ERC was hired as the General Contractor to stabilize and realign the North Fork Licking River immediately upstream from a rail road bridge. The project required clearing, grubbing, excavation and regrading of the existing point bars to realign the river thalweg. To stabilize the banks we installed j-hooks, flexamat, turf reinforcement matting, erosion control blanket with seed and plantings. We installed a bypass channel and pumping system to lower the water table during construction.

Environmental Remediation Contractor is a force for nature. We are a contractor created to serve the environmental and civil contracting industry centered around soil and water quality. We have a stellar team with decades of experience offering the very best in project estimating, field execution, and project management to allow for on time, and on budget, safe results.

Customer comments

No comments were found for River Stabilization & Realignment- Case Study. Be the first to comment!