on-site power Articles

  • Biological desulphurization of Landfill biogas - Case study

    Summary Biorem's biogas desulphurization product is providing very high removal efficiencies at a landfill site in Quebec. Despite the highly variable concentrations and low winter temperatures, the system has achieved an average removal efficiency of 97%, and has maintained outlet nydrogen sulphide concentration below target consistently. As a result, the customer has realized a ...


    By Biorem Technologies Inc.

  • The ‘Rolls Royce’ is now in its ‘garage’

    Our client’s new cremation for pets venture is almost ready for business. Even though we have been in this business for many years, in fact we are globally recognised as the undisputed the market leader, we still enjoy a tingle of excitement every time we receive a new order.  Whether it is for a small pet cremation unit or the largest, fully automated and most advanced waste ...


    By Todaysure Matthews

  • Quality assurance and Quality control technical note

    Introduction For almost 50 years HYDROLAB products have provided dependable sensor technology in a multiple parameter instrument for montioring essential indicators required for assessing water quality in natural waters. Useable data are the lifeblood of any environmental water quality monitoring program and variation in measurement processes impairs the quality of the data that water ...


    By The OTT Hydromet Group

  • Harnessing nature`s power: Deploying and financing on-site renewable energy

    This report offers strategies and approaches that can be valuable to a wide range of firms looking at potential investments, contracts, and facility operational decisions regarding use of renewable energy. It provides guidance on how to consider the choice to finance or purchase renewable technologies for use on corporate facilities and advice on where to go for further ...

  • Coalition reveals potential sites for UK nuclear power stations

    New draft National Policy Statements on Energy reveals the government’s intentions to build eight nuclear power stations in England and Wales by 2025. The government gave green light to eight new nuclear power stations, in a move that will see the UK with the most ambitious fleet of new nuclear power stations in Europe. At the same time, the coalition confirmed that it is dropping ...


    By Vital Efficienci Ltd.

  • On-site regeneration of transformer oil

    Regeneration of transformer oil at the transformer’s location is an important preventive measure of transformer servicing.   Transformer life time is, in essence, the life time of its insulation system. The most widely used insulation is liquid insulation (transformer oils) and solid insulation (paper, i.e. cellulose insulation). The oil provides for at ...


    By GlobeCore GmbH

  • On-Site Sodium Hypochlorite Generation

    AbstractIn this manuscript the on-site generation of sodium hypochorite for water and wastewater disinfection will be examined. The objective of this paper is to familiarize the reader with the equipment and operational requirements necessary for on-site sodium hypochlorite generation systems. This manuscript will review the following topics relative to on-site generation systems: Understand the ...

  • On-Site Food Waste Pretreatment

    Guide to equipment and systems for businesses, institutions and venues that manage food waste on-site. Businesses, institutions and venues that generate large volumes of food waste have an increasing number of options to manage this organics stream, starting with tools and knowledge to prevent and reduce what is generated in the first place, followed by donation of excess and prepared ...


    By BioCycle Magazine

  • Geotomography in Site Investigation: Simulation Study

    Tomography is the reconstruction of images from measurements of line integrals. It is used in a variety of scientific and technical applications. Advances in electronics and computers make the technique accessible to geotechnical engineering. The combination of penetration testing and tomographic reconstruction would result in a powerful site investigation tool.A tomographic software was ...


    By ASTM International

  • Raffen landfill site, Cork, Ireland

    AFS were awarded a contract to design a gas and leachate collection system, and carry out a 10-week gas pumping trial to evaluate the levels of gas being generated from Raffen Landfill Site. From the pumping trial data, a 200m3/hr HT flare was designed, built and installed. A hydrovane compressor/receiver/dryer package was installed to operate ten pneumatic leachate extraction pumps. Within ...

  • How to Choose a Site for a Shipping Container

    In our Renters Guide, we discussed many things to consider when renting or leasing a storage/shipping container.  Once you’ve made the decision that you need a shipping container, you will need to figure out where to place it.   There are a number of factors to consider when choosing a site.  They include: Accessibility ...


    By Pac-Van, Inc.

  • Clarke Energy & GE`s Distributed Power Collaborate on On-Site Power Plant to Boost Mozambique`s Local Grid - Case Study

    GE Supplying 10 of its J624 Jenbacher Gas Engines for the Kuvaninga Energia Project 40 MW On-Site Power Plant to provide More Reliable Electricity to Grid in Southern Mozambique Clarke Energy Contract Marks First Jenbacher Gas Engine Order in Mozambique Liverpool, UK—GE Power & Water’s Distributed Power business (NYSE: ...


    By Clarke Energy

  • Drought risk modelling for thermoelectric power plants siting using an excess over threshold approach

    Water availability is among the most important elements of thermoelectric power plant site selection and evaluation criteria. With increased variability and changes in hydrologic statistical stationarity, one concern is the increased occurrence of extreme drought events that may be attributable to climatic changes. As hydrological systems are altered, operators of thermoelectric power plants need ...


    By Inderscience Publishers

  • North of Scotland shines for Moray ‘super-solar’ site

    A massive solar project in Moray which could provide enough electricity to power the whole of Elgin demonstrates that the north of Scotland is a prime location for this type of renewable energy solution. The ambitious energy project will use around 200,000 solar PV panels and will provide enough electricity for 21,000 homes. It is being planned by Elgin Energy at the former RAF airfield at ...


    By AES Ltd

  • E.On on-site sewage treatment plant (Ratcliffe-on-Soar)

    Located in Nottinghamshire, E.On's Ratcliffe-on-Soar facility is one of the most efficient coal fired power stations in the UK. With a total generation capacity of 2,000MW it produces enough electricity to meet the needs of approximately 2 million people. In March 2008 WPL were contacted by E.On to enquire about a replacement sewage treatment solution to serve personnel located at the site's ...


    By WPL Ltd

  • Technical basis for off-site emergency planning in France

    Past experiences from nuclear accidents have clearly shown the importance of being prepared to manage these situations from public information to implementation of protective actions. This paper summarises the criteria used as a basis for off-site emergency planning and preparedness in France. The emergency response organisation, the general organisational scheme of actions, criteria for ...


    By Inderscience Publishers

  • Environmental movements and social networking sites in Bangladesh

    This paper aims to explore the current trend of environmental movements and its relationship with social networking sites (SNS) in Bangladesh, the most vulnerable country to climate change impacts in the world. SNS is increasingly being used in environmental movements in the disaster–prone country and it has a significant impact on activism. This study was undertaken on a recent protest against ...


    By Inderscience Publishers

  • Brown to green: A new use for blighted industrial sites

    The Philadelphia Navy Yard sprawls over 1,200 acres on the banks of the Delaware River, a once-great shipyard now being transformed into a mix of research facilities, corporate offices, and manufacturing plants. In one remote, seven-acre corner - a nondescript plot of land with a highway bridge towering above it - the Navy Yard's industrial past is palpable. Reeds and an occasional tree sprout ...


    By GLOBE SERIES

  • Wetlands for Industrial Wastewater Treatment at the Savannah River Site

    ABSTRACT The A-01 effluent outfall, which collects both normal daily process flow and stormwater runoff from a industrial research facility, did not meet the South Carolina Department of Health and Environmental Control (SCDHEC) National Pollutant Discharge Elimination System (NPDES) permit limits for metals, toxicity, and total residual chlorine at the outfall sampling point. Copper was the ...


    By Weston Solutions, Inc

  • Landfill site selection by using geographic information systems

    Abstract  One of the serious and growing potential problems in most large urban areas is the shortage of land for waste disposal. Although there are some efforts to reduce and recover the waste, disposal in landfills is still the most common method for waste destination. An inappropriate landfill site may have negative environmental, economic and ecological impacts. Therefore, it should be ...


Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you