Nashville airport dredging case study

0

Courtesy of Liquid Waste Technology LLC (LWT LLC)

Project Sponsor:Metropolitan Nashville Airport Authority

Application: Clean and dredge waste water treatment plant for airport runoff (from runway tarmac)

Dredge Used: LWT RCLPE Runt Dredge (Remote Control Lagoon Pumper Electric)

Project Summary: Automated remote control dredge with rail system to cover the entire pond without an operator and Bottom Sense™ (automated system to detect and protect lagoon bottom) to protect the plastic liner of the pond.

Customer comments

No comments were found for Nashville airport dredging case study. Be the first to comment!