Re-location and re-design of non-ferrous separation plant case study

0

Courtesy of Axion Group - Axion Consulting

Challenge:

  • Old plant using eddy current separators for non-ferrous waste.
  • System was underperforming and needed to be moved.

Axion Solution:

  • Axion redesigned new plant layout using existing ECS units and adding one reconditioned unit.
  • Plant rebuilt using 35% scrap materials.
  • On-site performance tests conducted.
  • Plant optimised for performance and efficiency.

Results & Performance:

  • 3% improvement in metal purity.
  • 3% increase in recovery rate.
  • Throughput doubled.

Customer comments

No comments were found for Re-location and re-design of non-ferrous separation plant case study. Be the first to comment!