plastic district heating pipe Articles

  • Operator Strategies : Sorting Out the Plastic

    BETTER BUGS Ideas and products in the Better Bugs category attempt to affect the biological components and biochemistry of processes by altering the mix of microorganisms or enzymes present. After all, biology is the foundation of many, if not most, organics recycling systems. Pyrophiles: The first example of Better Bugs involves pyrophilic organisms, bugs that can take the heat. This example is ...


    By BioCycle Magazine

  • Bioremediation of diesel oil - derwent island, national trust, united kingdom

    Introduction A spillage of red diesel oil (heating oil) from a holding tank located on Derwent Island in Lake Derwentwater, Cumbria, has been successfully treated using Microbac"s oil degrading bacterial cultures. The spill occurred in the Lake District National Park and a major concern was contamination of the lake water. The main problem associated with the work was access to the island ...


    By Microbac Ltd

  • Biocycle world

    RECYCLING COALITION CALLS FOR MORATORIUM ON PLA BOTTLESA coalition of recycling organizations challenged NatureWorks' plans to push use of its biobased plastic, polylactic acid (PLA) in bottles. It called on the company to agree to a moratorium on any further expansion until the bioresin's recyclability has been demonstrated. A subsidiary of Cargill, NatureWorks has commercialized the ...


    By BioCycle Magazine

  • Renewable energy marketplace

    ALLU Group markets two types of equipment for use in biomass energy operations. The ALLU Screener Crusher bucket attaches to a front-end loader. The bucket is designed to aerate, crush, screen and mix at one time. The Screener Crusher has a rigid steel frame, onto which horizontally rotating screening and crushing drums are mounted. All the drums rotate in the same direction. There are several ...


    By BioCycle Magazine

  • Performance of the low-emission flare

    Job report / Elbisgraben (Bale / Switzerland) The summer of 1992 had finally arrived. The 5MW low emission furnace in the district heating station Liestal was ignited, supplied with landfill gas from Elbisgraben landfill. Since then the plant has been running continuously and the comprehensive measurements taken, verify that all targets aimed at have been achieved: plant ...


    By Hofstetter BV

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you