Courtesy of Fortis Wind Energy

Project: Water Treatment Solution
Product scope: System design, supply of equipment , commissioning of 5 systems by Fortis Wind Energy & Independent Energy The Netherlands

Project: Off-Grid Hybrid Systems in Thailand
In February 2015 “Fortis Wind Energy” & “Independent Energy” from The Netherlands together with our hardware distributor and automation partner in Thailand we completed 5 (five) Hybrid Systems of 32 kWp each in the province Ayutthaya, Thailand. The Hybrid Systems are used for water treatment.

System configuration:

Each system is set up by:

  • 120 x solar modules monocrystalline of 255 Wp
  • 1 x Fortis Passaat (1,4 kW) wind turbine on 18 m monopole tower
  • 3 x SMA STP inverter of 10 kW
  • 3 x SMA Sunny Island type 6.0H
  • 1x Battery Bank of 24 cells of 2 Volt type PVS4940
  • 1x AC & DC distribution cabinet

Other equipment like motors, controllers timers are delivered and installed by our partner. Including all civil works, design of frames for solar modules, wind turbine foundation & tube tower plus cabling connection for all driving motors.