Mississauga Case Study (In Situ Gas Thermal Remediation (GTR™))

0

Courtesy of GEO Inc

In Situ Thermal Desorption in conjunction with soil vapor extraction was used to remove volatile organic compounds which contaminated the groundwater and saturated soil areas of a former metal fabricating facility in Ontario, Canada. The site had VOCs detected above the Canadian water standard in various monitoring well locations. 

The remediation goal was achieved in 84 days and saw a 98% reduction in groundwater contaminants. 

Geology: Silty Clay, Silt 