liner system Articles

  • Train derailment prompts contaminated land investigation

    On March 30th 2015 a long freight train, transporting a variety of goods including lumber and chemicals, wound its way through the state of Mississippi. At around 5pm, part of the train failed to negotiate a curved portion of the track in a rural area near Minter City, resulting in the derailment of nine railcars, one of which leaked chemicals onto agricultural farmland and woodlands. Emergency ...


    By Gasmet Technologies Oy

  • Landfill Liners Vary by Application

    It was in 1991 that the Environmental Protection Agency promulgated its Criteria for Municipal Waste Landfills that set location restrictions, design and operating standards, groundwater monitoring requirements, corrective actions, closure requirements, and more for landfills. It was these rules that mandated that landfills be lined on the sides and bottom before waste is deposited and capped on ...


    By Agru America, Inc.

  • Designing With Geosynthetic Clay Liners

    In construction, preventing the penetration of liquids and gases is essential to maintaining the integrity of a structure. Often, containment is just as important, especially when dealing with chemical contaminants or other waste. When looking to stop the spread of contaminated liquids and gases, there are few tools as effective as geosynthetic clay liners (GCL). Read on to learn how to design ...


    By Agru America, Inc.

  • Saline Pond Multi-Layer Liner System - Case Study

    Gas operation benefits from the conversion of a single-liner system to a double-liner with leak detection monitoring Extensive gas operations near the North Saskatchewan River in Fort Saskatchewan, Alberta, are understandably closely regulated. To help the client remain well above compliance requirements and expand their leak detection capabilities, Nilex implemented the ...


    By Nilex

  • Locating Geomembrane Liner Leaks under Waste in a Landfill

    Abstract An Electrical Leak Imaging and Monitoring (ELIM SM) survey was used to locate leaks under 2.5 meters of stabilized waste in an active geomembrane-Iined landfill. The landfill is lined with two 2-mm thick HDPE geomembranes that are separated by a geonet drainage layer. The primary liner is covered with 600 mm of drainage sand and 2.5 meters of stabilized waste for a total cover ...

  • Locating Leaks in Geomembrane Liners of Landfills Covered With a Protective Soil

    ABSTRACT The electrical leak location method was used to locate leaks in the geomembrane liners of single-lined and double-lined landfills covered with a protective soil cover. The landfills ranged in size from 0.40 hectare (one-acre) to 3.2 hectares (eight-acre). Water in the leak detection system under the primary liner indicated the primary liners were leaking. The principal of ...

  • Comparison of dye testing and electrical leak location testing of a solid waste liner system

    Abstract: Dye tracing and electrical leak location testing were independently conducted to detect and locate leaks in the primary geomembrane liner of two cells in a municipal landfill. Despite extensive quality control and quality assurance programs, water in the leak detection zone after construction indicated that the primary liner had a leak. Fluorescein dye tests were conducted by placing a ...

  • Evaluation of geomembrane, amended soil and composite liner system as lining materials for chromium decontamination in landfill site

    A comprehensive laboratory and field–scale study was performed to explore the efficacies of geomembrane, amended soil liner material and composite liner packs for using as containment liner systems for attenuating chromium transport emanating from a chrome laden solid waste disposal site. Soil samples were collected from the site and were admixed with different amended materials, such as rice ...


    By Inderscience Publishers

  • Assessment of microsilica as a value–added material for municipal solid waste clay liner system

    This study was carried out to provide landfill clay liner soil along with admixture microsilica in different proportions. The physico–chemical characteristics were carried out to characterise the selected liners. The optimum conditions vis., time of adsorption, adsorbent dosage and pH were studied for the liners. The optimum pH values for COD removals are determined for clay soil, mix 1 : 20, mix ...


    By Inderscience Publishers

  • Bozeman wastewater treatment plant, Crisafulli FLUMP with pond liner protection system-case study

    Paul Layton, Assistant Superintendent, City of Bozeman, MT Public Works Dept. Commenting on the Crisafulli FLUMP with Crisafulli’s Pond Liner Protection System Purchased in 2003 for Bozeman’s Wastewater Treatment Plant "I really like the remote-control aspect of the unit. We can just have an operator sitting up here on the shore, out of the sludge, operating in a very clean ...


    By SRS Crisafulli, Inc.

  • Rainstore3 Installation Instructions Water Harvesting For Stormwater Drainage Containment & Reuse with Geomembrane Liner

    This document describes how to properly install the Rainstore3 water storage system with geomembrane for stormwater containment and reuse. Containment allows for on site subsurface water storage for many non-potable applications such as irrigation. Contractors: Only licensed contractors should install the Rainstore3 system. The contractor should have a good performance record with similar ...


    By Invisible Structures, Inc.

  • GCL serves as cost-effective, time saving alternative to compacted clay liner in mine drainage settlement pond

    PROJECT: CONSOL Bailey Mine Tailings Pond LOCATION: West Finley, Pennsylvania PRODUCTS: BENTOMAT® SDN BACKGROUND: Bailey Mine, located in Southwestern Pennsylvania and owned by parent company CONSOL Energy Inc., supplies bituminous coal used in the generation of electricity. At the site, coal laden sediment is pumped to ...


    By CETCO

  • Landfill Capping Systems: An Introduction to Options

    Geomembranes, predominately linear low-density polyethylene (LLDPE), have been used for landfill caps for decades. Waste Management World has noted how,” Generally they have performed extremely well but, not unexpectedly, there have been a few exceptions that have guided us in developing even better systems.” Currently, there are four commonly used options for landfill caps, each with ...


    By Agru America, Inc.

  • Synthetic turf system solves landfill erosion challenge

    After four years as landfill district manager for IESI Corp., Delaney Lewis was discouraged. Although one of the Louisiana landfills for which he was responsible exhibited ideal geology, the soil characteristics were not conducive to side slope maintenance. The soil of the LaSalle/Grant landfill was highly erodible, exhibited a high plasticity index and had a natural pH of 4.0. ...


    By Waste Advantage Magazine

  • Radius Systems’ bespoke engineered PE Systems bring cost savings and environmental benefits to water customers

    Radius Systems are currently supplying innovative pipeline solutions for two large diameter water projects: a new hydro electricity scheme in Gerlan, North Wales and the rehabilitation of a large diameter pipeline in the Severn Trent Water area. Working together with the Derwent Hydro project team to develop an optimised system for the new hydro electricity pipeline in Gerlan, Radius Systems are ...


    By Water Active Ltd

  • Sustainable, Low-maintenance Disinfection for Onsite Systems

    Most of the regulations applicable for onsite wastewater treatment system are based on the use of native soil for effluent dispersal. However, there are more and more situations where dispersal of effluent in native soil is impossible: repairs of existing systems on undersized lots for implementation of required dispersal fields: sites located in soils having low permeability: or where the ...


    By Premier Tech Aqua

  • Stevens Systems Enhances Ground Water Remediation Effectiveness

    The Stevens Hydra Probe is now being used to monitor the progress of a new groundwater pollution clean up method called phytoremediation. Phytoremediation is the method by which trees are used to pull contamination out of groundwater. Remediation of contaminated aquifers can take many years to complete. The need for clean, healthy rivers, lakes and streams has stimulated research to develop ...

  • Easy roller deployment system puts installation back on schedule

    PROJECT: Coal Ash Disposal - Midwest Utility LOCATION: Central Illinois PRODUCTS: BENTOMAT® SDN, EASY ROLLERTM DEPLOYMENT SYSTEM BACKGROUND: The increased use of coal to generate electricity has brought with it an increased amount of coal combustion by-products (CCBs). Metal ions released from these CCBs can be harmful to ...


    By CETCO

  • Rotomite-6000-CD Dredge System - US Copper Mine-case study

    SRS Crisafulli's Integrated Product Solutions - To remove water, soft and abrasive material, sludges, and slurries from Industrial, Municipal, Agricultural, and Government Lagoons, Ponds, Lakes, Canals, and flooded and flood threatened areas. And to irrigate farms and ranches. Dredge Rentals. Many customers rent Crisafulli’s Rotomite and FLUMP dredges on ...


    By SRS Crisafulli, Inc.

  • High-Resolution Site Characterization with Multilevel Systems

    Within the last few years, the U.S. EPA added a new focus area on high-resolution site characterization (HRSC) to their Contaminated Site Clean-Up Information (CLU-IN) website. The U.S. EPA’s definition of HRSC is: “High-resolution site characterization (HRSC) strategies and techniques use scale-appropriate ...


    By Solinst Canada Ltd.

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you