SBR Package system

0
- By:

Courtesy of Premier Tech Aqua

Québec has important water resources. Hydro-Québec, a leader in the field of sustainable development, exploits and develops this collective heritage while respecting the environment. By favouring hydroelectricity, a source of renewable energy, Hydro-Québec meets the needs of the present while making sure it preserves Québec’s environmental heritage and the energy supply of future generations.

The La Romaine hydropower complex is the largest infrastructure project underway in Canada. Located about 55 km from Havre-Saint-Pierre, over 2000 workers are living on the premises. The accommodations comprise dormitories, offices, cafeterias, a leisure centre, a bar and a convenience store. As such, and in sync with its sustainable development vision, Hydro-Québec had to ensure an optimal treatment of the wastewater produced by its camp to comply with stringent discharge standards. Moreover, the wastewater treatment equipment had to be demobilized after use. Hydro-Québec decided to choose a wastewater treatment system that could both achieve the treatment performance required and offer a transitional and temporary structure option in order to preserve the natural environment.

Customer comments

No comments were found for SBR Package system. Be the first to comment!