manhole vacuum testing Articles

  • Installing gravity sewer in tough Georgia rock

    It took a contractor who was receptive to an innovative new installation approach, a good deal of patience and a whole lot of determination — after two previous attempts by other contractors using drills and air hammers were unsuccessful — to finally conquer a pesky 800-foot (243.8 m) stretch of tough Georgia blue granite. Hence, project owner Coweta County Water and Sewer Authority ...

    By Vermeer

  • Emergency response and clean-up of a diesel leak: manufacturing facility

    Project: Emergency response and clean-up of a diesel leak Client: Confidential manufacturing company Services: Emergency response planning, environmental assessment, regulator liaison, remediation design Summary: Through rapid site characterisation and expert decision making ESI minimised the environmental damage ...

  • Salinity modeling for the Altona sewerage strategy

    City West Water’s Altona sewerage system is possibly one of the most studied sewerage networks in Melbourne, Australia. Currently the tertiary sewage effluent from the Altona treatment plant is discharged to Port Philip Bay with an average salinity of approximately 4500 mg/litre.  This study involved the development of a detailed model that accurately reflected the sources and dilution of ...

    By Innovyze