burning secondary sewage sludge, was shut down because of stack emissions that exceeded regulatory standards. The sludge that was usually burned had to be placed ...


    By Rusmar Inc.

  • Landfill Closure - Odor Control

    Products & Equipment Used: Pneumatic Foam Unit 1600/40 AC-645 Long Duration Foam AC-904 Long Duration Foam Application summary: The Michigan Department of Natural Resources required an emissions control measure during the closure of an Ann Arbor Solid Waste Landfill cell. The odors that were emanating from the landfill during ...


    By Rusmar Inc.

  • Cutting landfill costs - not capabilities

    The garbage business is generally a good indicator of the economy’s strength. And while the bad news is that waste tonnage is down at most landfills, the good news is that there is a bottom. Most of the drop is due to a slumping construction industry, compounded by less consumer buying. But the garbage business—like taxes and death—is relatively constant. Some landfills are ...


    By FINN Corporation

  • Closure Options for Impoundments and Landfills

    In Kentucky, a county board votes to shut down a landfill that had long been the source of odor complaints from nearby residents. In Hawaii, residents push a city council to expedite a delayed landfill closure. Outside Beirut, Lebanon, protesters try to block trucks entering a landfill they say should have been closed a week earlier. These events, while certainly newsworthy, obscure the fact that ...


    By Agru America, Inc.

  • Membrane Bioreactor for Sanitary Landfill

    The Problem The county of Warren NJ owns and operates a sanitary landfill in Oxford Twp, NJ. The facility generates an average of 50,000 gallons per day of leachate, with peaks to 100,000 gallons per day. The facility was discharging to a local POTW from their lagoon, but they were facing requirements for nitrogen removal from the POTW and needed a new system to provide ...


    By Dynatec Systems Inc.

  • Recycling Equipment

    Recycling helps our environment by slowing down the rate at which we have to burn garbage or put it in landfills. Disposing of your garbage is becoming much more expensive, as Americans are producing more solid waste, landfills are filling up, and recycling programs are trying their best to keep up with the increase in waste generated per capita each year. Between the cost of renting dumpsters, ...


    By Bee Cool LLC

  • NovaGerar landfill gas to energy project

    Overview The objective of the NovaGerar Landfill Gas to Energy Project in Nova Iguaçu - Rio de Janeiro, Brazil is to explore the landfill gas (LFG) collection and utilization activities of the landfills managed by S.A. Paulista. This involves investing in a gas collection system, leachate drainage system and a modular electricity generation plant at each landfill site (with expected ...


    By LANDTEC

  • High temperature combustion of landfill gas

    Type     Compact plant HOFGAS® - Efficiency 250 Commissioning     December 2001 Site     Storkohmo landfill, Kokkola (FIN) Situation Storkohmo landfill is located 400km north of Helsinki on Finland's west coast near the city of Kokkola. Based on local legislation requirements ( reduction of green house gas emissions ) the ...


    By Hofstetter BV

  • Landfill gas to fleet fuel in Ohio

    In mid-September, the Solid Waste Authority of Columbus, Ohio (SWACO) cut the ribbon on Phase I of its Green Energy Center that will convert landfill gas to compressed natural gas (CNG) for use in CNG-powered cars and medium duty trucks. The facility will produce enough CNG annually to replace almost 250,000 gallons of gasoline, plus additional natural gas sufficient to generate electricity for ...


    By BioCycle Magazine

  • Controlling H2S Emissions from Landfill Gas

    A major US waste handling company operates a large landfill in Florida, and in 1992, when Hurricane Andrew struck southern Florida, the landfill saw a huge increase in the amount of C&D waste. Shortly after this, the levels of H2S started dramatically rising. This company evaluated several technologies for the removal of H2S, which was estimated to be as high as 5000 ppmv, with up to 2-3 tons/ ...


    By Merichem Company

  • Landfill gas analysis telematics in Slovenia case study

    Application Landfill - waste to energy Equipment AEMS Location Novo Mesto, Slovenia Customer AFS client, Minerva Žalec d.d Requirement The customer specified a 6-channel landfill gas analyser with secure online internet access for data transmission. ...


    By Geotech

  • Development of Low noise landfill gas flare

    Summary: Increasing requirements of the environmental standards and planning permission conditions create more challenges to the equipment providers. Environment Agency guidance demands low emission levels and local planners put low noise levels in their conditions for landfill sites. Achieving both at the same time with conventional equipment was found problematic. Biogas Technology has ...


    By Biogas Technology Limited

  • Rebuilding compactor saves money and resources for Florida landfill

    Working with the local Caterpillar® dealer, the Volusia County, FL Recycling and Solid Waste Division has conserved money and resources by rebuilding its 836G compactor for a third life at the Tomoka Landfill. Ring Power, the Cat® dealer in northern and central Florida, performed the two rebuilds and maintains a close watch on the compactor as part of a Total Maintenance and Repair ...


    By Waste Advantage Magazine

  • Zero landfill option for baling wire scrap

    Let’s face it, times are tough; and tough times call for a new way of thinking. The buzz of zero landfill is growing, but with the current state of the economy, it’s difficult to afford capital equipment that can help achieve a company’s recycling goals. As a result, Sweed looked for an option that would allow companies to recycle their scrap wire and get the best value for ...


    By Sweed Machinery, Inc.

  • Bernaraby Landfill Power Plant - Case Study

    Clarke Energy has been contracted to supply and deliver one of GE's Jenbacher 1MWe containerised gas engine to LGI (Landfill Gas Industries Pty. Ltd.) for their new landfill gas power station project at Bernaraby, Queensland, Australia which will be operational in 2016. Generation Capacity The high efficiency ...


    By Clarke Energy

  • Leachate treatment solution for council – Landfill Site, Camarthenshire

    Plant Equipment: Ocean Professional Nitrification Plant Design Data: Effluent target (NH4-N): <4 Daily flow (m3/day): 120 Ammonia load (kg/day): 6 BOD load (kg/day): n/a Situation and Problem This site comprises of six landfill cells and phase ...


    By EnSo International Ltd

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you