Shanghang leachate treatment project
Courtesy of Xiamen Jiarong Technology Corp., Ltd.
Capacity: 140m³/day
SS<=1000mg/L, pH:6-9, COD<=60000mg/L, BOD<=3000mg/L,NH3-N<=1200mg/L, TN<=1500mg/L,
Conductivity<=15000us/cm, recovery rate>75%
15000us/cm<conductivity<20000us/cm, recovery rate70-75%
20000us/cm<conductivity<25000us/cm, recovery rate 65-70%
25000us/cm<conductivity<30000us/cm, recovery rate 60-65%
30000us/cm<conductivity<35000us/cm, recovery rate 55-60%
35000us/cm<conductivity<40000us/cm, recovery rate 50-55%
40000us/cm<conductivity<45000us/cm, recovery rate 45-50%
conductivity>45000us/cm, recovery rate<45%
Discharge standard/GB18918-2002:
BOD<=30mg/L, COD<=100mg/L, NH3-N<=25mg/L, TN<=40mg/L, SS<=30mg/L,
-