remediation consulting Articles

  • Remediation consultancy, South Wales

    Project Remediation Strategies were retained to assist a large chemical facility with the long term management of a groundwater contamination issue. Contaminants had historically entered groundwater following a spill event and despite previous remediation works by others, a residual contaminant plume remained present and was continuing to migrate off-site. Following on from previous ...


    By Remediation Strategies Ltd.

  • Horizontal Directional Drilling - A Green and Sustainable Remediation Remedy

    Interest in using sustainable practices and technologies for environmental cleanup has increased notably within the past few years. The US EPA and many states have published recommended practices to reduce the environmental footprint of cleanup operations, and many consultants and contractors are attempting to “go green” in contaminated site remediation. It makes sense to conserve ...

  • Contaminated soil remediation - Inverurie

    Remove Contaminated Soil from Residential Gardens & Re-Landscape Client: MTM Construction Consultant: WA Fairhurst and Partners Challenge: Advise on the removal of contaminated material from a residential area built on a former town gas site. Reinstate existing landscaping. Applied ...


    By Soilutions Ltd

  • Soil & water remediation - Burntisland

    Caustic Soda Soil & Water Remediation & Demolition Works Client: Alcan Chemicals Ltd. Consultant; RPS Plc Challenge: Address contamination including elevated pH levels up to 14 pH arising from the use of caustic soda within the site processes for producing allumina, hydrocarbon contaminated material from ...


    By Soilutions Ltd

  • Remediating Unforeseen Sewer Contaminants

    Getting the PCBs out Who: Jersey City, N.J., Municipal Utilities Authority Tons of clean sediment removed: 4,469 Tons of PCB-contaminated sediment: 2,502 Consulting engineer: Boswell Engineering: South Hackensack, N.J. Environmental maintenance contractor: National Water Main ...

  • Remediation on residential properties - Peebles

    Removal of Contaminated Soils From Residential Gardens & Re-Landscape Cient: Local Authority, Scottish Borders Council Challenge: Remove contaminated material from the garden areas of houses built upon a former ash spoli heap & reinstate existing landscaping. Applied technology: Excavation and removal ...


    By Soilutions Ltd

  • Water remediation - Stornoway

    Hydrocarbon Contaminated Water Remediation Client: Highlands & Islands Airport Ltd www.hial.co.uk Challenge: To separate free phase and remove dissolved hydrocarbons from a redundant fuel pipe linking a fuelling jetty to storage tanks, across machair and marsh land at the end of the main runway, 1.6km onshore. Applied ...


    By Soilutions Ltd

  • The power of precise remediation

    Design matters in in-situ remediation. Just ask Resource Geoscience, Inc. (RGI), a Remediation Products, Inc. BOS 200 approved installer and certified Trap and Treat Consultant. They recently demonstrated that when paired with proper injection design and precise application, BOS 200 can get the job done where others fail. The site:  Contaminated clay site in Colorado ...

  • Tackling remediation emissions

    Organisations commissioning regeneration projects now have the option to substantially reduce the carbon emissions associated with any remediation project, while offsetting the remaining carbon impact of these works, says Joe Teer, operations director of QDS. QDS introduced a carbon neutral remediation (CNR) service earlier this year triggered at this particular time by the fact ...


    By Newzeye Ltd

  • Hydrocarbon contaminated soil remediation - Fife

    Removal of Contaminated Soils from Residential Gardens & Re-Landscape Cient: Local Authority, Central Belt of Scotland Consultant: RPS Plc. Challenge: Remove contaminated material from the garden areas of houses built upon a former town gas site. Reinstate existing landscaping. Applied ...


    By Soilutions Ltd

  • Emergency remediation response case study

    Services Performed Emergency remediation response, oil and hazardous waste consulting and a mold/indoor air quality (IAQ) testing Summary Following the flooding of the Spicket River during the Spring 2006, EFI Global was engaged to evaluate a nursing home in Lawrence, MA. After the initial environmental evaluation, our team observed that the basement and ...


    By EFI Global, Inc.

  • Remediating groundwater contaminated with chlorinated solvents

    Chlorinated solvent contaminationof groundwater is a recognizedbarrier to both potablewater use and brownfield siteredevelopment in Canada.Several high-profile trichloroethene(TCE) contaminant issues such as thosein Cambridge, Ontario, and in Shannon,Québec, have increased public awarenessof this problem, and ...


  • Groundwater remediation with Hydrogen Release Compound

    A substantial manufacturing site in Harlow, Essex, was contaminanated with chlorinated solvents used in degreasingoperations. The main compounds of concern were trichlorethene (TCE), trichlorethane (TCA) carbon tetrachloride (CT) and daughter products. The groundwater was at a depth to water of approximately 1.75m with a river around 600m to the north. Glacial deposits included variable clay ...


    By REGENESIS

  • Mold Remediation Guidance For Indoor Environment

    Remediation contractors are generally very conscientious, trying hard to bring each project to a condition where it will pass “clearance  testing” (the  Post-Remediation  Verification  [PRV] inspection) on the first try. Sometimes the cleaning attempts are unsuccessful. This will certainly cost the contractor additional cleaning ...

  • Case study - Mobile remediation system

    OVERVIEW A large consulting and contracting firm owns and operates several ex-situ Thermal Desorption Units (TDUs). Each single-load Thermal Desorption Unit has the capacity of desorbing 15 tons of soil per hour at a temperature of 400°F - 900°F. These Thermal Desorber Units have been designed to operate on both chlorinated and non-chlorinated RCRA, CERCLA, and private industry ...

  • Eastern Montana - Remediation below operating facility

    Thermal Remediation Services, Inc. (TRS) worked as a subcontractor to Kennedy Jenks Consultants (KJ) to remediate trichloroethene (TCE) in soil during the winter months in Eastern Montana. The project was performed for a firm fixed price based on the TRS standard contract that included installing and operating the ERH system until either the remedial goal was achieved or the design energy was ...


    By TRS Group, Inc.

  • Evaluating land banks – getting the remedial cost right

    The current economic conditions have left few sectors of the economy with the level of pain currently being suffered by the property industry, particularly in the UK. Suddenly, even some of the leading property companies are being spoken of as needing to divest assets and at worst, as being takeover targets as liquid investors continue to see the longer term value contained in their portfolios ...


    By WSP | Parsons Brinckerhoff

  • Remediating groundwater contaminated with chlorinated solvents - a Canadian perspective

    Chlorinated solvent contamination of groundwater is a recognized barrier to both potable water use and brownfield site redevelopment in Canada. Several high-profile trichloroethene (TCE) contaminant issues such as those in Cambridge, Ontario, and in Shannon, Québec, have increased public awareness of this problem, and also stimulated the Canadian consulting community to consider the use of in ...


  • The Influence of an Integrated Remedial System on Groundwater Hydrology

    ABSTRACT This paper summarizes the development of a remedial system designed to hydraulically contain and ultimately reduce a plume consisting of primarily 1,1,2,2-tetrachloroethane (1,1,2,2-TeCA). The system consists of groundwater circulating wells or extraction wells located in the core of the 1,1,2,2-TeCA plume to provide active source control, combined with monitored natural attenuation ...


    By Weston Solutions, Inc

  • Case study - World`s largest remediation site

    Overview Hong Kong's Kai Tak Airport, the world's busiest airport in 1997, became the world's largest remediation site once it was closed. When the airport was decommissioned in 1999 in favor of the new Chek Lap Kok Airport, the government planned to rapidly clean up the site for commercial and residential development. After many years of soil penetration by various ...

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you