split case Articles

  • Nexen Golden Eagle: 30kg per sq/m saved in offshore living quarters - Case Study

    More than 3 tonnes of weight saved Aluminium floor system used in LQ module Cost savings compared to stainless steel options Time savings from simple installation Alphastrut was awarded a contract via Sembmarine in Lowestoft to design and supply an aluminium raised access flooring system for parts of the offshore living quarters (LQ) module for Nexen’s ...


    By Alphastrut Ltd

  • Ottawa Installs 16 inch Bionax Case Study

    The Cardinal Creek Village project in Ottawa marked the first time that the City of Ottawa used 16-inch (400mm) Bionax PVCO (molecularly oriented polyvinyl chloride) pipe from IPEX. “Ottawa is one of our largest markets, so it was a pretty big deal,” explained Perry Crozier, Ontario Municipal Representative. ...


    By IPEX, Inc.

  • Delivering automation to test stations - Case Study

    CeraMem Corporation is a developer of metal oxide gas concentration sensors in Waltham, MA. Their test engineers required mass flow controllers that were easy to intregrate and calibrate. They also demanded fast response and high accuracy in order to reduce test cycle length and improve the quality of the data. Test station requirements demanded that controllers were capable of adjusting ratios ...


    By Sierra Instruments, Inc.

  • Still the first choice in recycling equipment - Case Study

    Recycling areas: Cable Company name: Recycables SAS Located: Noyalles-Godault, France Founded: 2008 Employees: 35 In 2008, Nexans recycled almost 22 000 tons of cable manufacturing waste from its European and African sites, as well as several thousand tons of scrap ...


    By Eldan Recycling A/S

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you