Maine Embraces Fiberight’s Waste Processing Technology
The Coastal Resources of Maine (CRM) facility is the practical application of over a decade of work by Fiberight scientists and engineers to design, build, test and deliver municipal solid waste processing solutions that meet current market demands to increase recycling rates, achieve complete utilization of organics and lower carbon outputs. This new facility, currently under construction in ...
-
K R Bakes (Small Scale Restaurant) - Case Study
Need: Small scale restaurant and has very less space to spare for waste processing Around 50 Kg food waste to be converted daily Challenge: Space constrain Waste segregation was required for almost all other waste processing machines Man power issues for segregating organic waste No smell should come from the machine as customers will be sitting nearby Solution: We gave our ...
-
Incinerators as part of ‘Cradle to Grave’ waste process
Bio Hazardous Medical Waste – Indonesia Your bio-hazardous medical waste can create long term cost and serious environmental outcomes. Acute medical waste issues require immediate and accurate response to avoid spread of infection. Fact. The abundance of untreated medical waste quickly escalates into a threat to humanity and the Inciner8 medical product range provides a precise ...
-
Incinerators as part of `Cradle to Grave` waste process
Bio Hazardous Medical Waste – Indonesia Your bio-hazardous medical waste can create long term cost and serious environmental outcomes. Acute medical waste issues require immediate and accurate response to avoid spread of infection. Fact. The abundance of untreated medical waste quickly escalates into a threat to humanity and the Inciner8 medical product range provides a precise solution ...
-
Asset Builders (Apartment) - Case Study
Need: Apartment which is already using a bacteria based machine and looking for a replacement Bacteria based machine was making too much smell, and was facing service issue Also when water content was more the bacteria would die so they needed to add more bacteria in that case Around 50 Kg food waste to be converted daily Challenge: Space constrain Waste segregation was required for ...
-
Wet dust collection for Solid waste processing - Case study
Wet Dust Collection for Solid Waste Processing Whirl Wet Dust Collector System chosen by waste management firm. A company specializing in waste management services, recycling, and de-packaging solutions specified a Model H Whirl Wet Dust Collector System to capture dusts from solid waste processing. Whirl Wet captures 99.0% of particles 10.0 micron in size and 98% of particles 5.0 micron and ...
-
Fragrant Nature Munnar (Hill Station Resort) - Case Study
Need: Around 250 Kg food waste to be converted daily They had only around 50 sqft of area in which food waste converter machine needed to be set up Resort is set up on top of a hill so temperature may drop at any time As temperature drops bacteria based machines will function slow Challenge: The resort was on top of a hill and the installation area was very small for any 250 kg ...
-
Shanghai - Organic Waste Treatment Plant - Case Study
Organic waste mainly includes kitchen waste?food waste and garden waste. Organic waste treatment process currently has the grim situation of the complex design and environmental control of production plant due to it has perishable and odorous characteristics. Comparing the organic waste treatment process waste characteristics between China and Europe, JONO adopts MBT processing and coprocessing ...
-
Chongqing - Organic Waste Treatment Plant - Case Study
Organic waste mainly includes kitchen waste?food waste and garden waste. Organic waste treatment process currently has the grim situation of the complex design and environmental control of production plant due to it has perishable and odorous characteristics. Comparing the organic waste treatment process waste characteristics between China and Europe, JONO adopts MBT processing and coprocessing ...
-
Huzhou Organic Waste Treatment Plant - Case Study
Organic waste mainly includes kitchen waste?food waste and garden waste. Organic waste treatment process currently has the grim situation of the complex design and environmental control of production plant due to it has perishable and odorous characteristics. Comparing the organic waste treatment process waste characteristics between China and Europe, JONO adopts MBT processing and coprocessing ...
-
A hierarchical open-pit mine production scheduling optimisation model
A hierarchical open-pit mine production scheduling methodology linking the optimal strategic open pit mine plan to the optimal medium-term production schedule is presented. The main objective of this paper is to develop, implement, and verify a mathematical programming framework for the optimal medium-term open-pit mine production scheduling using Mixed Integer Linear Programming (MILP). The ...
-
Axion waste processing plant training case study 2 – Operators team at mbt plant
Challenge: The recovery system was a unique and complex MBT and AD plant. Individual equipment suppliers were not able to provide training in the combined waste recovery system as an overall integrated process. Machinery was not yet operational so separation stages could not be seen working. Many of the trainees had not worked within the waste industry before. Demonstration of competence ...
By Axion Group
-
Axion waste processing plant training case study 1 – Management team at MBT plant
The full recovery system was a unique and complex MBT and AD plant. Individual equipment suppliers were not able to provide training in the combined waste recovery system as an overall integrated process. Machinery was not yet operational so separation stages could not be seen working. The new management team was a complex mixture of people, recently recruited from different backgrounds and ...
By Axion Group
-
Construction and demolition waste processing in Athens, Greece: a pilot demonstration
Construction and Demolition Wastes (CDWs) constitute a waste fraction, which is quantitatively at least as high as municipal solid waste in Greece and other countries. This paper presents the current situation on CDW management in Greece and focuses on the results from the operation of a pilot processing plant. CDW was collected from construction crews at several demolition sites, which included: ...
-
Increase revenue with a CK horizontal baler
CK International horizontal balers allow waste recyclers to increase the volume of waste processed, with throughputs up to 3tonnes/hour being achieved. The generous hopper size of the horizontal balers allow large volumes of waste to be fed with a loading shovel or grab type loader. Customers are baling a wide range of materials including cardboard, plastic film, hard plastic and shredded paper. ...
-
Acrylonitrile Tower Cleaning & Degassing - Case History
Background: A chemical plant had an Acrylonitrile Tower that was plugged with crystallized acrylonitrile. There were also "chunks" of this material throughout the tower. Additionally, 4-5 inches of sludge material was at the bottom of the tower. An Industrial Services Company was required to remove these "chunks", as well as to remove all traces of acrylonitrile vapor prior to entry being ...
-
Axion waste processing plant training case study 4 – New operators on an established plastics recycling plant
Training a team of new operators on an established waste polymer processing plant following extensive modifications to the process. Challenge: Not all of the new machinery had been installed. The separation and refining equipment used complex processing techniques not widely used in the sector. The trainees were new recruits with no prior knowledge of the process Axion approach: ...
By Axion Group
-
How to Maximize Your Profits - The Liberation Process and the Definition of a Zero Waste Processing System
In today’s business of tire recycling we are constantly being driven to new challenges to develop processes that will maximize profits and leave the least amount of waste by-product for our landfills. The ability to separate or “liberate” tire wire from steel in the cleanest form possible, is achieved by the introduction of the new CM 2 Rotor Liberator. Due to the enormous ...
-
Waste Disposal Companies: Providing Efficient Sewage and Waste Processing
When your business needs to dispose of sewage water and waste materials, waste disposal companies provide specialized services designed to remove waste efficiently. At Aqua-Zyme, we provide liquid waste dewatering services that separate waste solids for disposal and send the excess water to be treated in local ...
-
Water management miracle
Eighteen months ago, the Townsends plant in Pittsboro, N.C., was placed in a very difficult position. The plant was severely handicapped from a lack of water and its ability to dispose of its waste process water; therefore, the plant wasn’t processing as many birds as Townsends wanted. Many plant employees feared their plant would close. “It had been an escalating problem, especially ...