utility locating Articles

  • Utility locating at a Gasoline station case study

    As part of an Phase II Environmental Site Assessment at a gasoline station, GeoView was tasked with locating and mapping the  utilities within the boundaries of the property. The utilities included electrical lines, communication lines, PVC and metal water lines, sewer lines and fiberglass fuel lines. The property did not have any as-builts to reference. As standard procedure, GeoView ...


    By GeoView, Inc.

  • Scanning proposed borehole locations for Utilities case study

    Environmental and engineering firms often are tasked with performing soil borings for monitor well installation as part of a Phase II Environmental Site Assessment. This task becomes more challenging when the borings are to be installed in gasoline stations, right of ways or other areas where there are numerous underground utilities that are either unmarked or not properly located. GeoView can ...


    By GeoView, Inc.

  • Utility Locating and Mapping at a Power plant case study

    An expansion was planned at a power plant in west central Florida. As part of the design build plan, all of the utilities within the proposed building footprint had to be located and mapped. There were two phases of the investigation. Utility designation was the first phase. This involved studying existing as-builts, performing site walkthroughs with plant personnel in order to ascertain a ...


    By GeoView, Inc.

  • DESMI Pumps for HVAC in Sharjah, UAE - Case Study

    DESMI has supplied a series of eight NSLH End Suction Centrifugal Pumps for the Umm Al-Qura building located in Sharjah at the Al Mamzar beach. The NSLH pumps will be providing 198 differently sized apartments with cooling. The residential building has 22 floors + 5 floors for car ...


    By DESMI A/S

  • Low energy mixing to optimize anaerobic digestion at the Kitchener WWTP

    The existing Kitchener Wastewater Treatment Plant (WWTP) is a conventional secondary treatment facility, with a rated capacity of 122,745 mVd. The plant is comprised of two separate secondary treatment plants (Plant 1 and Plant 2) served by a common headworks facilities and primary clarifier facilities. Plant 1 was constructed in the early 1960s and Plant 2 was constructed in the mid-1970s. Both ...

  • How to achieve triple bottom line sustainability benefits on airport runway projects

    CH2M delivers best-in-class sustainable approaches for airport clients worldwide by constantly seeking opportunities to apply sustainable development and design concepts. From planning through plowing, CH2M is leading the development of the most sustainable runway projects in the U.S. Through our life-cycle approach, airport clients have experienced significant benefits such as ...


    By CH2M Hill Companies, Ltd.

  • What Is Zero Liquid Discharge and How Does It Work?

    Not every industrial facility that produces wastewater will require zero liquid discharge (ZLD). It is usually looked to as a last resort because it can be a complex process that requires a high initial investment. If a facility is located on a site that has severe water scarcity issues and/or astronomical discharge fees, it might be ...


    By SAMCO Technologies, Inc.

  • Locating pipes and cables case study

    GPR can be used to determine the location and depth of metallic, non-metallic, plastic, concrete and asbestos-concrete utilities, and cables (power, signal, etc.) Locating of  City Utilities The VIY3-300 GPR was used for locating of city utilities (water, gas, sewer, etc.). This profile shows city utilities at a depth of 1.2 and 2.0 meters (wave speed is 130 meters per ...


    By Transient Technologies LLC

  • Utilizing a Multiple Metal Detector Array for Locating Anomalies Indicative of Ferrous and Non-Ferrous OE/UXO

    ABSTRACT An array of three Geonics Limited EM61-MK2 metal detectors was utilized to identify subsurface metallic anomalies at the Mare Island Naval Shipyard in Vallejo, California. The goal of the 120-acre survey was to locate anomalies indicative of ferrous and nonferrous ordnance and explosives/unexploded ordnance (OE/UXO) in dredge pond berms with particular attention to 20 mm high explosive ...


    By Weston Solutions, Inc

  • Locate buried monitoring wells case study

    A Phase II Environmental Site Investigation was being conducted at a gasoline station in Fort Myers, Florida. In order to minimize costs, our client intended to use several existing on-site monitoring wells rather than installing new wells. However, five of the existing wells had been covered with asphalt and were no longer visible. GeoView was tasked with performing a shallow geophysical study ...


    By GeoView, Inc.

  • The Cost Reduction Locator: Four Steps to Measurable Results!

    Interview Offering – Learning Why not take a Gift that Keeps on Coming The gift of Repeat Benefits of: The Cost Reduction Locator: Four Steps to Measurable Results! The Four Steps to Measurable Results are as follows: 1.) Data Collection 2.) Analysis 3.) Identify/Recommend Solutions 4.) Execute Solutions & specify/document Measurable Results ...

  • Case study - Spindle utilities module

    Business Situation The existing method of tracking utility usage at these industrial laundries was highly manual, unreliable, and time consuming. Total utility consumption from bills was entered into large spreadsheets and analyzed over periods that were often 3 months or more in arrears. The report merely told managers what they already knew—they had overspent on natural gas; ...


    By Dober Chemical Corp

  • Biostyr, Wigan WwTW , united utilities

    The Client United Utilities (UU) are the 2nd largest water company in England/Wales. They are responsible for an area in the north west of the UK, which includes major cities such as Manchester and Liverpool. Wigan WwTW is located north west of Manchester near Parbold in Lancashire. As part of the AMP4 strategy Wigan underwent an overall redevelopment and upgrade including the ...


  • Truss Structures Utilized at School Expansion

    Truss Bridges help Berkeley Preparatory School Expansion Tampa, Florida - Founded in 1960, Berkeley Preparatory School is a private school consisting of 1,250 students, from Pre-K through 12th grade. It is located on ...

  • Case study - Complete Utilities, Gloucestershire

    Material Source: Excavation and trenching waste from the utilities industries. Equipment Installed: Powerscreen Commander 1400 Feeder, Powerscreen Aggwash, DUO Mobile Water Treatment System (inc. centrifuge, clarified water tank, sludge tank and low-level thickener. Project Requirements: Complete Utilities required a washing and ...


    By DUO (Europe) plc

  • The utility of the future? Think shopping mall

    The energy world is about to turn upside down. With the coming of smart grid, the electricity consumer becomes the electricity seller; the passive home appliance becomes the active energy manager; the grid repairman becomes the grid itself. Such an upheaval means that the energy world needs to start thinking about a new business model, says a recent report by IBM Global Business Services Energy ...

  • Dallas water utilities - Case Study

    Integrity Municipal Systems Restores Eight Lime Slakers for the Bachman Water Treatment Plant in Dallas, TX: Almost $1M Saved Compared to New Systems Dallas Water Utilities (DWU) provides approximately one billion gallons per day of clean drinking water to more than 1.2 million residents from three processing facilities. Reliability is vital to DWU and its customers. To ensure ...


    By Integrity Municipal Systems

  • Case study - Acid Containment – Utilities Inc.

    Location: N/A Project Contractor: F.S.I., Inc of Fort Myers System Applied: Polyurea Poly Vers LC25, PolyVers VT40 Substrate / Area: Acid Containment Date Completed: January 2007 Project Description The acid containment’s existing RoboLiner was failing. The RoboLiner was removed and hydro blasted to ...

  • Spring Creek Utilities, Nevada - Case Study

    In June 2011, AdEdge Water Technologies was contacted by Sunrise Engineering to design, manufacture, and startup an arsenic removal system for the Spring Creek Utilities Company located in Elko, Nevada. The existing water system consisted of three wells feeding into a centralized distribution system with a maximum capacity of 1950 gpm and serves a population of 1500 residents. The AdEdge ...

  • California utility chooses HERO / crystallizer for ZLD

    The Facility The Magnolia Power Project is utilizing state-of-the-art combined-cycle electric generation technology and being built on four acres of Burbank Water and Power’s (BWP) generation station complex adjacent to Magnolia Boulevard in Burbank. Aker Kvaerner is serving as the Magnolia Power Project engineering, equipment procurement and construction contractor, and has been ...