remediation system Articles

  • Multipurpose Horizontal Remediation Wells Treat Impacts from Former DOD Operations

    The site, a former DOD plant previously used for the manufacture of aircraft and missile systems had TCE impacts that posed a threat to the current occupants at the site.    The site had been recently redeveloped into an industrial complex for several companies. For the new occupants, a disruptive indoor construction to install a vertical remediation system was out of the question. In ...

  • Key Elements of a Successful Horizontal Remediation System

    Environmental remediation professionals around the country (and internationally) are rapidly learning that Horizontal Remediation Systems are an essential “tool in their remediation toolbox”. When designed and executed by experienced horizontal environmental drilling experts, Horizontal Remediation Systems can be extremely effective at achieving rapid site closure compared to vertical ...

  • The Power of 243 Vertical Wells

    This is a comparison of a Horizontal Remediation System and a Verticle Well System at a theoretical site with an area of 388,800 ft2   where with a Radius of Influence (ROI) of 20 feet, 12 Horizontal Remediation Wells, depending on plume geometry, can cover the same area as 243 vertical wells with the same ROI per well. Not only ...

  • Vapor intrusion pathway investigation

    The BEACON samplers defined the vapor intrusion of tetrachloroethene and 1,1-dichloroethene, while the Summa canisters (EPA Method TO-15) reported all non-detects. The BEACON survey enabled detection of some chemicals at levels below the Summa canisters practical quantitation limits providing a more complete and realistic vapor intrusion exposure pathway evaluation. Based on the defined vapor ...

  • Loveland Case Study (In SItu Gas Thermal Remediation (GTR™))

    The Loveland Sinclair gasoline station was selected for In-Situ Thermal Remediation (ISTR) using Gas Thermal Remediation (GTR) technologies. The GTR remediation system was designed to target a treatment area of approximately 14,000 square feet and includes a treatment volume of approximately 3,100 cubic yards. Vadose and saturated zone impacts, including a thin layer of light non-aqueous phase ...

  • ORC® Replaces Pump and Treat/SVE Systems and Gains Site Closure

    Site Summary Leaking gasoline pipelines caused the groundwater to become contaminated with TPHg at concentrations exceeding 6,000 ug/L. Because the site was located in a busy, high traffic area (in the vicinity of Portland International Airport), the consultants made it a priority to find a less obtrusive and “invisible” remediation system to replace the pump and treat and SVE systems ...


    By Regenesis

  • Remediation of TCE DNAPL under an operating industrial manufacturing facility - air force plant 4 Fort Worth, TX

    As a subcontractor to URS Corp., TRS designed, installed and operated a full-scale Electrical Resistance Heating(ERH) remediation system covering an area of about 1/2 acre inside Building 181 at Air Force Plant 4 in Fort Worth, TX. This is the most complex application of ERH ever completed inside and underneath an operating, heavy industrial manufacturing facility. The cleanup objectives for the ...


    By TRS Group, Inc.

  • Groundwater remediation using simulation-optimisation approach: A review

    Optimal design of a remediation system has been an active and important area of research since the past several years due to its potential to reduce the remediation cost substantially. The paper presents the state-of-the-art for application of simulation-optimisation approach to design an optimal groundwater remediation system. In the simulation-optimisation approach, the researchers have used ...


    By Inderscience Publishers

  • Case study - Petroleum remediation systems

    Overview A major oil company was looking for a way to stay ahead of EPA regulations for soil vapor extraction of BTEX and the subsequent treatment of these gases. They were looking for one company that could offer competitive pricing, local support service, and the application expertise to provide 50 remediation units throughout the ...

  • ORC vs. AS/SVE Cost Comparison at UST Site, Covington, IN

    Site Summary The site, located in Covington, Indiana, was chosen for a pilot test, to demonstrate the effectiveness of ORC in treating the existing benzene and MTBE concentrations. Contamination in the groundwater had resulted from leaking gasoline UST’s. In addition to the pilot test, a cost-comparison was also prepared to illustrate the potential for cost savings associated with the use of a ...


    By Regenesis

  • Nitrogen removal from raw landfill leachate by an algae–bacteria consortium

    A remediation system for the removal of nitrogen from landfill leachate by a mixed algae–bacteria culture was investigated. This system was designed to treat leachate with minimal inputs and maintenance requirements, and was operated as an open semi-batch reactor in an urban greenhouse. The results of this study showed a maximum nitrogen removal rate of 9.18 mg N/(L·day) and maximum biomass ...


    By IWA Publishing

  • Soil and Ground Water Remediation Case Study

    On this State Funded Clean-Up project, Global was the project engineer and was responsible for the design of an air sparging/soil vapor extraction remediation system. The system included five soil vapor extraction wells and twelve sparging wells that operated on a rotating schedule. One of the soil vapor extraction wells and nine of the sparging wells were installed as horizontal wells beneath ...

  • Case study - Mobile remediation system

    OVERVIEW A large consulting and contracting firm owns and operates several ex-situ Thermal Desorption Units (TDUs). Each single-load Thermal Desorption Unit has the capacity of desorbing 15 tons of soil per hour at a temperature of 400°F - 900°F. These Thermal Desorber Units have been designed to operate on both chlorinated and non-chlorinated RCRA, CERCLA, and private industry ...

  • The use of vetiver (Vetiveria zizanioides L.) for the remediation of wastewater discharged from tapioca factories

    Three experiments were conducted to study the potential use of vetiver (Vetiveria zizanioides L.) to remediate wastewater discharged from a tapioca factory. Two experiments studied the tolerance of vetiver to grow in wastewater, and the other studied the factors influencing the effectiveness of vetiver for the remediation of the wastewater. Vetiver grew well in all wastewater preparations and was ...


    By Inderscience Publishers

  • Remediation of PCE belowgrade in an active alley southside Chicago, IL

    Under contract to Malcolm Pirnie, TRS Group, Inc. (TRS) designed, installed and operated the ERH remediation system at this dry cleaner facility in an active alley behind a shopping mall. The goal of the remediation project was to reduce tetrachloroethene (PCE) concentrations in soil to less than 11 milligrams per kilogram (mg/kg). While site soil also contained other chlorinated volatile organic ...


    By TRS Group, Inc.

  • The Influence of an Integrated Remedial System on Groundwater Hydrology

    ABSTRACT This paper summarizes the development of a remedial system designed to hydraulically contain and ultimately reduce a plume consisting of primarily 1,1,2,2-tetrachloroethane (1,1,2,2-TeCA). The system consists of groundwater circulating wells or extraction wells located in the core of the 1,1,2,2-TeCA plume to provide active source control, combined with monitored natural attenuation ...


    By Weston Solutions, Inc

  • Horizontal Remediation Wells - Don`t Disrupt your Client`s Business

    The use of Horizontal Remediation Wells for environmental cleanup is a proven solution for project managers with many benefits including the benefit of the continuation of business activities during mitigation or remediation activities.   Since 1993, Directional Technologies, Inc. has installed thousands of Horizontal Remediation Well systems in the United States and abroad at many different ...

  • Is a Horizontal Remediation Well System Right for My Project?

    So your remediation project is moving towards a choice of remedy, whether it involves Dual Phase Extraction, Total Phase Extraction, Biosparging, Soil Vapor Extraction (SVE), Air Sparge (AS), or Chemox Delivery, or any combination of the above. Now, the concept of horizontal remediation wells (HRW’s) for your site seems intriguing. So what do you need to consider before proposing a ...

  • Bollard Installation

    Sustained health and safety of the human population requires that remediation systems be set up to take care of high levels of contaminants in water bodies, soil groundwater or other locations as deemed fit. Environmental construction companies are frequently called up on for this purpose. Need for Bollard InstallationExecution of the remediation strategy may involve excavation, concrete coring, ...

  • Thermally activated persulfate oxidation of NAPL chlorinated organic compounds: effect of soil composition on oxidant demand in different soil-persulfate systems

    This study investigates the interaction of persulfate with soil components and chlorinated volatile organic compounds (CVOCs), using thermally activated persulfate oxidation in three soil types: high sand content; high clay content; and paddy field soil. The effect of soil composition on the available oxidant demand and CVOC removal rate was evaluated. Results suggest that the treatment ...


    By IWA Publishing

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you