remediation verification Articles

  • CH#954 - Diesel/Gasoline Remediation

    SITE OWNER: A Truck and Fueling Plaza SITE SURVEY: A tank area that had contained both diesel and gasoline tanks was discovered to have several leaks. The tanks from the pit area were removed. Definition and characterization revealed that not only the tank area was contaminated, but the contaminate plume had migrated under an area where a new building ...


    By Bio-Systems International

  • Mold Remediation Guidance For Indoor Environment

    Remediation contractors are generally very conscientious, trying hard to bring each project to a condition where it will pass “clearance  testing” (the  Post-Remediation  Verification  [PRV] inspection) on the first try. Sometimes the cleaning attempts are unsuccessful. This will certainly cost the contractor additional cleaning ...

  • Environmental data management support for a site requiring remediation

    Client: EDSR Ltd Location: Portugal Services: Geographical Information Systems, Environmental Data Management and Reporting Services Issues: Support required for the setting up of an environmental data management system Summary: ESI provided support to EDSR Ltd in setting up an environmental data ...


    By ESI Consulting

  • Web-based analytical services improve remediation efficiency

    In this article, Steven Holmes, from analytical services provider ALcontrol, explains how web-based software is helping to ramp up the speed of environmental analysis for remediation contractors such as Sanctus Limited. Background The development of brownfield sites can be more complicated and take longer than other types of building land. However, it is an attractive option ...


    By ALcontrol Laboratories

  • Spolchemie site remediation and NanoRem field site application

    Site Remediation The Spolchemie site was chosen as one of the NanoRem case study sites, to test two types of nanoparticles (NPs) (zerovalent iron - nZVI and iron oxide NPs) for in situ remediation of BTEX (Benzene, Toluene, Ethylbenzene, and Xylenes) contamination. Nanoremediation was seen as an opportunity to enhance the in situ biodegradation of the BTEX contaminants and to reduce the ...


    By NANO IRON s.r.o.

  • The DNAPL Remediation Challenge: Is There a Case for Source Depletion?

    Untitled Document Executive Summary Introduction Releases of Dense Non-Aqueous Phase Liquids (DNAPLs) at a large number of public ...


  • Emergency response and remediation of a petrol leak: petrol filling station

    Project: Emergency Fuel Leak at an Operational Petrol Station Client: Franchised petrol station operator Services: Emergency response/leak management, regulator negotiation, site investigation, remediation and verification Summary: Responsive, pragmatic advice and robust regulator negotiations aided rapid characterisation ...


    By ESI Consulting

  • First State-funded cleanup using electrical resistivity heating technology

    The Remediation and Redevelopment Division (RRD) completed remediation at a former dry cleaning facility in the city of Owosso using electrical resistivity heating (ERH) technology. Electrical resistivity heating is an in­situ electrical heating technology that uses electricity and applies it into the ground through electrodes. The resistance of the electricity traveling through the ground ...


    By TRS Group, Inc.

  • Emergency response and clean-up of a diesel leak: manufacturing facility

    Project: Emergency response and clean-up of a diesel leak Client: Confidential manufacturing company Services: Emergency response planning, environmental assessment, regulator liaison, remediation design Summary: Through rapid site characterisation and expert decision making ESI minimised the environmental damage ...


    By ESI Consulting

  • Geostatistical modelling of ground conditions to support the assessment of site contamination

    The pattern of ground contamination across a site depends on the historical pattern of contaminant releases at the surface and the redistribution and the fate of contaminants below the surface. Using these concepts a new site assessment approach (assessment modelling) is proposed based on the development of three stochastic models: a model of the physical structure of the ground materials beneath ...


    By Springer

  • Environmental data management support for a site requiring

    Project: Environmental data management support for a site requiring remediation Client: EDSR Ltd Location: Portugal Services: Geographical Information Systems, environmental data management and reporting services Summary: ESI provided support to EDSR Ltd in setting up an environmental data ...


    By EarthSoft, Inc

  • Case study - Baltimore City public works intervenes on pipe section about to fail

    Service: SoundPrint AFO Client: Baltimore City Project Date: 2012 Location: Baltimore, MD Type of Pipeline: Water Transmission Main Diameter: 54-inch (1350mm) Pipe Material: PCCP Baltimore City features 130 miles of Prestressed Concrete Cylinder Pipe (PCCP), 15 percent of which is Class IV PCCP installed in the 1970s. This particular class of pipe has been prone to early ...


    By Pure Technologies

  • Management and risk assessment of a chemical spill: engineering facility

    Project: Management and Risk Assessment of a Cleaning Effluent Spill  Client: Confidential Services: Spill response, environmental sampling, risk assessment, regulator liaison Summary: Proportionate risk assessment and pollution management to safeguard local surface waters and satisfy regulator requirements ...


    By ESI Consulting

  • CH#952 - Oil Contaminated Soil

    SITE OWNER: A National Overnight Express Package Company SITE SURVEY: Site and geological surveys revealed a contaminated area north of the facility and west of a diesel tank pit. The cause of the contamination was the result of two (2) underground storage tanks (UST™). One tank contained waste oil while the other contained new oil. Both tanks had ...


    By Bio-Systems International

  • Birmingham Water Works Board Leak Detection Program case study

    Service: SoundPrint AFO Client: Baltimore City Project Date: 2012 Location: Baltimore, MD Type of Pipeline: Water Transmission Main Diameter: 54-inch (1350mm) Pipe Material: PCCP ...


    By Pure Technologies

  • Monitoring fuels in Stormwater - Case study

    The Situation A major pipeline company has large storage tank farms throughout the Western States. The pipeline company transports, stores, blends additives, and distributes gasoline, diesel, and jet fuel to retail service stations and airports. Due to the quantity and movement of fuel at these facilities, there is always the potential for fuel spills. These facilities prevent out of ...

  • Automating Data Collection for Food Safety and Regulatory Compliance Audits

    [ Original Article Published on February 23, 2017 at www.Enviromon.net ] The demand for audits into manufactures and cold chains regarding food safety has surged in recent years due to changes in government mandates in response to an ...

  • Customer Success Story - Sunoco, Inc.

    At a Glance Company: Sunoco is a leading manufacturer and marketer of petroleum and petrochemical products. With 825,000 barrels per day of refining capacity, approximately 4,700 retail sites selling gasoline, approximately 6,000 miles of crude oil and refined product pipelines and 43 product terminals, Sunoco is one of the largest independent refiner-marketers in the United States. ...


    By ENFOS, Inc.

  • Single field mobilization completes site investigation and removal actions

    The Kentucky Research Consortium for Energy and the Environment (KRCEE) worked with the U.S. Department of Energy (DOE) last summer to introduce new approaches and technologies to the site cleanup program operating at the Paducah Gaseous Diffusion Plant (PGDP) in western Kentucky. A Triad demonstration was conducted at PGDP's Area of Concern (AOC) 492 that integrated several real-time ...

  • Legislation: The EU ETS Directive Revised: Yet Another Stepping Stone

    Keywords: EU Emissions Trading Scheme Directive, emission allowances allocation, single global carbon market, National Allocation Plan, monitoring and verifying emissions, auctions, solidarity mechanism The legislative process of revising the EU Emissions Trading Scheme (EU ETS) Directive1 was rapid. The European Commission set forward its proposal for revision as part of a broader ...


Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you