rata testing Articles

  • Gas turbine compliance emissions test case study

    CKwas retained by Lake Road Generating Company, LP (Lake Road) to conduct a compliance emissions test program on three combustion turbine and heat recovery steam generators (CT/HRSG). The purpose of this program is to demonstrate that emissions from the CT/HRSGs are within the emission limits specified in the operating permit issued by the Connecticut Department of Environmental Protection ...


    By CK Environmental, Inc.

  • Mobile Stationary Source Emissions Testing, Coming to a Facility Near You?

    Last week, Antea Group had the unique opportunity to perform a RATA (relative accuracy test audit) of the emissions from a thermal oxidizer at an ethanol production facility located in Minnesota using a state-of-the-art mobile testing laboratory. During this RATA audit, actual stack emissions levels (including NOx, SOx, CO2, CO, O2, flow rate, temperature, velocity and pressure) from the ...


    By Antea Group - USA

  • Part 75 Conformance - Is your AETB ASTM D7036 Accredited?

    We have reviewed 2012 EPA Part 75 test reports and discussed EPA’s electronic reporting and source tester requirements with Part 75 source owners.  We conclude that many owners and environmental specialists who enter test data into EPA data bases are not familiar with the range of EPA’s expectations for source tester (Air Emission Testing Body or AETB) conformance to ...


    By Golden Specialty, Inc.

  • The Cost of Inaccurate CEM Calibration Gases

    Utility companies and other users of Continuous Emissions Monitoring (CEM) calibration gases often mistakenly consider them a commodity, making price the primary purchase consideration. Consequently, many are willing to settle for calibration gases that are ...

  • Environics - Reducing calibration gas cost by up to 60%

    EPA's appendix 'M' 40 CFR 51 reduces calibration gas cost by 60%By: Terrence P. Dunn, President of EnvironicsOn May 30, 1995, the EPA published the final version of Method 205 for inclusion in Appendix M of 40 CFR Part 51 entitled, 'Verification of Gas Dilution Systems for Field Instrument Calibrations.' Continuous emissions monitoring systems (CEMS) require ...


    By Environics, Inc.

  • Navigating NSPS subpart Db for boilers: a case study

    Over the past year, Trinity assisted a chemical company with the permitting and installation of a new 220 MMBtu/hr package boiler. The new natural gas-fired boiler replaces coal-fired units that were installed in the 1940s. Navigating through the numerous, and at times conflicting, regulatory requirements applicable to such a unit has been challenging. With careful planning and implementation, ...


    By Trinity Consultants

  • Continous Emission Monitoring (CEMs)

    Presented in Track B1: CEMs at EUEC 2011,January 31 Phoenix, Arizona   B1.1  | Particulate CEM for wet FGD plant William Averdieck |  Managing ...

  • Designing renewable contracts that value CSP storage

    As California ramps up its storage requirements, it has not included Concentrated Solar Power (CSP) with integrated energy storage. Instead it is testing pilot projects using batteries at utility-scale, even though it must be obvious to bean counters at utilities ...


    By FCBI Energy

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you