pre-grinding Articles

  • Application range of conical cylindrical hardened gear reducer

    1. The conical cylindrical hardened gear reducer is an external gear transmission mechanism in which the input and output shafts are in a vertical state, and the main transmission parts are made of high-quality alloy steel. The gear is made by carburizing, quenching and grinding, with 6 levels of precision. The product has the advantages of high carrying capacity, long life, small size, high ...


    By Sogears

  • PUB - Singapore - Jurong - Case Study

    Client: PUB Solution: CambiTHP - B6 Jurong The Jurong WRP, owned and operated by PUB (Public Utility Board, Singapore) is located in the Jurong district, in the west part of Singapore. The plant is treating sludge from the waste water plant. As part of the Phase 4 Expansion project PUB choose to ...


    By Cambi Group AS

  • Waterschap De Dommel - Tilburg - Case Study

    Client: Waterschap De Dommel Solution: CambiTHP - B12 Tilburg Waterboard De Dommel (WDD) is responsible for water management and wastewater collection and treatment in the South-Eastern part of the Netherlands, covering approx. 151.000 ha and collecting wastewater from approx. 900.000 inhabitants. WDD operates in total 8 ...


    By Cambi Group AS

  • Al Khafji SWRO plant - Case study

    Project Facts Advanced Water Technology (AWT) build the Al Khafji Seawater Reverse Osmosis SWRO Desalination Plant, which is the world's first large-scale solar-powered desalination plant. It is located in Al Khafji to the north-eastern part of Saudi Arabia near the Kuwait border. The desalination plant was completed by late 2017. It will supply 60,000m³ of desalinated seawater a ...

  • AmperVerband - Geiselbullach - Case Study

    Client: Amperverband Solution: Cambi SolidStream Amperverband At AmperVerband WWTP, Cambi has installed its first SolidStream plant. The SolidStream plant now works a full scale demonstration plant, treating all digested sludge from the waste water treatment plant. AmperVerband WWTP treat sludge from its 150 000 inhabitants, in addition to ...


    By Cambi Group AS

  • Scottish Water - Edinburgh - Seafield - Case Study

    Client: Scottish Water Solution: CambiTHP - B6 Seafield On 2 October 2013, MWH Treatment awarded Cambi a contract for the installation of two lines of Cambi’s modular THP B6 system, at Stirling Water’s Seafield Waste Water Treatment Works, Edinburgh, Scotland. Each line is capable of treating 50 dry tonnes of ...


    By Cambi Group AS

  • Summer Camp Experience - The Minnesota onsite association installs technology to bring wastewater treatment at a Girl Scout camp into the 21st century

    After several weeks of preparation by James Brothers Construction, six advanced treatment systems were installed on June 22 and 23 at the Singing Hills Girl Scout Camp near Elysian, Minn., during the Minnesota Onsite Wastewater Association (MOWA) 2007 summer seminar. The event was an opportunity for onsite professionals to get hands-on training and experience installing new technologies while ...


    By BioMicrobics, Inc.

  • Athens - Psyttalia - Case Study

    Client: EYDAP Solution: CambiTHP - B6 Psyttalia The wastewater treatment plant of Psyttalia, is the final recipient of domestic sewage and pre-treated industrial wastewater of the greater Athens area in Greece, receiving an average wastewater flow of 730.000 m³/d, with a biological treatment capacity of 3,500,000 ...


    By Cambi Group AS

  • Beijing - Gao Bei Dian Water Reclamation Plant - Case Study

    Client: Beijing Drainage Group Solution: CambiTHP - B12 On 1st September 2014, Cambi was awarded the initial Beijing project, Gao Bei Dian, from Beijing Drainage Construction Company, a flagship for large-scale sludge projects with Cambi Thermal Hydrolysis Process (Cambi THP). The ...


    By Cambi Group AS

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you