wetwell Articles

  • Municipal waste water treatment plant case study

    A municipal WWTP in the North of England was experiencing significant problems with accumulations of FOG in the Wetwell at the head of the treatment plant. The FOG would form a solid cap over the well several feet thick. This put considerable strain on the pumping gear, interrupted the performance of the float switches and required regular manual intervention from the staff. High costs were also ...

    By Cleveland Biotech Ltd.

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you