turnkey waste gas Articles

  • Turnkey Manufacturer & Supplier of Large scale Waste Plastic & Tire Pyrolysis Plant Machinery

    We establish large scale pyrolysis plants on turnkey basis. The total turnkey supply includes of machinery designing & simulation, equipment manufacturing, supply, installation, commissioning, technology transfer and operational training. We are one of the prominent leaders in establishing pyrolysis plants on turnkey basis.   Advantages of pyrolysis plants manufactured & ...

  • Allweiler pumps in exhaust gas treatment systems in ships

    As environmental regulations become more stringent, waste gas treatment systems are growing in importance. H+H Umwelt- und Industrietechnik GmbH of central Germany has been using Allweiler progressing cavity pumps as a core component of these systems since 2003. The company has been manufacturing catalytic waste gas treatment systems since 1998. Originally they focused on applications in block ...


    By ALLWEILER GmbH

  • Case study - JJO wood waste – biomass

    A UK leading producer of kitchens and bathroom furniture invest in the future of no costs for the disposal of wood waste and no oil or gas bills for heating of the total company site premises. J J O PLC – manufacturer of Colonial Kitchens, Colonial Bedrooms, eco Kitchens and eco Bathrooms. Founded over 100 years ago and now the leading supplier to many of the best outlets within the ...


    By Mawera (UK) Ltd

  • Total solution: Gas and particulate analysis in Cement industry

    Cement plants are increasingly required to install continuous emission monitoring systems (CEMS). While these represent a significant financial outlay, a range of other factors also need to be considered when selecting a suitable CEMS. To the inexperienced, selecting a suitable CEM can mistakenly be considered as simply ensuring that the applicable national regulations (eg MACT in the USA, ...


    By Environnement S.A

  • Global solution: Gas and particulate analysis in Cement industry

    Cement plants are increasingly required to install continuous emission monitoring systems (CEMS). While these represent a significant financial outlay, a range of other factors also need to be considered when selecting a suitable CEMS. To the inexperienced, selecting a suitable CEM can mistakenly be considered as simply ensuring that the applicable national regulations (eg MACT in the USA, ...


    By Environnement S.A

  • Rectify dry cycling of gas boilers and reduce energy costs by 25%

    Building engineers, energy and facilities managers tend to overlook that many gas boilers waste energy through dry cycling when they are not actively contributing to the building heating and hot water demand. It is often thought that existing building management systems (BMS) and building energy management systems (BEMS) are optimising the boilers to remove dry cycling. However, the BMS is ...


    By Vital Efficienci Ltd.

  • Adwest Technologies flameless retox rto oxidizers with acid gas scrubbers for cost effective voc & odor abatement

    Adwest Technologies, Inc. provides cost effective Flameless Regenerative Thermal Oxidizers (RTO) with acid gas scrubber systems for cost effective VOC and odor abatement from malodorous VOC processes including food processing, rendering, petfood, biopharma spray dryer, bakery oven, composites, foundry, biogas, sludge dryers and waste water treatment plants (WWTP) off gas applications.  ...

  • Thoeni, Allens Farm Biogas Installation - Case Study

    Allens Farm anaerobic digestion (AD) facility is located within the beautiful countryside of Colchester, which is said to be the oldest recorded town in Great Britain. The farm is run by three partners – David Hunter, Charlie Lochore and Will Lochore, who felt ...


    By Clarke Energy

  • Biomass fired thermal oil heater case study

    This 12 MWth output Biomass Power Plant is one of the turnkey products of Biomass Power. The plant was fully commissioned in December 2006. The system has a capacity of 12 MW thermal output producing up to 10MWth of 300°C 10 Barg pressure hot oil, up to 10 tonnes per hour of steam and 2 MWth of 200°C hot air. This is all achieved from one grate heating three separate heat exchanges. The ...


    By Biomass Power Limited (BPL)

  • Idex Environnement’s Biogas plant at Amiens - Case Study

    The Anaerobic Digestion (AD) plant in Amiens is operated by Idex Environment. The biogas is derived from the municipal solid waste (MSW) originating from the local area. Clarke Energy has delivered a full turnkey installation for this site, creating renewable energy. The engines supplied for this project are two JGMC ...


    By Clarke Energy

  • 4.5 MWe Refuse Derived Fuel to Energy Plant Case Study

    This 4.5 MWe Biomass Power Plant is one of the turnkey products of Biomass Power. The plant has a capacity of 24 MW thermal and rated at 4.5 MWe producing 35,476MWh of green electricity per year, 100% of which is exported to the grid. The fuel used is segregated biomass from a commercial and industrial waste collection business. The fuel is produced by removing some of the recyclable material ...


    By Biomass Power Limited (BPL)

  • Gatineau Sewage Treatment Plant, Gatineau, Quebec, Canada

    Project No. 1 Industrial Boiler Application A FLU-ACE waste heat recovery system installed to process all flue gases from three boilers. The system recovers up to 3.5 mmBTU/h of waste heat which is re-used for heating the digester sludge. The main fuel for the boilers is recycled methane based sewage gas generated from the plant’s anaerobic digesters. 'The installation ...

  • High-temperature air pollution control technology

    Based on 35 years’ experience working for the environment, French company Maguin has developed the Cercat filter for high temperature air pollution control. David Gambier describes the technology and its potential use in the glassmaking industry.Maguin has been present in the waste thermal treatment field since the 1970s, offering customers innovative and state-of-the-art concepts. The company’s ...

  • Demkolec ICGCC power plant

    Evaporator/Crystallizer meets stringent zero-discharge waste requirements In 1989, Demkolec B.V. was founded by the Dutch Power Authority N.V., S.E.P., to execute the first integrated coal gasification combined cycle (ICGCC) power plant. For the gasification process, Demkolec selected Shell. The plant, the world’s largest, is located next to the existing Maascentrale power station ...

  • The pebble bed modular reactor, desalination challenges and options

    The Pebble Bed Modular Reactor (PBMR) is a development lead by Eskom, the South African state power utility. The technology used is based on the previous German HTGR work linked to a direct cycle gas turbine (or Breyton Cycle) being developed in conjunction with Mitsubishi Heavy Industry. The initial commercial plant design has a thermal output of 400 MW with an electrical output (nett) of over ...


    By Inderscience Publishers

  • Water contamination problems solved at automobile air bag manufacturing plant

    The Facility Based in a Rocky Mountain state, this facility produces the sodium azide pellets contained inside the air bags for automobiles produced throughout the world. The Problem During the manufacturing of the air bag propellent, frequent equipment washdowns produce large volumes of wastewater that contain sodium azide and metal sulfide salts. Sodium ...

  • Plasma gasification: Harnessing the power of lightning

    Plasma gasification is both a high-tech solution to the problem of waste management and a source of renewable power. The technology has great potential, but can it move from the fringes to the mainstream? The name "plasma gasification" conjures up images of men in lab coats late at night, investigating a far-flung corner of science that is light years away from commercial readiness. In reality it ...


  • Queensland Urban Utilities Upgrades Flood Damaged Site - Case Study

    Adelaide, Australia: Clarke Energy has been commissioned by Queensland Urban Utilities (QUU) to supply two sewage treatment plants (STPs) with new sewage gascogeneration units in Brisbane. Clarke Energy assisting Queensland ...


    By Clarke Energy

  • Efficiency Bonus From Ford’s Emission-Beating Ovens

    EFFICIENCY BONUS FROM FORD’S EMISSION-BEATING OVENS When Ford decided it was time to refurbish and upgrade two primer ovens and systems at its Dagenham plant in Essex, UK, the company looked to the future. Against a worldwide background of rising concern over environmental issues and pollution, Ford decided to make use of the opportunity to reduce VOC emissions. They aimed for a system ...


  • Malvern Community Hospital, Worcestershire - case study

    ENER-G delivered a solution that combines two low carbon technologies – a ground source heat pump system and a combined heat and power (CHP) unit - as part of the eco-friendly design brief set by Interserve, which was contracted by Worcestershire Primary Care Trust to build the £17.7 million new hospital. The 24-bed hospital will utilise renewable geothermal energy for heating, ...


    By ENER-G

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you