  • Integrated planning of rehabilitation strategies for sewers

    Building measures in sewer systems are increasingly driven by rehabilitation/retrofitting and adaptation needs. Aging infrastructure together with changing boundary conditions (due to climate change, land-use change, demographic change) and also changing design standards and legislation require a prospective design to preserve the functionality of urban drainage systems not only today, but also ...


    By IWA Publishing

  • Rehabilitation of a Large Semi-Elliptical Sewer

    ABSTRACTThe Sanitation Districts of Los Angeles County (Districts) own, operate, and maintain a wastewater treatment and collection system that includes approximately 1300 miles of sanitary sewers ranging from 6 to 144 inches in diameter. A portion of the Districts’ Joint Outfall “A” Trunk Sewer was constructed of cast-in-place reinforced concrete having a semi-elliptical cross section and ...

  • Infrastructure Bypass: Rehabilitating the Nation’s Decaying Sewer Systems

    Billions of dollars in federal aid money has been allocated to rehabilitating our decaying sewer systems, and while these are projects that will be done, there will be associated problems with trying to keep roads and businesses open during this work. Typically, in rehabilitating existing sewer lines, the flow of sewage cannot simply be diverted—it must be “bypassed,” which ...


    By Griffin Dewatering

  • Turning data into decisions: Europe’s sewer rehabilitation tool

    CARE-S, a computer-based system for wastewater network management, is due to be launched later this year. BILL MCCANN speaks to SVEINUNG SAEGROV, editor of a new book from IWA Publishing which reports on the system’s development and the benefits it will offer network managers. Wastewater network managers in Europe will soon have available an advanced rehabilitation planning system based on an ...


    By WRc plc

  • Wastewater Treatment Facility Rehabilitation Arrowhead Sewer Company, Inc. Pocono Lake, Pennsylvania

    Arrowhead Sewer Company, Inc. hired Princeton Hydro, LLC to provide engineering services to reinstall an inflow Equalization Tank that floated due to unforeseen groundwater conditions. Given site and layout restrictions, Princeton Hydro designed groundwater and overland flow control elements to buffer the tank from groundwater uplift. The system consisted of two main parts: a diversion channel to ...


    By Invisible Structures, Inc.

  • Multifaceted sewer improvements program eliminates sewer connection moratorium and system overflows

    The sewer system serving Borough of Jewett City, Connecticut dates from the late 1800’s and was originally constructed as a combined sewer system with the discharges directed to the area rivers. In the 1970’s, the raw sewage discharges from the Borough system were removed from the rivers and redirected to a newly constructed wastewater treatment facility. However, the overflows from the ...

  • Excerpt Advanced Sewer Technologies Paper

    Abstract  This document seeks to collect into one place current and new technologies about sewerage system design. The document organizes the information found in the 295 documents that were reviewed into six subject areas: Advanced Onsite Technologies; Alternative Wastewater Collection System Designs and Technologies; Gravity Sewer System Design and Technology; Infiltration ...

  • Risk assessment of sewer condition using artificial intelligence tools: application to the SANEST sewer system

    Operation, maintenance and rehabilitation comprise the main concerns of wastewater infrastructure asset management. Given the nature of the service provided by a wastewater system and the characteristics of the supporting infrastructure, technical issues are relevant to support asset management decisions. In particular, in densely urbanized areas served by large, complex and aging sewer ...


    By IWA Publishing

  • Recovery of New Orleans Water and Sewer Systems Following Hurricane Katrina

    ABSTRACTHurricane Katrina and its aftermath damaged the water distribution system and the sewerage collection system in the City of New Orleans, creating health and safety issues for both the general public and emergency and recovery personnel working in the city. The efforts by the Sewerage and Water Board of New Orleans (S&WB) in restoring these systems has been critical in making the city ...

  • Case study - Muskegon County - Sewer Force Mains

    Service: Sahara Client: Muskegon County Type of Pipeline: Sewer Force Main Diameter: 66-inch Pipe Material: PCCP Length: 8.5 miles 13.7 km In 2007, Muskegon County’s 35-year old large diameter wastewater force main failed catastrophically. Although historical data demonstrated that joint leakage had never contributed to previous events, extensive failure analysis of ...


    By Pure Technologies

  • Time for a re-examination of sewer design flow criteria

    Each year, many miles of new or rehabilitated sewer lines or pumping stations are designed and constructed based on flow criteria that may be unrelated to the desired level of system performance. Because of the need to reduce the risk of sanitary sewer overflows and sewer backups into buildings, it can be beneficial to re-examine the basis of sewer hydraulic design. Traditional approaches such as ...

  • Delivering an Enhanced Sewer Condition Prioritization Process

    SCREAM™ is a sewer and manhole condition assessment tool developed by CH2MHill. It has been built into Wallingford Software’s InfoNet asset management solution as one of the standard choices for sewer and manhole condition grading. There is emphasis across the collections systems industry worldwide for sewer condition prioritization methods and manhole condition ranking. Although currently the UK ...


    By Innovyze

  • DFW direct bury of storm sewer case study

    Airport Solutions North Texas Contracting has placed the first HOBAS pipe at DFW International Airport in the Dallas/Fort Worth mid-cities. That first installation was a repair to an 84-inch corrugated steel culvert that had failed and created a sink hole approximately 30 feet deep and almost 20 feet in diameter after a series of heavy rains in 2007. North Texas Contracting of Keller, Texas ...


    By Hobas Pipe USA

  • Using InfoNet to manage a planned sewer maintenance program

    OnSite is a framework contractor for Severn Trent Water, one of the ten water service companies of England and Wales. The company is one of the project coordinators for the utility’s planned sewer maintenance programme and one of three framework contractors working in very close collaboration on its CCTV survey and sewer cleansing program. In addition the company undertakes man-entry surveys, ...


    By Innovyze

  • Pipeline infrastructure renewal at Miami-Dade Water & Sewer Department

    Abstract Various governmental, professional and private studies have shown that the replacement costs of underground pipeline infrastructure is excessive and that best practice approaches for infrastructure risk management promote condition assessment programs to understand the actual condition of individual pipe sections in order to best allocate limited capital replacement and ...


    By Pure Technologies

  • Comparison of the inspector and rating protocol uncertainty influence in the condition rating of sewers

    Wastewater drainage systems asset management decisions, in particular regarding rehabilitation interventions, are largely dependent on close-circuit television (CCTV) inspection results. However, the results of CCTV inspections are affected by several sources of uncertainty. Within the present communication, the inspector's uncertainty is quantified by comparing periodic inspection ...


    By IWA Publishing

  • Multivariate probability distribution for sewer system vulnerability assessment under data-limited conditions

    The lack of geometrical and hydraulic information about sewer networks often excludes the adoption of in-deep modeling tools to obtain prioritization strategies for funds management. The present paper describes a novel statistical procedure for defining the prioritization scheme for preventive maintenance strategies based on a small sample of failure data collected by the Sewer Office of the ...


    By IWA Publishing

  • Comprehensive Infrastructure Renewal Program Addresses Aging Water and Sewer Infrastructure in Miami-Dade County

    As industry studies continue to highlight the issues surrounding aging water and sewer infrastructure, policy-makers at the local, state and national level of government are beginning to recognize the problem and make infrastructure renewal programs a priority. One approach that combats the issues surrounding aging water infrastructure is asset management. This approach to infrastructure renewal ...


    By Pure Technologies

  • Process to Estimate Sanitary Sewer Pipe Remaining Life Provides MWWSSB Remedial Decision Information

    ABSTRACTA condition assessment study for the Water Works and Sanitary Sewer Board of the City of Montgomery’s (MWWSSB’s) West Catoma Interceptor (WCI) was conducted in 1998 and 2003. The WCI was evaluated in 1998 using core sampling, closed-circuit television, and manhole (MH) inspections. Approximately 193 MHs and 65,000 linear feet (LF) of pipe were inspected. A subsequent study conducted in ...

  • Comparing the utility of decision trees and support vector machines when planning inspections of linear sewer infrastructure

    Closed-circuit television inspection technology is traditionally used to identify aging sewer pipes requiring rehabilitation. While these inspections provide essential information on the condition of pipes hidden from day-to-day view, they are expensive and often limited to small portions of an entire sewer system. Municipalities may benefit from utilizing predictive analytics to leverage ...


    By IWA Publishing