Shaoyang Landfill Leachate Treatment Project
Capacity: 400tons/day
Process: 2 sets of DTRO containerized leachate treatment equipment
Influent water quality:
Conductivity<=40000us/cm, CODcr<=6000mg/L, BOD5<=1000mg/L, TN<=3000mg/L, NH3-N<=3000mg/L
10000us/cm<conductivity<=15000us/cm, recovery rate 75-80%
15000us/cm<conductivity<=20000us/cm, recovery rate 70-75%
20000us/cm<conductivity<=25000us/cm, recovery rate 65-70%
25000us/cm<conductivity<=30000us/cm, recovery rate 60-65%
30000us/cm<conductivity<=40000us/cm, recovery rate 55-60%
40000us/cm<conductivity<=45000us/cm, recovery rate 50-55%
Effluent water quality/Discharge standard(GB16889-2008):
CODcr<=100mg/L, BOD5<=30mg/L, SS<=30mg/L,TN<=40mg/L, NH3-N<=25mg/L