Naqshbandi Industries Ltd – Case Study

0

Project Name
Naqshbandi Industries LTD.
Wastewater Treatment Plant

Employer
Naqshbandi Industries LTD.

Contractor
Enta Miihendislik Aritma Taah. San. Ve Tic. Ltd. Sti.

Location of the plant
KARACHI/ PAKISTAN

Scope of work
Industrial Wastewater Treatment Plant

Contract Date
2012

Completion Date
2013

Flowrate of the plant: 1.600 m3/ day

Units of the Plant:

  • Physical Treatment
  • Screening

Chemical Treatment

  • Coagulation Basin
  • Neutralization Basin
  • Flocculation Basin
  • Chemical Sedimentation Basin

Biological Treatment

  • Aeration Basin with Blower and Diffuser System
  • Sedimentation Basin

Sludge Dewatering

  • Sludge Tank
  • Sludge Dewatering Unit with Decanter