Receptory site in Kemi - Case study
Conclusions of thermal treatment:
- High capacity (40-80t/h) allows reasonable time schedules in bigger projects
- Post treatment monitoring is minimal
- Versatility of the method allows high variation of the contamination level and compounds in the input material
- The method is quite insentive of the moisture and soil type of the input material
- The space requirement is low (40m*60m)
- Comparison of the total costs to other treatment methods, make thermal treatment very attractive alternative
- Emission control and mass balance are easy to make
-