phase ii assessment Articles

  • Phase I and Phase II environmental site assessment

    Troy Risk was approached by Keep Indianapolis Beautiful, Inc. (KIBI) to complete a combination Phase I Environmental Site Assessment and Phase II Subsurface Investigation, on a multi-lot parcel that would be KIBI’s new headquarters building. Troy Risk performed the Phase I / Phase II on a not-for-profit basis in support of the merit of KIBI’s mission. The historical use of the ...


    By Troy Risk, Inc.

  • Rapid phase ii site investigation for a former petrol filling station

    Client: Argyll Environmental Ltd Location: Oxford, UK Services: Contaminated Land Site Investigation, Human Health Risk Assessment, Controlled Waters Risk Assessment, Strategic Advice on Brownfield Land Divestment, Contaminated Land Risk Assessment, Due Diligence, Rapid Site Investigation Summary: ESI provides rapid site ...

  • Methodology for conducting screening-level ecological risk assessments for hazardous waste sites. Part II: grouping ecological components

    Screening-level ecological risk assessments are commonly conducted to identify those contaminants and receptors on which to focus future phases or tiers of the ecological risk assessment process. Most screening assessments are performed using a suite of individual species subjected to intensive evaluation of exposure (endpoint species) and selected for their appropriateness for serving as ...


    By Inderscience Publishers

  • Environmental Assessment Brownfield Study

    In late 2011, Global was contracted by the Genesee County Land Bank and City of Flint to prepare an Environmental Assessment (EA) in accordance with guidelines set for by the U.S. Department of Housing and Urban Development (HUD) 24 CFR Part 58 for the Smith Village Project. Global utilized the HUD recommended format during the preparation of the EA including completion of the Statutory Checklist ...

  • Ecological Risk Assessment

    In recent years, ecological risk assessment (ERA) has emerged as an important part of environmental protection programs. The following discussion provides a brief overview of ERA issues. What is ecological risk assessment? Ecological risk assessment is the practice of determining the nature and likelihood of effects of our actions on animals, plants, and the environment. ...

  • Managing the product development process. Part II: case studies

    In part I, the management of product development was studied, and a number of methodologies were assessed. The work identified the principle strengths and weaknesses contained within structured product development processes in use in industry today. These methodologies have been credited with a fair degree of success in improving the productivity and quality of the product development process. ...


    By Inderscience Publishers

  • Environmental assessments and audits at aviation facilities

    Environmentalists are all about “green”, but there is another type of green that is associated with being environmentally compliant – money. There are primarily two types of environmental assessments that are performed at aviation facilities that can affect a company’s bottom line: Phase I/II Environmental Site Assessments (ESA) and General Facility Audits. The ESAs are also referred to as due ...


    By DES, Inc.

  • Site assessments and remediation case study

    Service(s) performed: Phase I site assessment/soil investigation/soil remediation project for a golf course Summary: Prior to the sale of the golf course property, our experts were engaged to conduct a Phase I Site Assessment. Due to poor management practices, the facility was found to have multiple releases of fuel and waste oil, which were above acceptable ...


    By EFI Global, Inc.

  • How long is my Phase I ESA, Transaction Screen or BEA good for?

    Duration of Reports & Validity of Environmental Due Diligence Reports In an ideal world, environmental due diligence reports would be like honey or soy sauce and last for many years.  Since shelf-life varies on reports, you need to be aware of the limitations and risks of using old or outdated information for current real estate transactions.  Below, we outline the ...


    By PM Environmental

  • Renewable Energy Projects on Contaminated Property | Managing the Risks Part II

    Part II of Renewable Energy Projects on Contaminated Property | Managing the Risks The First entry can be found at Part I Risk and Exposures in the Life Cycle of a Project The typical renewable energy project involves multiple parties: tax equity investors; equity investors; local utilities; engineering, procurement, ...

  • Oil Spill Eater II used on another shoreline spill in Estancia Philippines

    “A significant spill of heavy oil (bunker C type) occurred when Power Barge No. 103 ran aground at the shores of Estancia during the height of typhoon Haiyan. Between 21 and 23 November, environment experts from the Philippines Environmental Management Bureau visited the site of the oil spill together with a United Nations Disaster Assessment and Coordination (UNDAC) environment expert, ...

  • Land quality baseline assessment of a food manufacturing facility

    Client: Food Manufacturer Location: South-Wales, UK Services: Contaminated Land Site Investigation, Due Dilligence, Rapid Site Investigation. Summary: A food manufacturer wished to sell a drink packaging operation, and needed an environmental investigation to support the marketing of a site. ESI initiated our Rapid Phase ...

  • Quantitative risk assessment for contaminated sites in Spain

    Environmental Quantitative Risk Assessment is one of the key factors in the Decision Making Process for contaminated sites. Numerous decisions have to be made before, during and after conducting a quantitative risk assessment.Risk assessment is based on the information gathered previously: Historical information (Phase I) Site characterization (Phase II) Toxicological ...

  • Regionally Based Assessment of Persistent Toxic Substances

    Untitled Document EXECUTIVE SUMMARY In 1997 the United Nations Environment Programme (UNEP) Governing Council decided that immediate international action ...


  • Methods for microbiological quality assessment in drinking water: a comparative study

    The present study aimed to compare several methods for quantifying and discriminating between the different physiological states of a bacterial population present in drinking water. Flow cytometry (FCM), solid-phase cytometry (SPC), epifluorescence microscopy (MSP) and culture method performances were assessed by comparing the results obtained for different water samples. These samples, ...


    By IWA Publishing

  • An integrated framework for comparative assessment of electricity supply chains and strategies: the DECADES project

    This paper presents the results obtained in constructing and implementing a general framework for performing a comprehensive comparative assessment of electricity supply chains and strategies within the inter-agency join project on DECADES (Databases and mEthodologies for Comparative Assessment of Different Energy Sources for electricity generation). The project was established in 1992 by nine ...


    By Inderscience Publishers

  • Application of Monte Carlo Analysis for Assessing Radiation Doses and Risks to Humans

    ABSTRACTThis BIOMASS Theme 2 report has been produced by the Remediation Working Group, which is concerned with the evaluation of the reliability of dose and risk assessment methodologies applied in support of decisions related to the cost-effectiveness of risk reduction measures within an environmental remediation programme. Scenarios have been developed concerning the site contaminated by an ...


    By Oracle

  • Can A Consulting Firm with LSRPs on Staff Provide Confidential Due Diligence?

    Many clients raise questions regarding the state of the environmental due diligence process in New Jersey, in the wake of the Site Remediation Reform Act’s (“SRRA”) passage and the institution of the Licensed Site Remediation Professional (“LSRP”) program.  These questions often concern whether an environmental consulting firm can conduct a confidential due ...

  • Case Study: City of Torrance Library

    Ellis provides indoor air quality studies, Phase I and II environmental site assessments, and other environmental consulting services for the City of Torrance, Manhattan Beach, Redondo Beach, Santa Monica, Pasadena, City of Commerce, and other Southern California schools and municipalities. Our success has been built on our ability to respond – quietly, quickly, and efficiently - to every new ...

  • Integrity and perfomance evaluation of new generation desalting membranes

    Various RO membrane integrity monitoring methods are currently being evaluated during pilot testing at the North City Water Reclamation Plant (NCWRP) located in San Diego, CA. The main purpose of the testing is to assess both direct and indirect monitoring techniques currently available to measure the integrity and reliability of RO membranes during water reclamation. Specific methods being ...


    By Toray Chemical Korea

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you