well drilling service Articles

  • Raw material cycle: from chip to briquette to product - Case Study

    Thanks to their briquetting system from RUF Frischhut can redeploy production scrap and melt it again Ludwig Frischhut GmbH and Co. KG have closed the circle on their raw material cycle by utilising a briquetting press from RUF: cast chips produced during the machining of parts for water supply and sewage disposal are pressed to solid briquettes and then melted in the in-house foundry and ...

  • How to Deal with Drilling Waste

    At present, environmental protection is a basic state policy in China, and it has been a strategic mission and goal for our country to maintain a sustainable development of society, economy and environment. Along with the continuous improvement of environmental laws and the increasing environmental awareness among people, the departments concerned have successively enacted various environmental ...


  • Modeling emissions from offshore drilling

    To regulate drilling activities proposed by oil and gas companies in the oil-rich Gulf of Mexico (GOM), governing agencies require the submittal and approval of certain plan documents before drilling activities can be initiated. For drilling activities in the Western GOM, these plans typically consist of one of the following: EP, or Exploration Plan – required to conduct ...


    By Trinity Consultants

  • A new approach to drilling waste management – prevention!

    Grangemouth based Surface Active Solutions (SAS) has developed its microemulsion based technology to aid the prevention and management of drilling waste. The many activities surrounding the removal of drilling mud in surface and downhole cleaning applications usually generate significant volumes of oil contaminated drilling waste. The drilling mud is typically removed through the use of solvents ...

  • Acoustiblok® Quiets Well Motor Noise for California Water District

    Acoustiblok recently resolved a noisy well motor issue that was affecting some nearby residents for Three Valleys Municipal Water District (Three Valleys MWD) in California. Ben Peralta, a Three Valleys MWD engineer working on the project said, “The new Acoustiblok All Weather Sound Panels perform better than the old ...


    By Acoustiblok International

  • Directional drill resale values and how to get the most for your rig

    Wide resale value disparity among brands There’s a lot to consider when purchasing or leasing a horizontal directional drill — features, durability, support, training and overall value. But one area often overlooked is the potential resale value of the unit. Too often contractors will overlook the potential value of the machine after its useful life in their ...


    By Vermeer

  • Customized Drilling Waste Hi-G Dryer Shipped to North Africa

    Along with large scale application of KOSUN drilling waste management equipment in North Africa market, establishment of two after-sales service centers respectively in Egypt and Algeria and four-year strategic cooperation with a local partner, KOSUN drilling waste management equipment has been well accepted by customers in North Africa. Now there are 12 KOSUN ...


  • Wellbore Cleanup | Casing Cleaning | Well Completion - Surface Active Solutions Product Data Sheet

    SAS116SC Product Data Sheet: Wellbore Cleanup | Casing Cleaning | Well Completion SAS wellbore cleanup chemicals are designed specifically to help service companies reduce cleaning times, minimizing operational downtimes for operators and maximizing production from drilling sites. ...

  • Getting ahead of the Caribou - pitdry process—innovative solidification solution for spent drilling fluids

    An oil company has been producing oil and gas in British Columbia’s Southern Foothills since 1992. The operator has continuously invested in the area and recently opened up new gas producing wells northwest of Fort St John, the largest city in the northeast region of British Columbia. The new wells are situated 4,600 feet above sea level in a rigid mountain terrain. The viable way to connect the ...


    By CETCO Energy Services

  • Companies and people leading the restructured environmental services industry in Canada

    The landscape of environmental service providers in Canada has changed dramatically in the past four or five years, especially with mergers and acquisitions announced in recent months between some fast-growing businesses. Only a decade ago the industry was dominated by a couple of publicly-traded continental companies that gobbled up numerous small and medium-size enterprises to offer customers a ...

  • Russia`s growing interest in HARDBANDING

    The OilTec Division of Castolin Eutectic, world experts in wear protection of drilling equipment and tools, presented key solutions to drilling contractors, service and production companies at the 12th Moscow International Exhibition “Oil and Gas” / “MIOGE 2013”. The event took place in Moscow on 25 – 28 June 2013. We demonstrated our solutions ...


    By Castolin Eutectic

  • Sonic Rigs Rescue Surrey School Installation

    TR3 Geological Services, based in Abbotsford, BC, Canada, won a tender to install a geothermal grid during the summer of 2009, under what would be Woodward Hill Elementary School’s brand new, all-weather soccer field in Surrey. “Geothermal is a good idea for new schools as well as retrofitting old schools,” said Bill Fitzgerald, general manager of Sonic Drilling, the ...


    By Sonic Drill Corporation

  • GeoSmart bags multi-loop and pump handler

    GeoSmart Energy has acquired a time-saving multi-loop and pump handler designed for geothermal drilling. The GeoSmart Push'N Pull simplifies the installation of geothermal pipes in vertical drill applications, saving time, money and manual labour. "Geothermal drillers will appreciate its'push'factor for inserting pipe while water well drillers will love its 'pull' factor for extracting pumps ...

  • Case Study - Baker Hughes, Inc.

    Baker Hughes Inc. (BHI) is a global oilfield service company with operations in over 90 countries. They provide advanced products and services to help customers drill, evaluate, complete and produce oil and gas wells. BHI also provides reservoir engineering and other consulting services. In 2007, BHI retained the services of E2 to help develop an EHS management information system (EHS MIS) design ...


    By E2 ManageTech

  • Landfill groundwater monitoring network design and construction quality assurance (CQA)

    The site is an active landfill site situated in the north east of England.  The company managing the site was unhappy with the groundwater monitoring infrastructure around the site margins. ESI Ltd was commissioned to advise on locating and designing ten groundwater monitoring wells.  Following agreement with the Environment Agency, we also provided independent construction quality ...

  • Saving Time, Money And The Environment Through Chemistry - Case Study

    Since 1990, KEM-TRON Technologies Inc. (KEM-TRON) has been providing sophisticated solids control and dewatering products to customers around the world. In doing so, KEM-TRON has developed a unique set of core competencies that have made us a service leader in separation technology. By combining expertise in both dewatering polymers and solid/liquid separation technologies, KEM-TRON has developed ...


    By Elgin Separation Solutions

  • Pumps for new housing in Stockholm

    Grindex new series of dewatering pumps are designed to last three times longer in abrasive applications compared to previous pump generations. In this case study from Sweden, they are up for a tough test. One of the critical factors for the building of 3,000 new homes within a few years are the seven submersible dewatering pumps from Grindex installed deep in the bedrock below south Stockholm. ...


    By Grindex Pumps

  • Trends in plug and abandonment cost in the Gulf of Mexico, 2002?2007

    Wells are drilled to explore for, delineate and produce hydrocarbon reservoirs. At the end of their useful life, wellbores are permanently abandoned in a process known as Plugging and Abandonment (P&A). The purpose of P&A is to prevent the migration of fluids from the wellbore and establish a permanent barrier to the existing geologic formation. In this paper, we assess trends in P&A costs in the ...


    By Inderscience Publishers

  • Case Study - 28 MW Dual-Flash Power Plant

    Brady Hot Springs, Nevada, USA – 1992 GDA was a partial owner in this successful project and was responsible for exploration and development of the resource. As Manager of Wellfield Development, GDA recommended the comprehensive wellfield development plan, formulated the exploration program, supervised surface geological mapping and geophysical surveys for siting production and injection ...

  • Fearless flow back - treating completion fluids & acid flow backs

    An oil company completed a well and CETCO Oilfield Services was there to treat the flow back fluids. During the flow back, it was necessary for the oil company to continue normal drilling operations. Deck space on the structure was at a premium for the oil company, who simultaneously continued drilling while flow back fluids were being treated. CETCO Oilfield Services’ proven technology and ...


    By CETCO Energy Services

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you