temporary hardness removal Articles
-
ENEL power, italy – torrevaldaliga project – ZLD plant for FGD wastewater treatment
The Facility The Torrevaldaliga Nord Power Plant is being converted (torn down and rebuilt) to three coalfired units each of 660 Mwe capacity. The plant is equipped with fabric filters for flue gas dust removal, DeNOx system (for flue gas denitrification), FGD systems for sulphur oxides removal. The FGD system is equipped with a common wet limestone milling, three limestonegypsum forced ...
-
ENEL power, italy – la spezia project – ZLD plant for FGD wastewater treatment
The Facility The La Spezia Power Plant is equipped with 1 x 600 MW coal-fired power unit and 2 x 350 MWe gas-fired combined cycle power units for a total of 1300 MWe. The unit normally fires imported coal with < 1% Sulphur. The flue gases are treated sequentially by FGD absorber. It is equipped with a 1 x 100% DeSOx lines with an absorber. The blow down from the absorber, along with other ...
-
Offshore oil spill clean up case study
In the event of a major incident occurring offshore, for example a tanker casualty running aground or breaking up for any reason, it is of paramount importance to deploy emergency response to protect and save human life. Once this has been done an assessment of the casualty should be made on whether it is possible to salvage the vessel and its contents and to assess the type and amount of oil ...
Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you