ENTA Treatment Systems Engineering Contracting LTD

Maritas Textile – Case Study

0

Project Name
Maritas Textile Wastewater Treatment Plant

Employer
Maritas Textile

Contractor
Enta Muhendislik Antma Taah. San. Ve Tic. Ltd. Sti.

Location of the plant
KAHRAMANMARAS/ TURKEY

Scope of work
Industrial Wastewater Treatment Plant

Contract Date
2012

Completion Date
2013

Flowrate of the plant: 2.200 m3/day:

Inlet Pollution Parameters:
COD: HOOmg/L:
BOD: 450 mg/LI
PH: 9-10
OIL & GREASE: 31 mg/ L
TEMPERATURE: 10-30°C:

Outlet Discharge Values:
COD: 350mg/L
PH: 6-9
OILS. GREASE: 10 mg/ L

Units of the Plant:

Physical Treatment

  • Static Screen

Chemical Treatment

  • Coagulation Basin
  • Flocculation Basin
  • Sedimentation Basin

Biological Treatment

  • Aeration Basin with Blower and Diffuser System
  • Sedimentation Basin

Sludge Dewatering

  • Sludge Thickening Tank
  • Filter Pres