soil remediation facility Articles

  • Soil and groundwater remediation

    At a site in northern Indiana on behalf of a multinational client, Troy Risk operated a groundwater remediation system to cleanup the source of chlorinated solvent impact to a groundwater aquifer system. Prior to 1988, the site was occupied by a manufacturing facility. In March 1995, chlorinated volatile compounds (CVOCs) were detected pursuant to due diligence for real estate refinancing. From ...


    By Troy Risk, Inc.

  • Eastern Montana - Remediation below operating facility

    Thermal Remediation Services, Inc. (TRS) worked as a subcontractor to Kennedy Jenks Consultants (KJ) to remediate trichloroethene (TCE) in soil during the winter months in Eastern Montana. The project was performed for a firm fixed price based on the TRS standard contract that included installing and operating the ERH system until either the remedial goal was achieved or the design energy was ...


    By TRS Group, Inc.

  • PCE and TCE Remediation at a Dry Cleaning Facility

    Site Summary Subsurface investigations at this operating dry cleaner site revealed elevated levels of PCE and TCE in the site soils and groundwater (perched aquifer). Soil remediation was accomplished via over-excavation in June of 1998. Accelerated bioremediation using HRC was selected to treat the groundwater contamination. The HRC ...


    By Regenesis

  • Soils Radiological Characterization under a Nuclear Facility

    Abstract: Nowadays, nuclear industry is facing a crucial need in establishing radiological characterization for the appraisal and the monitoring of any remediation work. Regarding its experience in this domain, the French Atomic Energy Commission (CEA) of Fontenay-aux-Roses, established an important feedback and developed a sound methodology for radiological characterization. This ...


    By Geovariances

  • TCE remediation at an operating railroad fueling facility glendive, Montana

    TRS Group, Inc. (TRS) worked as a subcontractor to Kennedy Jenks Consultants (KJ) to remediate trichloroethene(TCE) in soil during the winter months in Eastern Montana. The project was performed for a firm fixed price based on the TRS standard contract that included installing and operating the ERH system until either the remedial goal was achieved or the design energy was applied, whichever ...


    By TRS Group, Inc.

  • In-Situ Anaerobic Remediation of Perchlorate-Impacted Soils

    AbstractARCADIS is currently leading the development, evaluation, and selection of a final groundwater remedy for a 94-acre manufacturing facility in the western U.S. This facility has produced small explosives and vehicular safety products since 1957. As a result of historic operations, soil and groundwater at the site have been impacted by perchlorate. To date, remediation efforts have been ...


    By Arcadis

  • The Progression of Remediation

    Environmental remediation involves the cleanup of contaminated ground water and/or soils impacted by a variety of contaminates. The predominate contaminates over the years have been petroleum hydrocarbons from leaking underground storage tanks and surface spills, as well as solvents and other volatile organic compounds (VOCs) from industrial processes. Today, the most effective, practical, and ...


    By EPG Companies Inc.

  • Remediation of methylene chloride in soil and groundwater beneath a former manufacturing facility Northwest Atlanta, GA

    TRS Group, Inc. (TRS), as a subcontractor to MACTEC, Inc. (MACTEC) provided a standard fixed price remediation of methylene chloride (MeCl) and trichloroethene (TCE) in soil and groundwater using Electrical Resistance Heating (ERH) for a confidential client in Northwest Atlanta, GA. Valuable location and large area motivated client to select ERH to provide a rapid and complete remediation for ...


    By TRS Group, Inc.

  • Broadview, IL - Guaranteed TCE remediation under active facility -- Case Study

    Guaranteed remediation of TCE in soil under active vehicle maintanence facility Project Summary TRS Group implemented an electrical resistance heating (ERH) guaranteed remediation with Conestoga Rovers Associates (CRA) to remove trichloroethylene (TCE) under an active vehicle maintenance facility (Site) in Broadview, Illinios, TCE concentrations in soil were ...


    By TRS Group, Inc.

  • Standard Chlorine of Delaware Remediation

    By designing a 70-foot deep barrier wall, Black & Veatch was able to cut off contaminant source areas from a creek near New Castle, Delaware. The groundwater treatment system that Black & Veatch designed prevents site contamination from reaching the underlying drinking water aquifer. The Standard Chlorine of Delaware Site is a 65 acre area including an abandoned chlorobenzene ...


    By Black & Veatch Corporation

  • Shenandoah, VA - DNAPL in clay at active facility - Case Study

    Guaranteed Remediation of TCE and 1,1-DCE in Soil and Bedrock Project Summary TRS Group implemented an electrical resistance heating (ERH) remedy to remove trichloroethylene (TCE) in overburden soil surrounding a former dry well located at a manufacturing facility in Shenandoah, Virginia. TCE soil concentrations were measured at levels that were indicative of separate-phase liquid. Initial ...


    By TRS Group, Inc.

  • Seattle, WA - Active chemical distribution facility - Case Study

    Guaranteed Remediation of TCE and PCE under Active Facility Project Summary TRS Group, Inc. (TRS) working with FLOYD|SNIDER a local Seattle consulting firm, completed a guaranteed fixed price remediation (GFPR) of tetrachloroethene (PCE) and trichloroethene (TCE) in soil at an active bulk chemical warehouse and distribution facility in Seattle, Washington. ...


    By TRS Group, Inc.

  • TerraTherm to Remediate Soils at the Beede Waste Oil Superfund Site - Case Study

    The Beede Site is the former location of a state-licensed and regulated waste oil recycling and disposal facility. The nearly 41-acre Site is located in a residential area of Plaistow, New Hampshire (NH). Operations at the Site began in the 1920s, and continued until the state of NH ordered its closure in 1994. From the 1920s to 1994, thousands of NH residents and businesses were customers of the ...

  • Polishing At An Industrial Facility - Case Study

    SITE OVERVIEW Fuel Storage Area at the Verlite Industrial Facility, Tampa, FL FDEP Site Number: CONTAMINATION Gasoline contaminants in soil and ground water HISTORY -  Leaking Underground Storage Tank (UST) had contaminated an area at the Verlite ...


    By EN Rx

  • Site assessments and remediation case study

    Service(s) performed: Phase I site assessment/soil investigation/soil remediation project for a golf course Summary: Prior to the sale of the golf course property, our experts were engaged to conduct a Phase I Site Assessment. Due to poor management practices, the facility was found to have multiple releases of fuel and waste oil, which were above acceptable ...


    By EFI Global, Inc.

  • TCE Remediation in Saprolite and Bedrock Aquifers

    Site Summary Subsurface investigations at this operating manufacturing facility revealed TCE contamination in saprolite and bedrock aquifers. The complicated site geology created the need for a remedial strategy effective in tight soil and fractured bedrock. Accelerated bioremediation using HRC was selected for a pilot study because its use offered a remedial method that would not interrupt ...


    By Regenesis

  • Electrical Resistance Heating: a Hot New Approach to Soil and Groundwater Remediation

    Electrical Resistance Heating (ERH) is an aggressive remediation technology that can quickly reduce the mass of volatile organic compounds (VOCs) in soil and groundwater by over 99%. The process is often used to clean sites where other technologies have had limited success. Larger ERH sites are cleaned within 6 to 12 months and smaller sites can be cleaned in half that time or ...


    By TRS Group, Inc.

  • TCE Source Area Remediation at a Former Manufacturing Facility Confidential Client – Western Connecticut - Case Study

    Project Summary TRS Group, Inc. (TRS), as a subcontractor to AECOM, completed a Standard Fixed Price Remediation (SFPR) of trichloroethene (TCE) in groundwater in Western Connecticut using Electrical Resistance Heating (ERH). The objective of the ERH project was to achieve the prescribed remediation goal for dissolved TCE in groundwater within the treatment volume. The system ...


    By TRS Group, Inc.

  • PCE and TCE Remediation Continues Years After Injection

    Site Summary Subsurface investigations at this dry cleaning facility revealed elevated levels of PCE and TCE in groundwater and soil. Accelerated bioremediation using HRC was selected for use at the subject site as it offered a groundwater remediation method that would not interrupt on-going facility operations while effectively supporting the degradation of the contaminants. Approximately 250 ...


    By Regenesis

  • Chloroflourocarbon (CFC) remediation case study

    Project Description The Site location was an industrial facility located in the greater South Los Angeles region that manufactured chemicals for local petrochemical and other industrial operations from 1919 through late 1990’s. Refrigerants were initially produced in 1964 including chlorofluorocarbons (CFCs) and hydrochlorofluorocarbons (HCFCs) such as trichlorofluoromethane (R-11), ...

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you