The Problem

BHP required the pathways around their Mine Plants to have a firm, level, well-draining surface to keep the workers out of the mud in periods of wet weather.

The Solution

  • The area was levelled
  • Diamond Grids were laid
  • Diamond Grids were filled with 12mm gravel.