landfill site geomembrane cover Articles

  • Solar energy landfill caps

    Things weren’t going well at the Erewhon Landfill. It was time to close the facility, and there was no soil left onsite for construction of the cap. Erewhon was a County facility, and the money available for 30 years of post-closure gas monitoring, groundwater sampling and reporting, erosion repairs and maintenance of a grass cover was sorely needed elsewhere. The landfill manager recalled ...


    By Waste Advantage Magazine

  • Closure Options for Impoundments and Landfills

    In Kentucky, a county board votes to shut down a landfill that had long been the source of odor complaints from nearby residents. In Hawaii, residents push a city council to expedite a delayed landfill closure. Outside Beirut, Lebanon, protesters try to block trucks entering a landfill they say should have been closed a week earlier. These events, while certainly newsworthy, obscure the fact that ...


    By Agru America, Inc.

  • Landfill Leachate Sources and Treatment Options

    What is leachate? In a lab, it is any liquid that extracts solids as it passes through matter. In a landfill, it is the water that enters the facility in a number of ways, passes through waste material on contact, contains a wide range of constituents, and must be addressed with a proper operations plan. Leachate treatment options and mitigation are one of the greatest costs for landfill ...


    By Agru America, Inc.

  • Bali’s first modern landfill design case study

    Bangli Regional Landfill in Indonesia’s Bali province is located about 60km outside of Denpasar, the provincial capital and home to more than 500,000 residents. The region hosts Ngurah Rai International Airport—the main entry point into Bali—and numerous tourist destinations along Bali’s popular white sands beaches. When the Indonesian central government approved ...


    By NAUE GmbH & Co.KG

  • Designing A Better Alternative for Post-Closure Care

    After a landfill has reached the end of its service phase, federal law requires owners to install a final soil cover and maintain it over the next 30 years. This is the traditional strategy that most landfill owners employ and represents a significant cost of business. When all the layers are tallied together, the capping and post-closure period can cost up to $400,000 for a small, 100-acre ...


    By Agru America, Inc.

  • Environmental Information Systems for Tailings Management

    Introduction An EU Directive is forcing waste disposal sites, such as refuse tips and landfills, to upgrade their anti-leaching precautions. This is especially the case in Sweden. Here, in its home market, Trelleborg is able to provide these sites with an environmentally friendly, seam-weldable rubber membrane to meet the stringent new requirements. An EU Directive came is now in force ...