site safety solution Articles

  • Reduced Emissions for Landfill Gas Installations

    The use of landfill gas as a source of renewable energy is increasing. For environmental and safety reasons, the owners of the waste storage sites have to strictly monitor and control the construction, operations, and emissions generated. Sulzer offers solutions to control these emissions within the limits given by the government. Landfill gas is similar to natural gas, but it is created by ...


    By Sulzer

  • On the right track

    High-speed train manufacturer, CAF, rely on world-class beamforming technology to reduce the noise generated by their trains – helping to make high-speed trains a more viable option for travellers and operators alike. Because of its relatively low levels of CO2 emissions, train travel is considered one of the ...

  • Why Your Project Should Include Articulated Concrete Blocks

    During any construction project, large or small, planning for potential construction erosion is essential. Failing to take into consideration the possibility of erosion when planning a construction site will not only reduce the quality of the soil at the site, but it may also damage surrounding properties, harm the local environment and result in hefty fines and liability costs. To avoid the ...

  • ´More Stations. More Data. Better Forecasts.´ – the NYS Mesonet

    “More Stations. More Data. Better Forecasts.” – that’s the slogan of New York State Mesonet. The weather observation network consists of a total of 125 weather stations all over the state of New York and Lufft was selected as one of the vendors to support them in capturing the data. All 125 of the weathers stations have the standard instrumentation suite. Of those 125, 17 ...

  • Pioneering Primer from Plastics Pipe Institute

    With administrative offices located in Dallas, Texas, The Plastics Pipe Institute Inc. (PPI) is the major trade association representing all segments of the plastics piping industry. PPI members share a common interest in broadening awareness and creating opportunities that expand market share and extend the use of plastics pipe in all its many applications. As an association, PPI focuses ...


    By TRIC Tools Inc.

  • Learn How to Implement a More Effective Emissions Monitoring Strategy with Our Application Note, “The Art of Emissions Monitoring and Sampling: Maintaining Gas Integrity”

    Over the past 15 years, all of us here at E Instruments have used our expertise to design, manufacture, and distribute quality emissions monitoring equipment, air quality monitors, and many other products to clients all over the world. Aside from creating many high-quality and reliable instrumentation solutions, something else we've always ...

  • Comfort and safety

    Type HOFGAS® - Ready/C 300  Commissioning 2004Site Moncorneil (FR) Situation Moncorneil is a medium-sized landfill near Toulouse. A heating boiler is to be operated with landfill gas and the acquired heat is used for leachate treatment. In view of the complete landfill design the customer demands a container construction with remote monitoring of the plant.   ...


    By Hofstetter BV

  • ClorTec™ On-site Disinfection Helps Ensure Safety at British Columbia Water Treatment Facility

    Constructed in 1997, the District of Chetwynd Water Treatment Plant (British Columbia, Canada) treats nearly 2,500 cubic meters of water per day using gas chlorination as its primary form of drinking water disinfection. With recent concerns about the safety of chlorine gas, including potential eye, skin and respiratory irritation and the risk of death with high exposure, the district elected ...


    By De Nora Water Technologies

  • On-Site Chlorine Generation Feasibility Study

     ABSTRACT Gaseous chlorine has been effectively used for disinfection in drinking water and wastewater treatment for decades. While various regulatory programs have placed numerous restrictions on the uses of this chemical due to its hazardous nature, recent focus on the possibility of a terrorist attack at a drinking water or wastewater facility, has underscored the potential hazard ...

  • Global Site Decommissioning - Case Study

    Challenge: A global oil and gas company required final decommissioning at a former terminal and blending facility that had been idle for almost a decade. The 2.5 acre site, located in South Africa, required the removal of all above and below ground structures, underground utilities, process equipment, buildings, concrete slabs and foundations. The objective of ...


    By Antea Group - USA

  • The Daytona Beach Ralph Brennan Water Treatment Plant Finds On-Site Generation to be a Safe and Economical Solution for Water Disinfection

     ABSTRACT For many years the use of gaseous chlorine at water treatment plants has been an effective and widely used method of disinfection. It is still the most commonly used disinfectant treatment in water treatment plants in the United States. In recent years however, the safety of chlorine gas has come under increased scrutiny. The side effects to chlorine gas exposure at low levels ...

  • Weather claims and wind safety

    Anybody working in the construction industry either here in the UK or anywhere else in the world is likely to know that the weather can present us with particular hazards. While rain, ice and snow are particularly dangerous to work in, we must always be aware that the wind is also likely to make conditions unsafe, particularly for those who work at height and those who ...

  • The pied piper of safety

    Many of us remember the story of the Pied Piper, that mythical person who simply played a flute to get all the mice to follow him wherever he wanted them to go. Sometimes it doesn’t take a flute. It just takes a person who is so passionate about their cause that they make others want to follow. I’ve met such a person. His name is David Biderman, whom I respectfully dub the Pied Piper ...


    By Waste Advantage Magazine

  • Safety Training for an Interactive World

    Training is often a hardship for many safety managers. If it is not scheduling conflicts with the trainers, worker illnesses or other untimely and unforeseen situations, often it's training for a multi-language workforce... and let's not forget that costs are always an issue. Company mergers and acquisitions can cause training to be swept 'under the carpet' as well. And whatever the environment, ...


  • Daphne Utilities, Alabama, Enjoys More Than Seven Years of On-Site Sodium Hypochlorite Production from Process Solutions, Inc. Microclor System

    Located along the eastern shore of Mobile Bay, scenic Daphne, Alabama boasts one of the most proactive and progressive utilities in the country. Daphne Utilities which operates the gas, water and wastewater systems for the area’s roughly 20,000 inhabitants has been winning awards for excellence since its founding in 1953. In late 2007, the utility embarked on the design of a new water plant ...

  • Exploring Innovative Solutions

    Progress in environmental management relies on innovation. Whether it's novel applications of new technologies, pioneering public policies, or groundbreaking partnerships – innovation leads to advances. Looking toward tomorrow's advances, the theme of A&WMA's ...


  • Facility siting changes for process plant buildings in the works

    Facility siting identifies hazards that may affect process plant buildings, assesses the potential consequences and leads to the development of a means to manage the risks of these hazards. In short, it is a procedure to make sure process building siting (location, construction and function) is appropriate based on the known hazards (toxic, fire andexplosion) at the facility.Past incidents at ...


    By ABS Consulting

  • Case study - World`s largest remediation site

    Overview Hong Kong's Kai Tak Airport, the world's busiest airport in 1997, became the world's largest remediation site once it was closed. When the airport was decommissioned in 1999 in favor of the new Chek Lap Kok Airport, the government planned to rapidly clean up the site for commercial and residential development. After many years of soil penetration by various ...

  • Innovative approach to unforeseen site conditions – case study

    The Crater Resources Quarry 3 Remediation site was a former limestone quarry that was later used as a disposal site for Waste Ammonia Liquor (WAL) generated by the coke making facility at a steel mill. The WAL contained water, ammonia, and small amounts of various hydrocarbons formed during the coking process. Coking operations shut down by the mid 1980's and discharge into the quarry ceased. The ...

  • IndustrySafe safety software case study

    Introduction IndustrySafe Safety Software is a web-based safety data management solution developed by TRA so organizations can track incidents, corrective actions, OSHA reporting, training, claims, inspections, hazards, behavioral based safety, and more. IndustrySafe clients include leaders in manufacturing, construction, government, and transportation. General ...

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you