turnkey remediation Articles

  • Case study - Mobile remediation system

    OVERVIEW A large consulting and contracting firm owns and operates several ex-situ Thermal Desorption Units (TDUs). Each single-load Thermal Desorption Unit has the capacity of desorbing 15 tons of soil per hour at a temperature of 400°F - 900°F. These Thermal Desorber Units have been designed to operate on both chlorinated and non-chlorinated RCRA, CERCLA, and private industry ...

  • Superfund Remediation: The Key to Land Reuse Case Study

    The technology is ready and, with state and federal tax credits waiting, the economics look better than ever: New Jersey, one of the first states to be industrialized, finds itself plagued with the contaminated aftermath of pre-EPA industries: soil contamination. From superfund sites to the gas station whose underground storage tank has been oozing for the last 20 years, every ...


    By CR Clean Air Group, LLC

  • Site Closure Strategies: Reducing Remediation Liabilities & Costs

    Industrial companies face the daunting task of managing investigations and clean-ups at thousands of contaminated properties. In staying abreast of new technology and ever-evolving regulatory programs, companies must address many challenges involving regulations, technologies, and expenses. To successfully manage the costs and risks for each project, it is important to: 1) Focus on the ultimate ...


    By AECOM

  • Application Guide for Thermal Desorption Systems

    EXECUTIVE SUMMARY Systematic guidance information on various currently available thermal desorption systems is not readily available. The purpose of this Application Guide is to provide (1) technical information on, design and performance characteristics, cost, associated regulatory compliance issues, and contracting strategies for deploying thermal desorption systems, and (2) to establish a ...

  • In-Transit Sludge - Odor Control

    Products & Equipment Used: Pneumatic Foam Unit NT/5 (ELECTRIC) AC-904 (BLACK) Long Duration Foam AC-905 (RED) Long Duration Foam Application Summary: The Lynn (MA) Water and Sewer Commission's (LWSC) incinerator, dedicated for burning sewage sludge, was shut down because of emissions that exceeded regulatory limits. LWSC ...


    By Rusmar Inc.

  • Integrated Site Closure Achieves Business and Regulatory Goals

    A new concept for cleanup of contaminated properties and hazardous waste sites applicable under federal and state regulatory programs is helping clients achieve both business and regulatory goals at their sites. The concept, called 'Integrated Site Closure', is the seamless integration and delivery of services necessary to reach regulatory closure of contaminated properties. Regulatory closure ...


    By AECOM

  • Former Raritan Arsenal

    Edison, New Jersey, USA Project Bioremediation of TNT & DNT in Homogenized Soil Summary DARAMEND® bioremediation technology was applied at pilot scale to approximately 100 tons of soil from the former Raritan Arsenal in Edison, New Jersey. Area 4 at the Raritan Arsenal was formerly used as a high explosives salvage and melt-out area from World War I ...


  • No Place Is Too Far

    The remote location of hydropower stations is often a great challenge when major repair work is necessary. The refurbishment of a large generator in the Scottish Highlands shows how Sulzer finds cost-effective service solutions even in places miles from nowhere. Much of the UK hydroelectric capacity was built during the 1950s. These installations have performed extremely well, especially ...


    By Sulzer

  • New Holland, Inc. Dramatically cuts coolant waste with UF

    Challenge Agricultural manufacturer needs to reduce the volume of wasewater build-ups and reduce disposal costs of spent coolant. Customer New Holland, Inc. Industry Agriculture Product Hyde Ultra Mini-Ultrafiltration System Business Benefits Realized ...


    By PRAB, Inc

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you