utility locating Articles

  • Different Methods of Groundwater Remediation

    Groundwater remediation is essential in a wide range of businesses, from drinking water extraction to mining. It’s hugely important to have the best water treatment system in place to help. Here are a few different methods that are used in water remediation that you may need to incorporate into your plan. Physical Remediation Water purification starts on a ...

  • Utility locating at a Gasoline station case study

    As part of an Phase II Environmental Site Assessment at a gasoline station, GeoView was tasked with locating and mapping the  utilities within the boundaries of the property. The utilities included electrical lines, communication lines, PVC and metal water lines, sewer lines and fiberglass fuel lines. The property did not have any as-builts to reference. As standard procedure, GeoView ...


    By GeoView, Inc.

  • Scanning proposed borehole locations for Utilities case study

    Environmental and engineering firms often are tasked with performing soil borings for monitor well installation as part of a Phase II Environmental Site Assessment. This task becomes more challenging when the borings are to be installed in gasoline stations, right of ways or other areas where there are numerous underground utilities that are either unmarked or not properly located. GeoView can ...


    By GeoView, Inc.

  • Utility Locating and Mapping at a Power plant case study

    An expansion was planned at a power plant in west central Florida. As part of the design build plan, all of the utilities within the proposed building footprint had to be located and mapped. There were two phases of the investigation. Utility designation was the first phase. This involved studying existing as-builts, performing site walkthroughs with plant personnel in order to ascertain a ...


    By GeoView, Inc.

  • CPI Installs RTO at Tire Manufacturer

    Catalytic Products International (CPI) recently completed the installation of a new TRITON Series Regenerative Thermal Oxidizer (RTO) at the Northeast USA location of a global automotive tire manufacturer for the abatement of Volatile Organic Compounds ...

  • Mind the bandgap | A temperature profiling technology comparison

    When it comes down to determining temperature in environmental media, there are many options—from fiber-optic to infrared sensing technologies—to observe and quantify the relative kinetic energy of a material. For single point data acquisition and a given specific temperature range and target medium, of course certain technologies are more optimal than others.  When it comes to ...


    By BeadedStream

  • Locating pipes and cables case study

    GPR can be used to determine the location and depth of metallic, non-metallic, plastic, concrete and asbestos-concrete utilities, and cables (power, signal, etc.) Locating of  City Utilities The VIY3-300 GPR was used for locating of city utilities (water, gas, sewer, etc.). This profile shows city utilities at a depth of 1.2 and 2.0 meters (wave speed is 130 meters per ...


    By Transient Technologies LLC

  • Utilizing a Multiple Metal Detector Array for Locating Anomalies Indicative of Ferrous and Non-Ferrous OE/UXO

    ABSTRACT An array of three Geonics Limited EM61-MK2 metal detectors was utilized to identify subsurface metallic anomalies at the Mare Island Naval Shipyard in Vallejo, California. The goal of the 120-acre survey was to locate anomalies indicative of ferrous and nonferrous ordnance and explosives/unexploded ordnance (OE/UXO) in dredge pond berms with particular attention to 20 mm high explosive ...


    By Weston Solutions, Inc

  • Locate buried monitoring wells case study

    A Phase II Environmental Site Investigation was being conducted at a gasoline station in Fort Myers, Florida. In order to minimize costs, our client intended to use several existing on-site monitoring wells rather than installing new wells. However, five of the existing wells had been covered with asphalt and were no longer visible. GeoView was tasked with performing a shallow geophysical study ...


    By GeoView, Inc.

  • The Cost Reduction Locator: Four Steps to Measurable Results!

    Interview Offering – Learning Why not take a Gift that Keeps on Coming The gift of Repeat Benefits of: The Cost Reduction Locator: Four Steps to Measurable Results! The Four Steps to Measurable Results are as follows: 1.) Data Collection 2.) Analysis 3.) Identify/Recommend Solutions 4.) Execute Solutions & specify/document Measurable Results ...


  • Hazardous Location LEDs in Chemical Manufacturing Facilities

    Employees inside chemical manufacturing plants are exposed to some of the most unforgiving work conditions in the industrial sector. This is because in such environments, workers are exposed to extreme temperatures, dust, volatile chemicals and invisible, explosive gases. Common protection methods against explosive risks include containment, segregation and prevention. Out of all the ...


    By Larson Electronics LLC

  • Case study - Spindle utilities module

    Business Situation The existing method of tracking utility usage at these industrial laundries was highly manual, unreliable, and time consuming. Total utility consumption from bills was entered into large spreadsheets and analyzed over periods that were often 3 months or more in arrears. The report merely told managers what they already knew—they had overspent on natural gas; ...


    By Dober Chemical Corp

  • Biostyr, Wigan WwTW , united utilities

    The Client United Utilities (UU) are the 2nd largest water company in England/Wales. They are responsible for an area in the north west of the UK, which includes major cities such as Manchester and Liverpool. Wigan WwTW is located north west of Manchester near Parbold in Lancashire. As part of the AMP4 strategy Wigan underwent an overall redevelopment and upgrade including the ...


  • Case study - Complete Utilities, Gloucestershire

    Material Source: Excavation and trenching waste from the utilities industries. Equipment Installed: Powerscreen Commander 1400 Feeder, Powerscreen Aggwash, DUO Mobile Water Treatment System (inc. centrifuge, clarified water tank, sludge tank and low-level thickener. Project Requirements: Complete Utilities required a washing and ...


    By DUO (Europe) plc

  • Case study - Utility Ltd – Ukraine

    Customer Utility Ltd is the leading glass recycling company in Ukraine, with more than 70% of recycled glass production countrywide. The company is producing high quality glass cullet for its partners in Ukraine, Russia, Moldova and Belarus. Requirements The sorting task is to separate three main colors of cullet – flint, green and amber ...

  • Dallas water utilities - Case Study

    Integrity Municipal Systems Restores Eight Lime Slakers for the Bachman Water Treatment Plant in Dallas, TX: Almost $1M Saved Compared to New Systems Dallas Water Utilities (DWU) provides approximately one billion gallons per day of clean drinking water to more than 1.2 million residents from three processing facilities. Reliability is vital to DWU and its customers. To ensure ...

  • Truss Structures Utilized at School Expansion

    Truss Bridges help Berkeley Preparatory School Expansion Tampa, Florida - Founded in 1960, Berkeley Preparatory School is a private school consisting of 1,250 students, from Pre-K through 12th grade. It is located on ...

  • Case study - Acid Containment – Utilities Inc.

    Location: N/A Project Contractor: F.S.I., Inc of Fort Myers System Applied: Polyurea Poly Vers LC25, PolyVers VT40 Substrate / Area: Acid Containment Date Completed: January 2007 Project Description The acid containment’s existing RoboLiner was failing. The RoboLiner was removed and hydro blasted to ...

  • Case study - Lee County Water Utilities (LCWU)

    Location: Fort MYers, FL System Applied: PW1010 – Visuron Technologies, Inc. Substrate / Area: Metal tank primary containment Date Completed: July 2002 Project Description Lee County Water Utilities (LCWU) needed to re-coat launderer in their clarifier. The multiply layer of paint was failing after 1 year of resurfacing. Polyurea ...

  • Case study - Dallas Water Utilities - Electromagnetic Inspection

    Service: Electromagnetic Inspection Client: Dallas Water Utilities (DWU) Department of Public Works Project Date: May 2009 Type of Pipeline: Water Main Diameter: 72-inch Pipe Material: PCCP Length: 2.95 miles Results: 6 pipe sections with wires broken The 72-inch Simpson Stuart Supply Main, owned and operated by City of Dallas, Dallas Water Utilities (DWU) is a ...

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you