stainless steel sewage pump Articles

  • STP Stockholm - Case Study

    The order for renovating three screw pumps is not remarkable, but the location of Danviken Pump station however is unique: in a cave in the middle of the city of Stockholm, near the Royal Palace and City Hall. Landustrie installed three screw pumps with a diameter of 2.60 meter. Screw length 9.9 m - capacity 9720 m3/h - power 160 kW. The screw pumps are supplied with eco-friendy ...


    By Landustrie Sneek BV

  • What is The Difference Between Submersible and Immersible Pumps?

    These terms can often be confused though the distinction is fairly obvious. Submersible pumps are complete units, including the motor, and the whole can be totally submerged whereas immersible pumps are mounted in vertical position with the motor above the liquid and the pump end extended below the liquid level. ...


    By Crest Pumps Ltd.

  • Local company T-T, is a `grand design` case study

    Onneley based T-T Pumps with their diverse capabilities and products were selected to supply the pumping system for the Grand Designs project which will be aired on Wednesday 28th September 2011. Incorporated in the restorations of the rusting and rotten hulk of an old lifeboat station in Tenby, the company and its team supplied and commissioned a system to deal with the buildings wastewater. ...


    By T-T Pumps Ltd.

  • Case study - Flowmeter troubleshooting at the township of North Glengarry - Case Study

    The Problem... The forcemain meter at the pump station read five times higher than the open channel flowmeter at the lagoon 2 km away. The Township needed to determine which of the two flow meters was reading incorrectly. Troubleshooting Forcemain Flow... First step was to evaluate performance of the 12” magmeter at the sewage pump station. The cost ...


    By Greyline Instruments Inc.

  • Portable Monitoring Instruments Solve Flow Rate Mystery - Case Study

    The Glen Walter Sewage Collection System was built to service 1080 customers in 1989. At the time the population was 850 but by 1995 the sewage treatment plant had already reached capacity. Shawn Killoran took over the Operations Manger position in 1999 and, along with the Mayor and Council, he immediately had concerns about the excess flow. The Township started by video taping all of the lines ...


    By Greyline Instruments Inc.

  • Case study - Water accountability portable monitoring instruments solve flow rate mystery - Case Study

    The Glen Walter Sewage Collection System was built to service 1080 customers in 1989. At the time the population was 850 but by 1995 the sewage treatment plant had already reached capacity. Shawn Killoran took over the Operations Manger position in 1999 and, along with the Mayor and Council, he immediately had concerns about the excess flow. The Township started by video taping all of the lines ...


    By Greyline Instruments Inc.

  • Aquaflow to the rescue case study

    Aquaflow a division of T-T PUMPS Ltd are always prepared to leave their comfort-zone to deliver solutions that exceed expectations! Belle Greve Pumping Station is undergoing an upgrade to prolong its lifespan, work started in 2008 and it is crucial to the island's future sewage management programme. Aquaflow were approached by the principal contractor working on behalf of Guernsey Water, ...


    By T-T Pumps Ltd.

  • Lowara plays key role in Ashgabat 2017 games

    Ashgabat in Turkmenistan is set to be the home of the fifth Asian Indoor and Martial Arts games in 2017. Construction teams are working hard to meet the fast approaching deadline of this multi-phase project, with phase two and three nearing completion. Totaling over 1,466 square meters, the multi-purpose sports facility, comprising 30 venues, is positioned at the heart of Turkmenistan’s ...


    By LOWARA - a Xylem brand

  • Case study: How to purify Hexavalent Chrome Wastewater

    We all talk about priority pollutants, about hazardous substances and discharge to the atmosphere etc. which are dangerous for our environmental. Day by day we adopt new laws and regulations to protect our green future. So, what is that “priority pollutants”? Priority pollutants are highly toxic chemicals. The list of these chemicals is quite large and includes thousands of items but ...


    By GlobeCore GmbH

  • WPL supplies Farne Salmon and Trout with a substantial new effluent treatment plant

    A new effluent treatment plant designed by WPL is ensuring that Farne Salmon and Trout Ltd in Berwickshire - one of Europe's largest smoked salmon facilities - complies with tighter local trade effluent discharge regulations, whilst significantly reducing its sewer discharge costs. WPL worked with Farne and Scottish Water from an early stage to design and supply a substantial, energy efficient ...


    By WPL Ltd

  • Seal-Record in Essen, DE. case study

    The largest main collector within the jurisdiction of the Public Utility Company Essen has a nominal diameter of DN 3800. This main collectortown centre presented damages thatwere in need of redevelopment. After a thorough inspection, 33 leaky joints were selected for this pilot project and the company SMG Bautenschutztechnik fur Hoch und Tiefbau GmbH received the order. Project ...


    By AMEX GmbH

  • WPL supplies Farne Salmon and Trout with a substantial new effluent treatment plant case study

    A new effluent treatment plant designed by WPL is ensuring that Farne Salmon and Trout Ltd in Berwickshire - one of Europe's largest smoked salmon facilities - complies with tighter local trade effluent discharge regulations, whilst significantly reducing its sewer discharge costs. WPL worked with Farne and Scottish Water from an early stage to design ...


    By WPL Ltd

  • A look at some contaminants regulated in drinking water

    The U.S. Environmental Protection Agency regulates just over 90 contaminants in public drinking water systems. They include manmade chemicals as well as naturally occurring contaminants from rocks and soil. A look at some of the contaminants that fall under federal or state regulations: ARSENIC: Enters drinking water through eroding natural deposits in the ground or mining and other ...


    By Associated Press

  • At Goulds Water Technology, business means family and family means business - Case Study

    When Seabury S. Gould founded his pump company in the mid-1800s, he knew he had a good thing going. He believed in the material and the design, and he was proud to be the man behind fresh flowing water for the pioneers opening the West, the farmers in the East and the plantations down South. What Gould didn’t know, and ...

  • Fine screens help New Jersey wastewater treatment plant stop rag and grease problems

    A few years ago the Hammonton Wastewater Treatment Plant, located in the lush green countryside of southern New Jersey, faced continuous problems with rags, trash and plastics passing right through a rusty old bar screen and into the oxidation ditch and final clarifier.After years spent unclogging pumps, clearing out trash and untangling the UV system – plant managers decided to find a better ...

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you