landfill permit Articles

  • Landfill site improvement condition for PPC permit

    The installation is a landfill site licensed for the disposal of inert waste. It lies in a potentially sensitive location on the flood plain of the River Great Ouse, near Milton Keynes and it is therefore important to the client to ensure good environmental monitoring is undertaken. The site is divided into two sections, (the north western area and the south eastern area) by the River Great Ouse, ...


    By ESI Consulting

  • Recent Federal Developments

    TSCA/FIFRA EPA Extends Comment Period For Draft Guidance For Pesticide Registrants On Notifications, Non-notifications, And Minor Formulation Amendments: On October 5, 2017, the U.S. Environmental Protection Agency (EPA) issued a notice of extension of the comment period for the draft guidance  ...


    By Bergeson & Campbell, P.C.

  • Fuel preparation technology – the latest safety considerations

    The specifications for new fuel preparation technologies are becoming increasingly sophisticated, as industry innovation continues apace. But when it comes to investing in waste shredders that help manufacture cement fuels, which criteria should top the procurement wish-list in 2018? With more than 25 years’ experience in this sector, Peter Streinik, head of UNTHA’s waste shredding ...


    By UNTHA Shredding Technology

  • Cement kiln dust landfill

    Client: Confidential Location: Southam, Rugby Services: Hydrogeological risk assessment , data interpretation. Issues: Poor background groundwater quality, dewatering, potential risk to controlled waters Summary: ESI provided the data analysis, interpretation and hydrogeological risk assessment ...


    By ESI Consulting

  • Landfill Gas Monitoring Procedures

     Purpose of Document The purpose of this document is to provide standardized procedures for California Integrated Waste Management Board (Board) inspectors to use when performing landfill gas (LFG) monitoring during routine disposal site inspections. The standardization of procedures is intended to produce an acceptable level of confidence in the monitoring. This document presumes that each ...


  • Solar energy landfill caps

    Things weren’t going well at the Erewhon Landfill. It was time to close the facility, and there was no soil left onsite for construction of the cap. Erewhon was a County facility, and the money available for 30 years of post-closure gas monitoring, groundwater sampling and reporting, erosion repairs and maintenance of a grass cover was sorely needed elsewhere. The landfill manager recalled ...


    By Waste Advantage Magazine

  • Landfill licence surrender assessment

    Client: Waste Management Industry Location: UK Services: Landfill completion reporting, site investigation, sampling and data collation,   risk assessment, regulatory liaison. Issues: Potential risk to human health and controlled waters,  Summary: ESI undertook the site ...


    By ESI Consulting

  • Landfill reporting and data management

    Client: Syngenta Limited Location: Bradley Park, UK Services: Landfill monitoring support service, environmental data management and reporting services Issues: Quality Assurance (QA) and Quality Control (QC). Control and trigger level compliance. Summary: ESI receives site monitoring data from the ...


    By ESI Consulting

  • Landfill environmental data management

    Client: Syngenta Limited Location: Bradley Park, UK Services: Landfill monitoring support service, environmental data management and reporting services Issues: Quality Assurance (QA) and Quality Control (QC). Control and trigger level compliance. Summary: ESI receives site monitoring data from the ...


    By ESI Consulting

  • Landfills Expand Energy Output

    HIGH fossil fuel prices and growing concern about global climate change are creating favorable conditions for landfill gas energy (LFGE) projects. Notably, endorsement of LFGE by Federal agencies and many states as a form of “green” power has enabled LFGE developers to earn premiums for electricity marketed through green power programs, and to benefit from expanded federal tax credits for ...


    By BioCycle Magazine

  • Challenges at MSW Landfill Sites

    Covering the day’s trash at the landfill Today’s municipal solid waste (MSW) landfills are much more than places to dump household trash. They’re engineered facilities that are designed to hold and isolate the trash from the environment and are governed by both federal and state regulations. Landfill designers and operators face two main challenges ...


    By FINN Corporation

  • Landfill annual reporting and data management

    Client: Waste Management Industry Location: UK Services: Landfill monitoring support , data management and quarterly and annual reporting services Issues: Regulatory annual reporting requirements and control and trigger level compliance. Summary: ESI receives monitoring data from the client at ...


    By ESI Consulting

  • Risk assessment for a landfill PPC application

    Client: Waste Management Industry Location: Co-disposal landfill site for non-hazardous and hazardous waste,  Worcestershire. Services: Hydrogeological risk assessment, landfill monitoring support, Environmental permit application support , Issues: Potential risk to groundwater,  Environmental Permit ...


    By ESI Consulting

  • What are the treatment options for landfill leachate?

    New contributor to Water/Waste Processing aims to answer readers’ most pressing questions It’s said the United States has 1,654 landfills, handling more than 250-million tons of trash each year. One Washington landfill covers a 2,545-acre area, has a 120-million-ton capacity and a 40-year expected trash-receiving life. The facility, the Republic ...


  • Assessment of hydraulic containment of a landfill site

    Client: Waste Management Industry Location: Hydraulically contained landfill site, UK Services: Data review, hydrogeological risk assessment, hydraulic containment. Issues: Potential risk to groundwater and surface water, environment and human health. Leachate level control and trigger level compliance. ...


    By ESI Consulting

  • Completion reporting for a closed landfill site

    Client: Waste Management Industry Location: UK Services: Landfill completion reporting for a closed site, including desk study and risk assessment Issues: Landfill completion criteria, potential risk to groundwater, environment or human health. Summary: ESI undertook a desk study and risk ...


    By ESI Consulting

  • BroadBand PRO: Landfill case study

    The Rhode Island Resource Recovery Corporation (RIRRC) is not only the largest landfill in the state of Rhode Island; it’s also the only one. In earlier days, each city and town in the state had its own landfill operation. These multiple facilities tended to be inefficient, inconsistent and duplicative, besides resulting in a plethora of unbeautiful garbage dumps around the state. So the ...


    By Bird-X Inc.

  • Landfill gas to fleet fuel in Ohio

    In mid-September, the Solid Waste Authority of Columbus, Ohio (SWACO) cut the ribbon on Phase I of its Green Energy Center that will convert landfill gas to compressed natural gas (CNG) for use in CNG-powered cars and medium duty trucks. The facility will produce enough CNG annually to replace almost 250,000 gallons of gasoline, plus additional natural gas sufficient to generate electricity for ...


    By BioCycle Magazine

  • Hydrogeological risk assessment for a landfill PPC application

    Client: Waste Management Industry Location: Co-disposal landfill site for non-hazardous and hazardous waste,  Worcestershire. Services: Hydrogeological risk assessment, landfill monitoring support, Environmental permit application support , Issues: Potential risk to groundwater,  Environmental Permit ...


    By ESI Consulting

  • Oxidation System for Sanitary Landfills & Recycling Centers

    The Broward County, Florida, Central Sanitary Landfill & Recycling Center operates the country’s largest landfill gas turbine-to-energy plant. Approximately 9 MMSCFD of landfill gas is collected from 300 wells and converted into electricity. During the cleanup after hurricane Andrew, large amounts of construction and demolition debris were brought into the landfill for disposal. Over a very short ...


    By Merichem Company

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you