Plant re-design, procurement and installation of novel machinery case study

0

Courtesy of Axion Group - Axion Consulting

Challenge:

  • Granulator equipment underperforming.
  • Low throughput and poor particle size control.

Axion Solution:

  • Axion redesigned plant layout to incorporate novel screening machinery and oversize material recycling loop.
  • Specified, procured and installed the processing equipment.
  • Commissioned and tested on-site.

Results & Performance:

  • Production throughput increased by 50%.
  • Tighter size distribution allows improved separation and purity in downstream process.

Customer comments

No comments were found for Plant re-design, procurement and installation of novel machinery case study. Be the first to comment!