twin screw pump Articles

  • Case study - Heat-to-power application using a Dreyer & Bosse CHP power unit with an internal combustion engine

    Location: Trechwitz, Germany Site Gross Power Output Range 500kWe + 30-35kWe from ElectraTherm ORC Thermal Heat Input Range:  375-450kWt Hot Water Input Range:  90-95°C (118-203°F) Hot Water Flow Range:  39 m3/hour (172 GPM) Ambient Temperature: 0-15°C (32-59°F) Date Commissioned: Q2 2012 ElectraTherm installed a Green Machine in Germany at a ...


    By ElectraTherm

  • Case study - Heat-to-power application using a Dreyer & Bosse CHP power unit with an internal combustion engine

    Location: Trechwitz, Germany Site Gross Power Output Range 500kWe + 30-35kWe from ElectraTherm ORC Thermal Heat Input Range:  375-450kWt Hot Water Input Range:  90-95°C (118-203°F) Hot Water Flow Range:  39 m3/hour (172 GPM) Ambient Temperature: 0-15°C (32-59°F) ElectraTherm installed a Green Machine in Germany at a biogas power generation ...


    By ElectraTherm

  • Case study - fuel-free power from solar thermal

    Middle East Technical University Campus, North Cyprus, Turkey Application Type: Solar Thermal Nominal Power Output: 18kW Thermal Heat Input: 200 - 400kW Hot Water Input Range: 170 - 225°F Hot Water Flow: 185 GPM Cold Water Input: 80-100°F Cold Water Flow: 220 GPM Date Commissioned: Q4 2010 Middle East Technical University Northern Cyprus Campus ...


    By ElectraTherm

  • Case study - Solar thermal In Louisiana

    Solar Thermal/ORC Application in the USA Site Location: Crowley, LA, United States Thermal Power Available: Up to 650 kWt Green Machine Gross Power Output Avg: 15-50 kWe Hot Water Input Range: 65-120°C Water Cooling Tower: Up to 600 kWt ElectraTherm partnered with its gulf coast distributor, Gulf Coast Green Energy, to commission a Green Machine for a project sponsored by ...


    By ElectraTherm

  • Case study - Green Machine generates power from waste heat at biogas facility in the Czech Republic

    Biogas/Heat-to-Power Application on Two MWM Internal Combustion Engines Site: Brno, Czech Rep. Engine Max Power: 980kWe (currently limited to 900 kWe) Green Machine Gross Power Output Avg:  32-39 kWe Thermal Input to the Green Machine: 375-500kWt Hot Water Input Range: 86 - 92°C Hot Water Flow: 35 m3/hour Ambient Temperature: 0-25°C Date Commissioned: Q2 ...


    By ElectraTherm

  • Green machine generates power from waste heat at biogas facility in the Czech Republic

    Biogas/Heat-to-Power Application on Two MWM Internal Combustion Engines Site: Brno, Czech Rep. Engine Max Power: 980kWe (currently limited to 900 kWe) Green Machine Gross Power Output Avg:  32-39 kWe Thermal Input to the Green Machine: 375-500kWt Hot Water Input Range: 86 - 92°C Hot Water Flow: 35 m3/hour Ambient Temperature: 0-25°C ElectraTherm’s ...


    By ElectraTherm

  • Organic Rankine Cycle (ORC)

    Biogas/Heat-to-Power Application using a Dreyer & Bosse CHP power unit Location: Trechwitz, Germany Site Gross Power Output Range 500Kwe + 30-35kWe from Electratherm ORC Thermal Heat Input Range: ?375-450kWt   Hot Water Input Range:? 90-95°C ...

  • Energy efficiency: la Compagnie des Fromages counts on innovation with Emerson technologies

    The subsidiary of the Bongrain Group is pursuing a policy to reduce its energy usage and CO2 emissions by investing in a facility designed by Cofely Axima, a leader in industrial refrigeration and a subsidiary of GDF Suez. This solution stands out for its use of a process that heats and cools within a single cycle and its use of key components supplied by the Emerson Group – a Vilter ...

  • Case study - ElectraTherm green machine installed at biogas plant in Austria

    Biogas/Heat-to-Power Application on a GE Jenbacher 312 Location: Inning, Austria Gross Power Output Range: 18 - 32kWe Thermal Heat Input Range: 260 - 450kWt  Hot Water Input Range:  180°F (82°C) – 200°F (93°C) Hot Water Flow Range: 50 -130 GPM (3.15 – 8.21 l/s) Date Commissioned: Q1 2012 ElectraTherm installed its first Green ...


    By ElectraTherm

  • Case study - Nottinghamshire Recycling

    DUO Equipment delivered and installed a new full washing and water management plant for Nottinghamshire Recycling Ltd (NRL). Based in Worksop, Nottinghamshire, NRL is a sustainable waste solution provider processing C & D waste, green waste, wood and recycled aggregates. The new washing and water management plant (which includes a Gennaretti centrifuge system) will provide NRL with the ...


    By DUO (Europe) plc

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you