wall penstock Articles

  • Permanent Multipath Clamp-On Transit Time Flow Meter

    For many years now, ultrasonic flow measurements with "wetted" sensors have been a well established procedure to measure discharge in big pipes in the field of hydro power plants. A lot of research studies show that very precise measuring results can be achieved, under the provision of correct application and consideration of diverse ancillary conditions. Depending on the flow conditions and the ...

    By HydroVision GmbH

  • Kijlstra leaves the competition high and dry on flood alleviation scheme

    Kijsltra provides precast drainage solution For some people, the widespread floods of summer 2007 were a foretaste of the kind of natural disaster that results from man-made climate change. For many in the water industry, it was also a stark reminder of how urgently we need to upgrade our water infrastructure. One of those areas worst hit by the 2007 floods was Wakefield, West ...

    By Kijlstra LTD.

  • Kijlstra precast units speed up Kingsnorth development

    Pre-cast concrete headwalls by specialist drainage manufacturer Kijlstra have helped civil engineering contractor Volker Fitzpatrick minimise costs and reduce construction times on a business park development in Kent. The Kingsnorth Commercial Park, a 115 acre greenfield site on the Isle of Grain, is being developed by property firm Goodman to provide up to 2 million sq ft of industrial and ...

    By Kijlstra LTD.

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you