turnkey biogas Articles

  • Royal Brewery, Manchester turnkey wastewater plant

    Scottish and Newcastle UK Wastewater 95 m3/hr COD 4450 mg/l SS 830 mg/l The Client Scottish & Newcastle UK (S&N) are a beer-led drinks business, operating in the international brewing sector; they currently rank number seven by volume sales in the world's top ten brewers. S&N have ...


  • ERigene 200m3 Biogas Storage

    French anaerobic digestion specialists ERigene are a turnkey supplier of complete AD systems, both biogas production and value-added usage. The ERibox system can comprise any number of modular AD units that are delivered to site. They are factory built hook-lift boxes and are connected together to run automatically, with the added peace of mind of remote monitoring. If more capacity is required, ...


    By Base Structures Ltd

  • AD and Biogas Technology Developments in UK

    The anaerobic Digestion and Biogas Association’s fourth annual trade show and conference — UK AD & Biogas 2013 — attracted a busy stream of visitors to Birmingham, England in early July, demonstrating a growing interest in this vibrant industry sector. The event included facility tours, conference sessions, workshops, free one-on-one consultations with industry experts, ...


    By BioCycle Magazine

  • Biogas Plant in Verneuil, Dairy Cooperative - Case Study

    In 2014, the dairy cooperative of Lochoise region, has awarded Clarke Energy the installation of a cogeneration module on its anaerobic digestion site, located at Verneuil-sur-Indre in Indre et Loire. The biogas plant which was established in 2014, consumes discharges from milk production, the wastewater treatment ...


    By Clarke Energy

  • Thoeni, Allens Farm Biogas Installation - Case Study

    Allens Farm anaerobic digestion (AD) facility is located within the beautiful countryside of Colchester, which is said to be the oldest recorded town in Great Britain. The farm is run by three partners – David Hunter, Charlie Lochore and Will Lochore, who felt ...


    By Clarke Energy

  • Idex Environnement’s Biogas plant at Amiens - Case Study

    The Anaerobic Digestion (AD) plant in Amiens is operated by Idex Environment. The biogas is derived from the municipal solid waste (MSW) originating from the local area. Clarke Energy has delivered a full turnkey installation for this site, creating renewable energy. The engines supplied for this project are two JGMC ...


    By Clarke Energy

  • Queensland Urban Utilities Upgrades Flood Damaged Site - Case Study

    Adelaide, Australia: Clarke Energy has been commissioned by Queensland Urban Utilities (QUU) to supply two sewage treatment plants (STPs) with new sewage gascogeneration units in Brisbane. Clarke Energy assisting Queensland ...


    By Clarke Energy

  • Adwest Technologies flameless retox rto oxidizers with acid gas scrubbers for cost effective voc & odor abatement

    Adwest Technologies, Inc. provides cost effective Flameless Regenerative Thermal Oxidizers (RTO) with acid gas scrubber systems for cost effective VOC and odor abatement from malodorous VOC processes including food processing, rendering, petfood, biopharma spray dryer, bakery oven, composites, foundry, biogas, sludge dryers and waste water treatment plants (WWTP) off gas applications.  ...

  • Gatineau Sewage Treatment Plant, Gatineau, Quebec, Canada

    Project No. 1 Industrial Boiler Application A FLU-ACE waste heat recovery system installed to process all flue gases from three boilers. The system recovers up to 3.5 mmBTU/h of waste heat which is re-used for heating the digester sludge. The main fuel for the boilers is recycled methane based sewage gas generated from the plant’s anaerobic digesters. 'The installation ...

  • St. John’s college, Oxford - case study

    St John’s College, Oxford, will reap substantial financial and environmental benefits from sustainable low-cost technology, supplied by the company ENER-G— heat pump solutions provider. The 500-student college – established in 1555 – is among educational institutions across the country that are taking advantage of low cost, renewable ground source energy for heating, ...


    By ENER-G

  • East Midlands airport, UK - case study

    Every year East Midlands Airport (EMA) connects 5 million passengers to over 100 travel destinations around the globe. The airport has won a number of prestigious travel awards including the World’s Leading Eco Friendly Airport in 2007. EMA contacted ENER-G regarding the provision of a sustainable solution to provide heating and cooling for their New Departures Pier. After an initial ...


    By ENER-G

  • Sherwood Energy Village - case study

    Local community project harnesses heat pump technology to build a sustainable future. Sherwood Energy Village (SEV) is a former colliery site in the East Midlands. In 1994 following the colliery’s closure the local community tasked itself with bringing sustainable development into the mainstream. ENER-G’s low cost sustainable heat pump technologies provided the SEV with a local ...


    By ENER-G

  • Malvern Community Hospital, Worcestershire - case study

    ENER-G delivered a solution that combines two low carbon technologies – a ground source heat pump system and a combined heat and power (CHP) unit - as part of the eco-friendly design brief set by Interserve, which was contracted by Worcestershire Primary Care Trust to build the £17.7 million new hospital. The 24-bed hospital will utilise renewable geothermal energy for heating, ...


    By ENER-G

  • Bolivar wastewater treatment plant cogeneration facility to be Installed by Clarke Energy - Case Study

    The Bolivar Wastewater Treatment Plant (WWTP) is the largest wastewater treatment plant in the Adelaide region, processing almost 70% of Adelaide’s metropolitan wastewater. The South Australian Government has approved a $25.8 ...


    By Clarke Energy

  • Redhill Primary School - case study

    Reducing energy costs and shrinking carbon footprint without compromising on comfort When it came to choosing the right heating and cooling solution for Redhill Primary School, Worcestershire County Council wanted a sustainable alternative to the less environmentally friendly methods of oil or gas. ENER-G Sustainable Technologies (EST) delivered a full turnkey solution from thermal conductivity ...


    By ENER-G

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you