oil-water separator rental Articles

  • How Dredging Equipment Rentals Provide Multiple Advantages

    By Dave Stoltenberg, Dredge Rental Specialist with SRS Crisafulli For many industrial projects, rental equipment is the way to go.  Especially for many dredging applications, which in most cases are only required periodically, with many years separating the jobs, rental equipment delivers a number of advantages.  Offering increased flexibility to respond ...


    By SRS Crisafulli, Inc.

  • Water Treatment Plant - Birse Construction/Powergen

    A large scale water treatment system rental to Birse Construction as part of the enabling works for site redevelopment.Each separator/settling tank was equipped with a duty and standby pump.The size of activated carbon vessel is unique within the UK with a flow capacity of 200 m3/hr. The vessel contains 20 tonnes of activated carbon and GRS can mobilise several of these at short notice, thus ...


  • Waste water plant struggles with contamination case study

    A plant in the southwest US commissioning a wastewater plant utilizing proprietary technology for the removal of benzene, toluene, and xylene, or BTX, was experiencing challenges with throughput and elevated operational costs due to the presence of particulate contaminants. The plant takes the wastewater and processes it, removing the BTX prior to being fed to the conventional wastewater plant. ...

  • Filter refurbishment program for Southern Water in Eastrey

    Peak flow to treatment: PE of site: 2090 (550 m3/day) Formula A site Units supplied: 2 off steel 500 pe units (Rental units) Purpose of rental units: To allow for the refurbishment of trickling filter beds, initially the SAF units were used for both carbonaceous treatment and ammonia removal. Once the trickling filter beds were ...


    By WPL Ltd

  • Filter refurbishment program for Southern Water in Eastrey case study

    Purpose of rental units: To allow for the refurbishment of trickling filter beds, initially the SAF units were used for both carbonaceous treatment and ammonia removal. Once the trickling filter beds were refurbished the SAF units were then used to polish the effluent (ammonia removal) from the trickling beds whilst they seeded up, this process typically taking around 4-8 weeks. ...


    By WPL Ltd

  • Pollutants, Aquaco Water Recycling Ltd can offer a solution

    With ever increasing demands from the Environment Agency to minimise pollutants in water effluent arising from industrial processes, Aquaco water recycling ltd can offer a solution which works well in many industries. This is the Red Box Electro Coagulation system whereby contaminants are flocculated by an electrical process into a size which can then be filtered, pressed and disposed of. The ...

  • Residents of a Florida trailer park think their contaminated water made them sick

    Allan Payan lifts a photograph from a shelf inside his singlewide trailer home. The smiling woman in the image has full cheeks and long, thick, brown hair. Caroll Payan, who sits across the couch from him, can't bear to look at the old photo of herself. She has dropped 20 pounds in the past six months, and it shows in her tall, wiry frame. Her green eyes now bulge under heavy lids on a gaunt ...


  • Damage control - handling major hurricane damage to production platform

    A major operating company in the Gulf of Mexico had some unique challenges when their existing systems were damaged during a major hurricane in the Gulf of Mexico. They selected CETCO Oilfield Services to provide them with temporary services, personnel for 24 hour coverage, and a complete equipment rental package to handle all the production for the platform while repairs were being conducted. ...


    By CETCO Energy Services

  • EEI`s Efforts in Helping to Re-build Hurricanes Katrina & Rita Affected Zones

    Untitled Document Dear Environmental Professionals, Hurricanes Katrina & Rita ...


    By Enviro-Equipment, Inc.

  • Addition of grinder completes the picture for Gerogia firm

    In the business world, there are those who wait for opportunity to knock and there are those, like Dennis Waters, who go out and create their own opportunities. The Allenhurst, GA business professional either heads up or is an investor in more than two dozen separate businesses throughout southeast Georgia and has built two of those companies - Dennis Waters Development Company and Dennis Waters ...


    By Morbark, LLC

  • Solar Energy – Proving Advantageous for Your Business

    Energy costs constitute a sizeable part of operational costs for any commercial establishment, whether it is a public or a private enterprise. If a firm invests in solar energy, it not only contributes towards decreasing carbon footprint, but also helps create a better world for forthcoming generations. Though, in the initial years, an investment in setting up a solar power plant would seem an ...


    By Vista Solar

  • Resourcing the future 2016, London. Is the Circular Economy strategy on the right track?

    The following presentation was given in the form of a speech by Zero Waste Europe Director, Joan Marc Simon at the ‘Resourcing the Future 2016’ conference organised by CIWM in London. Is the Circular Economy strategy on the right track? Yes, but it is still too slow, in need of some fine-tuning and to escape bad habits from the past. The ...


    By GPT Waste Management Ltd

  • Green Buildings: Economics and Policies

    Introduction Green building has received increased attention over the past decade from both environmental economists and policymakers. While there is no single definition of “green buildings” or its related policy, researchers and organizations tend to emphasize resource efficiency in building and reducing the impacts of buildings on human health and the environment. ...


    By Oxford Journals

  • New Recycling Era for NYC

    Untitled Document New 20-year contract between the city and large-scale recycler ...


    By BioCycle Magazine

  • Stocking Your Green Building Toolkit

    1. Introduction Designing, constructing and operating environmentally friendly buildings can be a lot more complex than it seems, especially when it comes to materials selection. We would all like simple measures or rules of thumb that would make the selection process easy, but they are hard to come by, if they exist at all. The reality is that we are constantly forced into a balancing act, ...

  • Environmental Justice: A Brief Historical Analysis

    Untitled Document ...


Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you