landfilling project Articles

  • NovaGerar landfill gas to energy project

    Overview The objective of the NovaGerar Landfill Gas to Energy Project in Nova Iguaçu - Rio de Janeiro, Brazil is to explore the landfill gas (LFG) collection and utilization activities of the landfills managed by S.A. Paulista. This involves investing in a gas collection system, leachate drainage system and a modular electricity generation plant at each landfill site (with expected ...


    By QED Environmental Systems

  • Thermal Oxidiser - Scottish Leather Group - Case Study

    Project Details Customer Name: Scottish Leather Group The Brief:  Scottish Leather were sending 30, 000 tonnes of waste to landfill each year. Turn that waste into heat and steam for processing leather and heating water Location of Installation: Bridge of Weir, ...


    By Process Combustion Ltd

  • Seropédica landfill

    The Seropédica landfill is located on the outskirts of Rio de Janeiro. Since the closure of the 130-hectare big Gramacho landfill, Seropédica now receives over 6,000 tons of waste per day. Seropédica is the most modern solid waste treatment center in Brazil and Hofstetter has been awarded the biogas treatment process, as well as the set up of a flaring system at the landfill. ...


    By Hofstetter BV

  • Turning a Liability into an Asset: A Landfill Gas-to-Energy Project Development Handbook

    Each person in the United States generates about 4.5 pounds of solid waste per day almost one ton per year. Most of this waste is deposited in municipal solid waste landfills. As this landfilled waste decomposes (a process that may take 30 years or more), it produces landfill gas. Landfill gas contributes to the formation of smog and poses an explosion hazard if uncontrolled. Furthermore, because ...


  • Landfill Gas to Renewable Natural Gas Project Goes Ahead in Michigan

    Greenlane Biogas, a subsidiary of the Flotech Group of companies (founded in 1986), is pleased to confirm that it recently has received an order to build two 'Totara+' landfill gas upgrading systems to process 3200 scfm (approximately 5150 Nm3/hr) of gas to be injected into a local natural gas pipeline near Detroit Michigan. Greenlane Biogas, a developer and supplier of proprietary water ...

  • Landfills case study: Space heating with LFG: Small project-big savings

    On a typical January morning in Minnesota, a landfill operator is working on the compactor’s transmission. Despite the four inches of snow on the ground, he opens the garage doors in the maintenance building to let out some of the excess heat. Unlike previous winters, this year the operator can afford to crank up the heat in the building while working on equipment because the heat is being ...


    By Waste Advantage Magazine

  • MARCA Landfill gas to Energy project - Brazil case study

    Project Description The project is being developed by EcoMethane who has invested, designed, constructed, installed and currently operating the LFG collection and flaring systems. In addition, EcoMethane developed the project under the Clean Development Mechanism of the Kyoto Protocol and placed the carbon credits in the marketplace. When a suitable power purchase agreement is in place, ...


    By Biogas Technology Limited

  • Landfill Gas to Power

    Location: Mount Gilead, NC Online Date: 2012 Element Markets is partnering with Republic Services, Inc., one of the largest waste companies in the U.S., to develop a power project at a regional landfill in North Carolina, which will come online in 2012. Drawing from our extensive project development experience, we conducted exhaustive technical analysis to ...


    By Element Markets LLC

  • Landfill Gas to Pipeline

    Location: Angleton, TX Online Date: 2012 Element Markets is partnering with Waste Connections, one of the largest waste companies in the U.S., to develop a large biomethane project at the company’s Seabreeze Landfill in Angleton, Texas. The project, which is slated to come online in 2012, will produce more than 28 million MMBTUs of gas during its operational ...


    By Element Markets LLC

  • Landfill slope stability

    Birdsall Engineering, Inc. has recently undertaken a landfill slope stability project using SVDynamic. This project dealt with a difficult and unconventional problem that SVDynamic was able to solve quickly and easily. The below quote further details this modeling project: "In order to optimize airvolume at an existing landfill we had to evaluate the slope stability of the piggy-backed waste body ...


    By SoilVision Systems Ltd.

  • Landfills Expand Energy Output

    HIGH fossil fuel prices and growing concern about global climate change are creating favorable conditions for landfill gas energy (LFGE) projects. Notably, endorsement of LFGE by Federal agencies and many states as a form of “green” power has enabled LFGE developers to earn premiums for electricity marketed through green power programs, and to benefit from expanded federal tax credits for ...


    By BioCycle Magazine

  • Landfill licence surrender assessment

    Client: Waste Management Industry Location: UK Services: Landfill completion reporting, site investigation, sampling and data collation,   risk assessment, regulatory liaison. Issues: Potential risk to human health and controlled waters,  Summary: ESI undertook the site ...

  • Landfill Liners Vary by Application

    It was in 1991 that the Environmental Protection Agency promulgated its Criteria for Municipal Waste Landfills that set location restrictions, design and operating standards, groundwater monitoring requirements, corrective actions, closure requirements, and more for landfills. It was these rules that mandated that landfills be lined on the sides and bottom before waste is deposited and capped on ...


    By Agru America, Inc.

  • Landfill environmental data management

    Client: Syngenta Limited Location: Bradley Park, UK Services: Landfill monitoring support service, environmental data management and reporting services Issues: Quality Assurance (QA) and Quality Control (QC). Control and trigger level compliance. Summary: ESI receives site monitoring data from the ...

  • Landfill reporting and data management

    Client: Syngenta Limited Location: Bradley Park, UK Services: Landfill monitoring support service, environmental data management and reporting services Issues: Quality Assurance (QA) and Quality Control (QC). Control and trigger level compliance. Summary: ESI receives site monitoring data from the ...

  • Landfill Cap Enhancements

    Introduction: The precipitation to the landfill cover is balanced by the combination of following effects: run-off, cumulating in soil, evapotranspiration, and percolation. For a given amount of precipitation, in order to reduce or eliminate percolation, the effects of run-off and/or evapotranspiration need to be enhanced. Water Harvesting Water harvesting uses ...

  • Hydrogeological risk assessment for a proposed landfill

    Client: Waste Management Industry Location: Landfill site, UK Services: Desk study, site investigation and data review, 3D MODFLOW groundwater modelling and hydrogeological risk assessment. Issues: Potential risk to groundwater and surface water, environment and human health.  Landfill containment design ...

  • TCE at Department of Defense Landfill Site

    PROJECT BACKGROUND Subsurface investigations at this 40-acre Northern California Department of Defense (DOD) landfill site revealed elevated levels of TCE in site soils and groundwater. This discovery was made through routine site monitoring, as regulated by the state of California solid waste landfill regulations. Regulators required site cleanup to reduce chlorinated hydrocarbon concentrations ...


    By REGENESIS

  • Habitats assessment for four closed landfills

    Client: Environment Agency Location: Southern England (Solent) Services: Controlled water and ecological risk assessment, data review and interpretation Issues: Potential impact of Waste Management Licensed sites on ecologically sensitive sites. Potential risk to groundwater, surface water and dependant ecosystems. ...

  • KTK landfill capping - geosynthetic lining

    Landfill capping works are currently ongoing at KTK Landfill, Kilcullen, Co. Kildare to complete the final capping works at the facility. The capping area of the project is approximately 93,000m2 with Lining Technology providing lining crews and an excavator for the supply and installation of both smooth and double textured LLDPE liner. Works also involved sealing around existing gas wells and ...

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you