sewage sensor Articles

  • Environmental Sensors in Waste Management

    Issue: As part of an increasing sentiment among European consumers that environmental protection is important, concern about the impact of landfill is growing. Sensor technology makes it possible to measure and control inputs to landfill sites and pollutants arising from them. However, the exploitation - or uptake - of such technology has been lower than expected in the waste management sector. ...


  • Typical Sensor Location Considerations

    The sensor mounting location within a space may be dependent on many variables. There are no specific formulas since each application will have it’s own determining factors and priorities. These include, but are not limited to: source of gas: Is the source a combustion exhaust from a vehicle or furnace or a vapour from a tank spill, pipe leak, or faulty valve? density of ...


    By Arjay Engineering Ltd.

  • Continuous on-line monitoring of dissolved oxygen in the activated sludge of a sewage treatment plant

    Dissolved oxygen is traditionally measured using a Clark cell, which relies upon a gas-permeable membrane for its opera-tion. Such sensors are subject to fouling with subsequent loss of accuracy, making frequent maintenance and calibration necessary. The objective of this development was to take advantage of specific properties of microelectrode arrays, such as low flow-dependence, insensitivity ...


  • Sewage Treatment Plant reports success with HACH LANGE LDO

    Between 60 and 70% of the energy consumed by sewage treatment plants is used to aerate the activated sludge. Strategies aimed at reducing energy consumption are therefore usually focused on optimising the oxygen transfer into the aeration tank. All control systems are based on exact and precise measurement of the oxygen concentration. For process engineers, therefore, the issue is not whether but ...


  • Preventing waste water overspill in sewage pools case study

    Solid's SmartScan 50L provides an ultrasonic solution for effective sewer management in various locations. The waste water department of Jerusalem municipality in Israel is responsible for managing the city's complex sewer system. The system incorporates several sewage pools distributed in various locations, some of them in hard to reach locations. The problems The city of ...

  • Effective monitoring improves sewage flow management case study

    SmartScan 50 introduces an effective solution for flow measurement of sewage water in one of Poland's municipal waste water treatment plant. The city of Zblewo, Poland provides waste water treatment services to its inhabitants. The plant sought an ultrasonic measurement solution for monitoring the raw sewage flow during the treatment process. The problems When entering the ...

  • AVFM 5.0 area-velocity flow meter monitors sewage lagoon discharge flow - Case Study

    The Township of South Glengarry in Eastern Ontario discharges continuously from their 72,000 m3 sewage lagoon. But they ran into flow measurement problems when their magnetic flowmeter was unable to detect seasonal low flow rates. Operations Manager, Shawn Killoran selected a Greyline AVFM 5.0 Area-Velocity Flow Monitor because it was simple to install in a horizontal discharge pipe from the ...


    By Greyline Instruments Inc.

  • Dunstable sewage treatment plant steps up to mono nov for a complete extraction package

    Underlining its ability to supply either individual products or complete packaged systems for this type of application, Mono also provided two screw extractor systems and a single screw conveyor to partner an existingunit. The original step screen units installed on the Dunstable plant’s inlet flow had proved to be inefficient and unreliable. The replacement Discreen units now screen the inflow, ...


  • Calibration using 5 flow sensors saves the effort of extensive reconstruction measures

    "Abwasserzweckverband Breisgauer Bucht", a municipal association for sewage treatment in the south of Germany, operates a central wastewater treatment plant for its members (29 communities and cities). The WWTP covers a catchment area of 650km² and its treatment capacity is 600.000 population equivalents. The plant is treating wastewater from 375.000 residents as well as from industry and ...


    By NIVUS GmbH

  • Pump Station call outs a thing of the past - Case Study

    It’s 2:00 AM and a telephone rings in Eckville, Alberta. Rick McKinnon checks the display on his cell phone and groans. It’s another high level call out alarm from one of the town’s new sewage lift stations. He knows before he drives there that the system will be running on floats instead of the new ultrasonic level controller. ...


    By Greyline Instruments Inc.

  • Odour control: A successful experience in sorocaba city – Brazil

    Public concern over odours from sewage treatment facilities have been increasingly significantly in Brazil in recent years due to urban developments around existing plants or construction of new ones. The city of Sorocaba is an example where the expansion of the sewage collection and treatment system has increased and consequently more people have been exposed to bad odours. Due to this ...


    By IWA Publishing

  • Turbidity Measurements in Drinking Water, Effluent Discharges and Coagulant Controlling

    This month at Partech Water Instruments we’re talking about our turbidity sensors—fantastic to use as an environmental indicator. So how can they be used? We’re here to tell you about turbidity sensors being utilised for drinking water, effluent discharges and coagulant controlling. Turbidity Sensors and Drinking Water Turbidity sensors ...


    By Partech (Electronics) Ltd.

  • Open Channel Flow Monitors retired after 16 years continuous service - Case Study

    Long Sault WWTP Influent Flow Monitors Greyline Open Channel Flow Monitors were installed at the Wastewater Treatment Plant in Long Sault, Ontario when the SBR plant was originally commissioned in 1995. But after 16 years of continuous service, components for the old models became obsolete. Plant operators Caneau Water and Sewage Inc. decided to replace the instruments and new Greyline OCF ...


    By Greyline Instruments Inc.

  • Assessment on inflow and infiltration in sewerage systems of Kuantan, Pahang

    Inflow and infiltration are important aspects of sewerage systems that need to be considered during the design stage and constantly monitored once the sewerage system is in operation. The aim of this research is to analyse the relationship of rainfall as well as inflow infiltration with sewage flow patterns through data collected from fieldwork. Three sewer pipelines were selected at the ...


    By IWA Publishing

  • OCF 5.0 open channel flow monitors - monitor infulent at Long Sault WWTP plant - Case Study

    Greyline Open Channel Flow Monitors were installed at the Wastewater Treatment Plant in Long Sault, Ontario when the SBR plant was originally commissioned in 1995. But after 16 years of continuous service, components for the old models became obsolete. Plant operators Caneau Water and Sewage Inc. decided to replace the instruments and new Greyline OCF 5.0 Open Channel Flow Monitors were installed ...


    By Greyline Instruments Inc.

  • Efficiency of Process Measurement Technology for Determining Nutrient Parameters – Yesterday, Today and Tomorrow

    Abstract The costs and benefits of process measurement instruments in sewage treatment plants were the subject of intensive debate in the 1990s. Cost-benefit studies, comparing the potential savings in energy, consumables and personnel with the additional costs of using the instruments, resulted in recommendations specifying the minimum sewage treatment plant size at which the use of such ...


  • Sewer Level Monitoring - Photos

    Sewer Level Monitoring - Photos Photos in this article present the complexity and versatility of sewer level monitoring. When examining the photos, pay special attention to the stand-alone autonomous characteristics of each installation. In lack of any cabling from the outside, whether data cables or power cables, the solution is fed from its own battery power supply. Data is tranmitted ...

  • Portable Monitoring Instruments Solve Flow Rate Mystery - Case Study

    The Glen Walter Sewage Collection System was built to service 1080 customers in 1989. At the time the population was 850 but by 1995 the sewage treatment plant had already reached capacity. Shawn Killoran took over the Operations Manger position in 1999 and, along with the Mayor and Council, he immediately had concerns about the excess flow. The Township started by video taping all of the lines ...


    By Greyline Instruments Inc.

  • Case study - Water accountability portable monitoring instruments solve flow rate mystery - Case Study

    The Glen Walter Sewage Collection System was built to service 1080 customers in 1989. At the time the population was 850 but by 1995 the sewage treatment plant had already reached capacity. Shawn Killoran took over the Operations Manger position in 1999 and, along with the Mayor and Council, he immediately had concerns about the excess flow. The Township started by video taping all of the lines ...


    By Greyline Instruments Inc.

  • Case study - Flowmeter troubleshooting at the township of North Glengarry - Case Study

    The Problem... The forcemain meter at the pump station read five times higher than the open channel flowmeter at the lagoon 2 km away. The Township needed to determine which of the two flow meters was reading incorrectly. Troubleshooting Forcemain Flow... First step was to evaluate performance of the 12” magmeter at the sewage pump station. The cost ...


    By Greyline Instruments Inc.