Lucas County Port Authority Case Study

0

Courtesy of Environmental Remediation Contractor

Jeep Parkway – Toledo, Ohio

Treated the soil in situ down to 20 feet. Removal of several unknown concrete structures, removal and disposal of more than 4,000 tons of PAH and heavy metal contaminated soil, collected over 200 soil samples and water samples, and moved 7,000 cubic yards of onsite borrow to fill and cap the area.