  • Transportable Skid Mounted Wastewater Treatment Systems

    Neatport Pty. Ltd trading as Suncoast Waste Water Management is a manufacturing company, producing the Ozzi Kleen range of Sewage Treatment Systems, based on the Sunshine Coast, Queensland AUS. We specialize in transportable skid mounted wastewater treatment systems from 2000 litres to 100,000 litres per day flow capacity which are custom designed in-house for your specific needs. We also ...

  • Skid mounted BWRO Systems, Venezuela

    INTRODUCTION In July 2013, Pure Aqua successfully manufactured and supplied five skid mounted BWRO systems to a major company in Venezuela. The skid mounted BWRO systems came complete with am activated carbon filter for chlorine ...


    By Pure Aqua, Inc.

  • Industrial Skid Mounted Filtration System, USA

    INTRODUCTION In April 2013, Pure Aqua successfully manufactured and supplied to a major wastewater treatment site in the USA with a skid mounted twin alternating multi-media water filtration system to remove suspended solids from well water. The multi-media filtration system comes complete ...


    By Pure Aqua, Inc.

  • Modular treatment system neutralizes process water

    A self-contained pH control and monitoring sys- tem for ready mixed operations yields clean water for recycling or permitted discharge to the environment. Fortrans' Model 5000S uses car- bon dioxide gas to neutralize high-pH process water, offering precise alkalinity monitoring and control of water in pits, settling basins and other containment areas, as it lowers total suspended solids. Designed ...


    By Fortrans, Inc.

  • Temporary sewage treatment plant for Scottish water at Glenluce

    WPL have a range of portable sewage treatment solutions that can be utilised to replace or augment existing sewage treatment plant. The plant range can be hired or purchased. WPL have considered each stage of the sewage treatment process within their portable range. Primary, secondary and tertiary options are available to meet stringent consent conditions. Background In ...


    By WPL Ltd

  • Waste Water Treatment Plant Thunder Valley Casino, CA

    The Waste Water Treatment Plant at the Thunder Valley Casino was in need of a cost effective way to clean out their settling ponds and then process the solids from their new Membrane Bio Reactor (MBR). However, they did not have the space yet for a permanent installation. The ponds needed to be emptied before a building could be constructed for the dewatering equipment. BDP was able to meet the ...


    By BDP Industries

  • Temporary Sewage Treatment Plant for Scottish Water at Glenluce case study

    WPL have a range of portable sewage treatment solutions that can be utilised to replace or augment existing sewage treatment plant. The plant range can be hired or purchased. WPL have considered each stage of the sewage treatment process within their portable range. Primary, secondary and tertiary options are available to meet stringent consent ...


    By WPL Ltd

  • Treatment of Cyanide Bearing Wastewaters

    Water Innovations utilizes a 2-stage Cyanide Oxidation (CN) system that can treat from 2 GPM to 10 GPM. In the first stage of treatment, hypochlorite oxidizes cyanide to cyanate. It consists of two double-wall “Batch” Cyanide Oxidation Tank and an accumulation tank for cyanide-bearing rinse water, each tank equipped with one mixer. Wastewater containing cyanide will be pumped or flow ...


    By Water Innovations, Inc

  • Common Treatment Technologies for Nonhalogenated VOCs

    Soil vapor extraction (SVE), thermal desorption, and incineration are the presumptive remedies for Superfund sites with nonhalogenated VOC-contaminated soil. Because a presumptive remedy is a technology that EPA believes, based upon its past experience, generally will be the most appropriate remedy for a specified type of site, the presumptive remedy approach will accelerate site-specific ...

  • Project profile - Melody Woods Water Company Los Gatos, California iron and manganese treatment system

    Background In February 2009, the Melody Woods Water Company selected and began working with AdEdge Technologies to assist with the design and implementation of a Manganese, Iron and Turbidity treatment system to serve the water supply for Melody Woods in Los Gatos, California. The site has two existing groundwater supply wells that provide drinking water for approximately 53 connections ...

  • Project profile - Ohio Willow Wood Mount Sterling, Ohio 30 GPM arsenic, iron & manganese system

    Background In the winter of 2006 AdEdge Technologies, Inc. was pre-selected to as the treatment vendor to provide a system for arsenic, iron and manganese removal at the Ohio Willow Wood Facility in Mount Sterling, Ohio. To satisfy OEPA requirements, a pilot was installed to verify the effectiveness of the AD26 oxidation / filtration technology to reduce the target contaminants to below ...

  • Case study - City of Montreal upgrade of Atwater and Des Baillets water treatment plants

    Sidestream Venturi Injection—Basin Nozzle Manifold Contacting System. Montreal, Quebec, Canada The Problem: In 2001, a water quality audit revealed that two of the largest drinking water plants in the City of Montreal were out of compliance with Quebec’s latest water quality rules. In response to the audit, the city upgraded the 1,400 MLD Atwater and the ...

  • Project profile - new river elementary – arsenic treatment Phoenix, Arizona

    Background In early 2004, AdEdge was pre-qualified and invited to participate in arsenic pilot study of commercial adsorption-based treatment technologies with Damon S. Williams & Associates (DSWA). As an outcome of the successful piloting and preliminary work with the engineer, AdEdge was chosen by Centennial Contractors to perform full scale arsenic treatment using its granular ...

  • Project profile - City of Wellman, Texas arsenic treatment system

    Background The City of Wellman, Texas (Wellman) applied to the U.S. Environmental Protection Agency (USEPA) to participate in the arsenic treatment demonstration program for Round 2 and was selected. Wellman has five water-supply wells which pump water to a 110,000 gallon storage tank. Water-quality analyses revealed that arsenic concentrations exceeded the new maximum contaminant level ...

  • Project profile - Mettawee Community School - arsenic treatment West Pawlet, Vermont

    Background In the summer of 2004, AdEdge Technologies, Inc. was selected by the Mettawee Community School to supply and install an arsenic treatment system for treating water serving the school and facilities. The elementary school site is located on the west side of the state near the New York border. This was the first system utilizing Granular Ferric Oxide (GFO) adsorption technology ...

  • Project profile - City of Moulton, Texas arsenic, iron, manganese treatment system

    Background AdEdge Technologies Inc. (AdEdge) was selected by the City of Moulton and Hejl, Lee, and Associates (HLA) to design a full-scale arsenic treatment project using its AD26 and Granular Ferric Oxide (GFO) adsorption technology. In addition to designing the system, AdEdge assisted HLA in obtaining a construction permit from the Texas Commission on Environmental Quality (TCEQ) for ...

  • Project profile - quail ridge prescott, AZ arsenic treatment system

    Background The Quail Ridge Community owns and operates the Quail Ridge Community water system located near Prescott, AZ. The water system is served by two wells that provide drinking water for the community’s residents at a maximum of 160 gallons per minute (gpm) with an approximate arsenic concentration of 13 parts per billion (ppb). After a successful pilot, the site was able to ...

  • Project profile - Yucca Mountain project, Nevada arsenic treatment system

    Background Wells J-12 and J-13 are located in Area 25 of the Nevada Test Site near Mercury, Nevada. These wells supply potable water for the Yucca Mountain Project. Water-quality analyses revealed that arsenic concentrations exceeded the new maximum contaminant level (MCL). Before choosing a technology, the site manager, Bechtel SAIC, contracted with Dr. Dennis A. Clifford, ...

  • Project profile - Orchard Highlands USEPA arsenic treatment demonstration Goffstown, New Hampshire

    Background In 2004 AdEdge Technologies Inc. (AdEdge) was selected to implement six fullscale arsenic treatment demonstration projects as part of the USEPA Office of Research and Development arsenic research program (Round 2). These six sites were in addition to three USEPA Round 1 demonstration sites awarded to AdEdge in 2003. The purpose of the research effort is to provide information ...

  • Project profile - USEPA arsenic demonstration project Springfield, Ohio – Chateau estates arsenic and iron treatment system

    Background AdEdge Technologies Inc. (AdEdge) was selected in 2004 by the U.S. EPA and the host site as part of the Round 2 Arsenic Demonstration Program to implement full scale arsenic treatment for the Chateau Estates Mobil Home Community in Springfield, Ohio. The public water system has approximately 230 connections with an average daily flow of 45,000 gallons per day. AdEdge was ...